5532 Willis Ave
Dallas, TX 75206
5532 Willis Ave: 2 projects on record
City of Dallas lists 2 filings across 2 projects at 5532 Willis Ave, Dallas, TX 75206. The most recent, filed November 13, 2020, covers: “Install roof mounted solar pv panels”.
Compiled from City of Dallas records · updated Nov 13, 2020
- Projects
- 2
- 2 filings
- Latest filing
- Nov 13, 2020
- since Nov 13, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 5532 Willis Ave
What is being built at 5532 Willis Ave?
The latest filing (City of Dallas permit 2010271005, November 13, 2020) covers install roof mounted solar pv panels.
How many permits and filings does 5532 Willis Ave have?
2 filings across 2 projects, from November 13, 2020 to November 13, 2020.
Is there other construction near 5532 Willis Ave?
Yes. Nearby filings include 5535 Willis Ave (residential re roof using iko asphalt composition shingles, Apr 27, 2026); 5539 Willis Ave (install drive approach only, Nov 11, 2020); 5525 Willis Ave (replacing 4 ton gas complete system, Aug 25, 2026).
How do I get alerts for new permits at 5532 Willis Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75206- 5535 Willis AveApr 27, 2026Residential re roof using iko asphalt composition shingles · 13 m away
- 5539 Willis AveNov 11, 2020Install drive approach only · 18 m away
- 5525 Willis AveAug 25, 2026Replacing 4 ton gas complete system · 22 m away
- 5548 Willis AveJul 31, 2026Gas relay under house and yard · 35 m away
- 5527 Richard AveAug 11, 2026Install 174lf 8' side by side horizontal wooden fencing · 103 m away
- 5541 Richard AveAug 26, 2026Installation of whole-house automatic water shut off valve · 104 m away
- 5523 Richard AveSep 9, 2026Install 259lf 8' board on board horizontal wooden fencing · 104 m away
- 5545 Richard AveNov 5, 2025The city sidewalk in front of mrs. oxners piece of land is all broken up and in bad shape. good deal builder plans to remove the old concrete and pour a new sidewalk with 3/8ths rebar through out. it is approx. 37' long by 4' wide · 105 m away
- 5519 Richard AveSep 9, 2025Panel replacement · 107 m away
- 5551 Richard AveOct 24, 2025Take overhead to underground · 110 m away
- 5513 Richard AveOct 13, 2026Building 164' of new fence, board on board with cap. the fence will be 6' for the first 40' and then step up to 8' along the west side of the house and the back of the house. this will also include a 20' electric sliding gate on the back at 8' tall. installing 2 new gates on both sides of the house. east side gate section is 10' wide with a standard 4' walk gate, west side is a 6' wide section with astandard 4' walk gate. includes demolition of existing fence on west side and moving the whole fence 18" further west to follow property line. fence is already erected. needing final inspection · 111 m away
- 5509 Richard AveDec 24, 2020Install lawn sprinkler · 115 m away
More solar installs in 75206.