5030 Greenville Ave
Dallas, TX 75206 · 5030 Greenville Ave, LLC
Interior remodeling and restroom plumbing at 5030 Greenville Ave
City of Dallas permits indicate interior remodeling at 5030 Greenville Ave, including electrical work and restroom plumbing. The plumbing permit was filed May 27, 2025, and electrical permits followed from May 29 through June 27, 2025. The records do not identify a tenant or provide a project timeline.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Jun 27, 2025
- Projects
- 5
- 5 filings
- Latest filing
- Jun 27, 2025
- since Oct 31, 2024
- Largest scope
- 1,800 sf
- Estimated cost
- $435K
- state registration
Where this project stands
CompletedC0076 Rasing Cane's - Dallas, TX
1,800 sq ft · $435K est.
- RegisteredOct 31, 2024
- Plan review
- ConstructionFeb '25 – May '25
- Inspected
- Closed
Ran as a 3-month build.
4 contacts on this project · 4 phone numbers
Permit & project history
5 projectsInterior remodeling the subcontract agreement covers the furnishing of tools, equipment, materials, supplies, engineering, scaffolding, incidentals, labor, supervision, cleaning, services, insurance, warranties, testing, and/or any other act or thing required to diligently and fully perform and complete the portions of work described herein. 2. in addition to the foregoing, it is further understood and agreed that this subcontract agreement also includes, but is not limited to, the following conditions and items, regardless of whether or not they are in listed contract documents. the items listed below are not intended to represent each and every item necessary to perform the work. 3. all deviations from or discrepancies to the contract documents must be brought to the immediate attention of the contractor in writing with sufficient details, references, and explanations to permit proper analysis. suggested solutions or substitutions shall accompany the notification whenever possible. 4. all work shall meet or exceed any and all applicable local, city, state, or federal codes and guidelines. 5. the subcontractor shall set up, arrange, coordinate, and obtain all inspections for its work as required by any authorized agency or applicable code. arrangements for the inspection of any area, system, equipment, etc., that are in need of testing or inspection prior to being covered up must be made by the subcontractor in sufficient time to allow for inspections so as not to impact the project schedule. in the event of low or substandard test results, the subcontractor shall be responsible for all costs involved in retesting of the materials/work in question and the replacement of inadequate materials/work. 6. subcontractor is responsible for providing certifications and licensing as required. 7. subcontractor is responsible for all fees 8. subcontractor is responsible for taxes 9. subcontractor shall provide competent personnel supervision at all times while on site and during your contracted trade inspections ($250.00 associated fee for each absence). 10. contractor shall provide general building permit. all other permits or special permits, fees, and licenses for subcontractor's work are included in subcontractor's scope. 11. subcontractor is responsible for layout required to perform subcontractor's scope of work. it shall also be the responsibility of the subcontractor to maintain and preserve all stakes and other control established by contractor or owner. if control or stakes are destroyed by subcontractor, they will be replaced at subcontractor's expense. 12. any cutting, core-drilling, access, cleanup, patching, repair, filling, disposal, etc. as required to install subcontractor's work is included in this scope of work. 13. subcontractor shall comply with contractor's safety standards / osha guidelines. contractor will correct unaddressed life- threatening safety issues at subcontractor's expense without written notice. 14. subcontractor is responsible for daily cleanup of its work. 15. subcontractor is responsible for the safety, security, and protection of its work, tools, equipment, and materials. 16. demolition (if applicable) will be done in a professional manner in accordance with industry standards. salvage all materials as indicated to be either stored or reused as required per subcontractor's scope of work. 17. each subcontractor will be responsible for sealing penetrations through walls, slabs, floor, and roofs so as to make water- tight, acoustically sealed, security proof as required, and/or to maintain the applicable smoke or fire ratings. 18. each subcontractor is responsible for placement of his embeds, sleeves, blockouts, and penetrations in walls, slabs, beams in accordance with the contract documents, with special attention to be paid to structural requirements. – as applicable
Interior remodeling the subcontract agreement covers the furnishing of tools, equipment, materials, supplies, engineering, scaffolding, incidentals, labor, supervision, cleaning, services, insurance, warranties, testing, and/or any other act or thing required to diligently and fully perform and complete the portions of work described herein. 2. in addition to the foregoing, it is further understood and agreed that this subcontract agreement also includes, but is not limited to, the following conditions and items, regardless of whether or not they are in listed contract documents. the items listed below are not intended to represent each and every item necessary to perform the work. 3. all deviations from or discrepancies to the contract documents must be brought to the immediate attention of the contractor in writing with sufficient details, references, and explanations to permit proper analysis. suggested solutions or substitutions shall accompany the notification whenever possible. 4. all work shall meet or exceed any and all applicable local, city, state, or federal codes and guidelines. 5. the subcontractor shall set up, arrange, coordinate, and obtain all inspections for its work as required by any authorized agency or applicable code. arrangements for the inspection of any area, system, equipment, etc., that are in need of testing or inspection prior to being covered up must be made by the subcontractor in sufficient time to allow for inspections so as not to impact the project schedule. in the event of low or substandard test results, the subcontractor shall be responsible for all costs involved in retesting of the materials/work in question and the replacement of inadequate materials/work. 6. subcontractor is responsible for providing certifications and licensing as required. 7. subcontractor is responsible for all fees 8. subcontractor is responsible for taxes 9. subcontractor shall provide competent personnel supervision at all times while on site and during your contracted trade inspections ($250.00 associated fee for each absence). 10. contractor shall provide general building permit. all other permits or special permits, fees, and licenses for subcontractor's work are included in subcontractor's scope. 11. subcontractor is responsible for layout required to perform subcontractor's scope of work. it shall also be the responsibility of the subcontractor to maintain and preserve all stakes and other control established by contractor or owner. if control or stakes are destroyed by subcontractor, they will be replaced at subcontractor's expense. 12. any cutting, core-drilling, access, cleanup, patching, repair, filling, disposal, etc. as required to install subcontractor's work is included in this scope of work. 13. subcontractor shall comply with contractor's safety standards / osha guidelines. contractor will correct unaddressed life- threatening safety issues at subcontractor's expense without written notice. 14. subcontractor is responsible for daily cleanup of its work. 15. subcontractor is responsible for the safety, security, and protection of its work, tools, equipment, and materials. 16. demolition (if applicable) will be done in a professional manner in accordance with industry standards. salvage all materials as indicated to be either stored or reused as required per subcontractor's scope of work. 17. each subcontractor will be responsible for sealing penetrations through walls, slabs, floor, and roofs so as to make water- tight, acoustically sealed, security proof as required, and/or to maintain the applicable smoke or fire ratings. 18. each subcontractor is responsible for placement of his embeds, sleeves, blockouts, and penetrations in walls, slabs, beams in accordance with the contract documents, with special attention to be paid to structural requirements. – as applicable
City of Dallas permitCommercial Electrical PermitInterior remodeling the subcontract agreement covers the furnishing of tools, equipment, materials, supplies, engineering, scaffolding,incidentals, labor, supervision, cleaning, services, insurance, warranties, testing, and/or any other act or thing required todiligently and fully perform and complete the portions of work described herein.2. in addition to the foregoing, it is further understood and agreed that this subcontract agreement also includes, but is notlimited to, the following conditions and items, regardless of whether or not they are in listed contract documents. theitems listed below are not intended to represent each and every item necessary to perform the work.3. all deviations from or discrepancies to the contract documents must be brought to the immediate attention of thecontractor in writing with sufficient details, references, and explanations to permit proper analysis. suggested solutions orsubstitutions shall accompany the notification whenever possible.4. all work shall meet or exceed any and all applicable local, city, state, or federal codes and guidelines.5. the subcontractor shall set up, arrange, coordinate, and obtain all inspections for its work as required by any authorizedagency or applicable code. arrangements for the inspection of any area, system, equipment, etc., that are in need of testingor inspection prior to being covered up must be made by the subcontractor in sufficient time to allow for inspections so asnot to impact the project schedule. in the event of low or substandard test results, the subcontractor shall be responsible forall costs involved in retesting of the materials/work in question and the replacement of inadequate materials/work.6. subcontractor is responsible for providing certifications and licensing as required.7. subcontractor is responsible for all fees8. subcontractor is responsible for taxes9. subcontractor shall provide competent personnel supervision at all times while on site and during your contracted tradeinspections ($250.00 associated fee for each absence).10. contractor shall provide general building permit. all other permits or special permits, fees, and licenses forsubcontractor's work are included in subcontractor's scope.11. subcontractor is responsible for layout required to perform subcontractor's scope of work. it shall also be theresponsibility of the subcontractor to maintain and preserve all stakes and other control established by contractor orowner. if control or stakes are destroyed by subcontractor, they will be replaced at subcontractor's expense.12. any cutting, core-drilling, access, cleanup, patching, repair, filling, disposal, etc. as required to install subcontractor'swork is included in this scope of work.13. subcontractor shall comply with contractor's safety standards / osha guidelines. contractor will correct unaddressed life-threatening safety issues at subcontractor's expense without written notice.14. subcontractor is responsible for daily cleanup of its work.15. subcontractor is responsible for the safety, security, and protection of its work, tools, equipment, and materials.16. demolition (if applicable) will be done in a professional manner in accordance with industry standards. salvage allmaterials as indicated to be either stored or reused as required per subcontractor's scope of work.17. each subcontractor will be responsible for sealing penetrations through walls, slabs, floor, and roofs so as to make water-tight, acoustically sealed, security proof as required, and/or to maintain the applicable smoke or fire ratings.18. each subcontractor is responsible for placement of his embeds, sleeves, blockouts, and penetrations in walls, slabs, beamsin accordance with the contract documents, with special attention to be paid to structural requirements. – as applicable
Interior remodeling the subcontract agreement covers the furnishing of tools, equipment, materials, supplies, engineering, scaffolding,incidentals, labor, supervision, cleaning, services, insurance, warranties, testing, and/or any other act or thing required todiligently and fully perform and complete the portions of work described herein.2. in addition to the foregoing, it is further understood and agreed that this subcontract agreement also includes, but is notlimited to, the following conditions and items, regardless of whether or not they are in listed contract documents. theitems listed below are not intended to represent each and every item necessary to perform the work.3. all deviations from or discrepancies to the contract documents must be brought to the immediate attention of thecontractor in writing with sufficient details, references, and explanations to permit proper analysis. suggested solutions orsubstitutions shall accompany the notification whenever possible.4. all work shall meet or exceed any and all applicable local, city, state, or federal codes and guidelines.5. the subcontractor shall set up, arrange, coordinate, and obtain all inspections for its work as required by any authorizedagency or applicable code. arrangements for the inspection of any area, system, equipment, etc., that are in need of testingor inspection prior to being covered up must be made by the subcontractor in sufficient time to allow for inspections so asnot to impact the project schedule. in the event of low or substandard test results, the subcontractor shall be responsible forall costs involved in retesting of the materials/work in question and the replacement of inadequate materials/work.6. subcontractor is responsible for providing certifications and licensing as required.7. subcontractor is responsible for all fees8. subcontractor is responsible for taxes9. subcontractor shall provide competent personnel supervision at all times while on site and during your contracted tradeinspections ($250.00 associated fee for each absence).10. contractor shall provide general building permit. all other permits or special permits, fees, and licenses forsubcontractor's work are included in subcontractor's scope.11. subcontractor is responsible for layout required to perform subcontractor's scope of work. it shall also be theresponsibility of the subcontractor to maintain and preserve all stakes and other control established by contractor orowner. if control or stakes are destroyed by subcontractor, they will be replaced at subcontractor's expense.12. any cutting, core-drilling, access, cleanup, patching, repair, filling, disposal, etc. as required to install subcontractor'swork is included in this scope of work.13. subcontractor shall comply with contractor's safety standards / osha guidelines. contractor will correct unaddressed life-threatening safety issues at subcontractor's expense without written notice.14. subcontractor is responsible for daily cleanup of its work.15. subcontractor is responsible for the safety, security, and protection of its work, tools, equipment, and materials.16. demolition (if applicable) will be done in a professional manner in accordance with industry standards. salvage allmaterials as indicated to be either stored or reused as required per subcontractor's scope of work.17. each subcontractor will be responsible for sealing penetrations through walls, slabs, floor, and roofs so as to make water-tight, acoustically sealed, security proof as required, and/or to maintain the applicable smoke or fire ratings.18. each subcontractor is responsible for placement of his embeds, sleeves, blockouts, and penetrations in walls, slabs, beamsin accordance with the contract documents, with special attention to be paid to structural requirements. – as applicable
City of Dallas permitCommercial Electrical Permit(2) - pull and reset new commode - flush valve included(1) - pull and reset new urinal - flush valve included(2) - new floor drain (restrooms)(2) - pull and reset new lavatory - faucet included- water to be in copper- water to be within restroom wall- drain and vent to be within restroom wall(2) - rework location of floor drains by ice bins
(2) - pull and reset new commode - flush valve included(1) - pull and reset new urinal - flush valve included(2) - new floor drain (restrooms)(2) - pull and reset new lavatory - faucet included- water to be in copper- water to be within restroom wall- drain and vent to be within restroom wall(2) - rework location of floor drains by ice bins
City of Dallas permitCommercial Plumbing PermitExterior and interior renovation — c0076 rasing cane's - dallas, tx
TDLR project registrationRenovation/AlterationProject Closed1,800 sq ft$435K est.- Project #
- TABS2025004531
- Tenant / owner
- Pro
- Design firm
- Pro
- Contact
- Pro
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 5030 Greenville Ave
What is being built at 5030 Greenville Ave?
Dallas permits indicate interior remodeling, with electrical work and restroom plumbing. The records do not identify a new building or tenant.
When were permits filed for 5030 Greenville Ave?
The earliest listed permit was filed May 27, 2025, for plumbing work. Electrical permits were filed May 29, June 24, and June 27, 2025.
What does the plumbing permit at 5030 Greenville Ave cover?
Permit COM-PLM-25-000246, filed May 27, 2025, describes resetting restroom fixtures, adding two floor drains, and changing floor-drain locations by ice bins.
What electrical work is permitted at 5030 Greenville Ave?
Three commercial electrical permits describe interior remodeling: COM-ELC-25-000225, COM-ELC-25-000571, and COM-ELC-25-000634. The descriptions do not specify the electrical work in detail.
Is a new restaurant opening at 5030 Greenville Ave?
The available permits do not identify a restaurant or any tenant. They describe interior remodeling and restroom plumbing work.
What is being remodeled near Atelier Yoga on Greenville Avenue?
Permits indicate interior remodeling at 5030 Greenville Ave, about 140 meters from Atelier Yoga at 4912 Greenville Ave. The records do not name the occupant.
Also being built nearby
All of 75206- 5010 Greenville AveJul 27, 2026New 5 ton split system · 32 m away
- 5111 Greenville Ave · Westwood FinancialJul 23, 2025Repair sewer line · 75 m away
- 5111 Greenville Avenue · Westwood FinancialJul 12, 2024Activate games - highland park — renovation/alteration — tenant improvement project involves 10,426 sq ft within an existing building. the proposed work involves constructing game rooms, restrooms, new partitions, ceilings, lighting, hvac, and finishes · 75 m away
- 5116 Greenville AveMay 15, 2026Mcr need to confirm if permit needed. similar scope on com-alt-add-25-000894 was permitted then inspector canceled permit. the exterior renovation project scope of work includes replacing andproposing new bollards to enhance the protection of the existing buildingand site features. existing wheel stops that are no longer needed shall beremoved. all new and replaced bollards shall provide the latest boa brandstandards for consistent color and appearance throughout the branch.overall, the improvements proposed to enhance the appearance and safetyof the development · 76 m away
- 4930 Greenville AveJul 27, 2026Oncor's drop and one of the feeders were damaged by a garbage truck. service needs to be disconnected for repair, but oncor requires the meter base to be relocated to the exterior of the building.we are installing a new 320-amp meter base and a new 400-amp fusible disconnect on the exterior, installing new parallel feeders, and reworking grounds to the new first means of disconnect · 94 m away
- 5646 Milton Street · US Energy Square, LLCFeb 11, 2025Swa group — renovation/alteration — renovation of existing b occupancy office space on level 1. all building core elements to remain. tenant improvement work entails new non-bearing partitions, millwork, ceiling/lighting, doors/frames, power/communication and new finishes · 121 m away
- 5646 Milton Strett · US Energy Square, LLCApr 13, 2026On partners — renovation/alteration — 3,309 sq ft of tenant improvement · 121 m away
- 5646 Milton StJun 23, 2026Relocate gas meter · 121 m away
- 4914 Greenville AveMay 4, 2026Gas test · 132 m away
- 5649 Milton Street · US Energy Square, LLCApr 5, 2024Welch architecture — renovation/alteration — 1,101 sq ft of tenant improvement · 140 m away
- 4912 Greenville AveMar 19, 2026Install 2 3-ton package units, install all ductwork, install drain lines, install exhaust fans in restrooms · 140 m away
- 4908 Greenville Ave · Veery Green LLCJan 6, 2026Install mini split system · 156 m away
More demolitions in 75206.