5649 Milton Street
Dallas, TX 75206 · US Energy Square, LLC
Welch Architecture tenant improvement at 5649 Milton Street
A 1,101-square-foot tenant improvement for Welch Architecture was registered at 5649 Milton Street on April 5, 2024. The TDLR record classifies the work as a renovation or alteration and lists an estimated project cost of $115,000; its status is closed.
Summarized from Texas Department of Licensing and Regulation records · updated Apr 5, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Apr 5, 2024
- since Apr 5, 2024
- Largest scope
- 1,101 sf
- Estimated cost
- $115K
- state registration
Where this project stands
CompletedWelch Architecture
1,101 sq ft · $115K est.
- RegisteredApr 5, 2024
- Plan review
- ConstructionApr '24 – Jun '24
- Inspected
- Closed
Ran as a 2-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 project1,101 sq ft of tenant improvement. — meadows building
TDLR project registrationRenovation/AlterationProject Closed1,101 sq ft$115K est.- Project #
- TABS2024015548
- Tenant / owner
- Welch Architecture
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 5649 Milton Street
What is being built at 5649 Milton Street?
A TDLR registration describes a 1,101-square-foot tenant improvement for Welch Architecture. It is classified as a renovation or alteration, not a new building.
When was the work at 5649 Milton Street permitted?
The TDLR project registration was filed on April 5, 2024, under project number TABS2024015548.
How much does the 5649 Milton Street project cost?
The TDLR record lists an estimated project cost of $115,000. This is the applicant’s estimate.
Is a new office building going up near US Energy Square?
The record for 5649 Milton Street describes a 1,101-square-foot tenant improvement for Welch Architecture, not construction of a new office building.
What is the project status at 5649 Milton Street?
The TDLR registration for the Welch Architecture tenant improvement is marked Project Closed.
Also being built nearby
All of 75206- 5646 Milton StJun 23, 2026Relocate gas meter · 21 m away
- 5646 Milton Street · US Energy Square, LLCFeb 11, 2025Swa group — renovation/alteration — renovation of existing b occupancy office space on level 1. all building core elements to remain. tenant improvement work entails new non-bearing partitions, millwork, ceiling/lighting, doors/frames, power/communication and new finishes · 21 m away
- 5646 Milton Strett · US Energy Square, LLCApr 13, 2026On partners — renovation/alteration — 3,309 sq ft of tenant improvement · 21 m away
- 5603 Milton StOct 12, 2020Install 3 new un-manned cabinets / video kiosks, four dot antennas, underground fiber vault power · 36 m away
- 5111 Greenville Avenue · Westwood FinancialJul 12, 2024Activate games - highland park — renovation/alteration — tenant improvement project involves 10,426 sq ft within an existing building. the proposed work involves constructing game rooms, restrooms, new partitions, ceilings, lighting, hvac, and finishes · 79 m away
- 5111 Greenville Ave · Westwood FinancialJul 23, 2025Repair sewer line · 79 m away
- 6688 N Central ExpyNov 16, 2026New ductwork and grilles and makeup air unit · 124 m away
- 6688 North Central Expressway · Energy Square LLCSep 24, 2025Energy square iii amenities — renovation/alteration — 7,400 sq ft renovation of a cafe on the 1st floor of an existing office building · 124 m away
- 5030 Greenville Ave · 5030 Greenville Ave, LLCJun 27, 2025Interior remodeling the subcontract agreement covers the furnishing of tools, equipment, materials, supplies, engineering, scaffolding, incidentals, labor, supervision, cleaning, services, insurance, warranties, testing, and/or any other act or thing required to diligently and fully perform and complete the portions of work described herein. 2. in addition to the foregoing, it is further understood and agreed that this subcontract agreement also includes, but is not limited to, the following conditions and items, regardless of whether or not they are in listed contract documents. the items listed below are not intended to represent each and every item necessary to perform the work. 3. all deviations from or discrepancies to the contract documents must be brought to the immediate attention of the contractor in writing with sufficient details, references, and explanations to permit proper analysis. suggested solutions or substitutions shall accompany the notification whenever possible. 4. all work shall meet or exceed any and all applicable local, city, state, or federal codes and guidelines. 5. the subcontractor shall set up, arrange, coordinate, and obtain all inspections for its work as required by any authorized agency or applicable code. arrangements for the inspection of any area, system, equipment, etc., that are in need of testing or inspection prior to being covered up must be made by the subcontractor in sufficient time to allow for inspections so as not to impact the project schedule. in the event of low or substandard test results, the subcontractor shall be responsible for all costs involved in retesting of the materials/work in question and the replacement of inadequate materials/work. 6. subcontractor is responsible for providing certifications and licensing as required. 7. subcontractor is responsible for all fees 8. subcontractor is responsible for taxes 9. subcontractor shall provide competent personnel supervision at all times while on site and during your contracted trade inspections ($250.00 associated fee for each absence). 10. contractor shall provide general building permit. all other permits or special permits, fees, and licenses for subcontractor's work are included in subcontractor's scope. 11. subcontractor is responsible for layout required to perform subcontractor's scope of work. it shall also be the responsibility of the subcontractor to maintain and preserve all stakes and other control established by contractor or owner. if control or stakes are destroyed by subcontractor, they will be replaced at subcontractor's expense. 12. any cutting, core-drilling, access, cleanup, patching, repair, filling, disposal, etc. as required to install subcontractor's work is included in this scope of work. 13. subcontractor shall comply with contractor's safety standards / osha guidelines. contractor will correct unaddressed life- threatening safety issues at subcontractor's expense without written notice. 14. subcontractor is responsible for daily cleanup of its work. 15. subcontractor is responsible for the safety, security, and protection of its work, tools, equipment, and materials. 16. demolition (if applicable) will be done in a professional manner in accordance with industry standards. salvage all materials as indicated to be either stored or reused as required per subcontractor's scope of work. 17. each subcontractor will be responsible for sealing penetrations through walls, slabs, floor, and roofs so as to make water- tight, acoustically sealed, security proof as required, and/or to maintain the applicable smoke or fire ratings. 18. each subcontractor is responsible for placement of his embeds, sleeves, blockouts, and penetrations in walls, slabs, beams in accordance with the contract documents, with special attention to be paid to structural requirements. – as applicable · 140 m away
- 5116 Greenville AveMay 15, 2026Mcr need to confirm if permit needed. similar scope on com-alt-add-25-000894 was permitted then inspector canceled permit. the exterior renovation project scope of work includes replacing andproposing new bollards to enhance the protection of the existing buildingand site features. existing wheel stops that are no longer needed shall beremoved. all new and replaced bollards shall provide the latest boa brandstandards for consistent color and appearance throughout the branch.overall, the improvements proposed to enhance the appearance and safetyof the development · 144 m away
- 5010 Greenville AveJul 27, 2026New 5 ton split system · 151 m away
- 4930 Greenville AveJul 27, 2026Oncor's drop and one of the feeders were damaged by a garbage truck. service needs to be disconnected for repair, but oncor requires the meter base to be relocated to the exterior of the building.we are installing a new 320-amp meter base and a new 400-amp fusible disconnect on the exterior, installing new parallel feeders, and reworking grounds to the new first means of disconnect · 162 m away