1745 Levee St
Dallas, TX 75207
1745 Levee St: 9 projects on record
City of Dallas lists 9 filings across 9 projects at 1745 Levee St, Dallas, TX 75207 since January 14, 2021. The most recent, filed January 21, 2021, covers: “Install fence”.
Compiled from City of Dallas records · updated Jan 21, 2021
- Projects
- 9
- 9 filings
- Latest filing
- Jan 21, 2021
- since Jan 14, 2021
- Largest scope
- —
- Listed value
- $8
- partial · often understated
Permit & project history
9 projectsWhitebox-removal of all interior non-bearing walls only-no build back allowed with this permit-seper
Whitebox-removal of all interior non-bearing walls only-no build back allowed with this permit-seper
City of Dallas permitBuilding (BU) Commercial Renovation$5
Sources: City of Dallas
Questions about 1745 Levee St
What is being built at 1745 Levee St?
The latest filing (City of Dallas permit 2101191014, January 21, 2021) covers install fence.
How many permits and filings does 1745 Levee St have?
9 filings across 9 projects, from January 14, 2021 to January 21, 2021.
How much is the construction at 1745 Levee St worth?
Permits at this address list about $8 in valuations. Permit valuations are often partial and understate total project cost.
What is being built near Bravo Energy in Dallas?
1745 Levee St is about 93 m from Bravo Energy (1511 E. Levee). Its latest filing is for install fence.
Is there other construction near 1745 Levee St?
Yes. Nearby filings include 1511 E. Levee (bravo energy — renovation/alteration — interior remodel with new office partitions, Aug 27, 2024); 1511 Levee St (1511 levee suite b - interior remodel, Nov 19, 2025); 1815 Levee St (gas test, Nov 4, 2025).
How do I get alerts for new permits at 1745 Levee St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75207- 1511 E. Levee · Bravo EnergyAug 27, 2024Bravo energy — renovation/alteration — interior remodel with new office partitions · 93 m away
- 1511 Levee StNov 19, 20251511 levee suite b - interior remodel · 93 m away
- 1815 Levee StNov 4, 2025Gas test · 97 m away
- 1821 Levee StJan 12, 2021To complete work permit 1701111072 · 124 m away
- 1835 Levee StOct 29, 2020Gas test · 186 m away
- 155 Riveredge Dr · Riveredge Owner LPNov 11, 2026Mcr location address: 155 riveredge dr dallas, tx 75207 level 3 scope of work:1 st gen ti within a portion of the 3rd floor, approx 27,500 sq ft scope includes minor demolition, new partitions, ceilings, millwork, finishes, and modifications to the mechanical, electrical, and plumbing systems to support the new space · 194 m away
- 1839 Levee StOct 29, 2020Gas test · 204 m away
- 1841 Levee StSep 10, 2026Remodel plumbing · 213 m away
- 1105 Levee StAug 14, 2026Primetime electrical contractors will install a new 400-amp electrical service (480volt) for the building to meet current and future power demands. scope includes: • installation of a 400-amp meter base on the exterior of the building in compliance with local utility and nec requirements. • installation of a 400-amp service disconnect adjacent to the meter base to provide a code-compliant means of disconnect. • installation of a 400-amp i-line distribution panel inside the building to serve as the main distribution point for interior loads. • installation of a step-down transformer to reduce the incoming 480v service to 240/120v for existing lighting and receptacle circuits. • wreck out existing interior meter, after the power company cut it off. • all conduit, conductors, grounding, bonding, and terminations will be completed per the code and local authority requirements. • the system will be tested, labeled, and verified for full functionality upon completion · 222 m away
- 1211 E Levee St · Giamrone Design District Projects LLCMay 20, 2024Sounders event space — renovation/alteration — tenant finish-out · 222 m away
- 1105 E Levee St · Trips Levee Gp LLCMay 21, 2026Thermo 480v power — renovation/alteration — install 3 phase 480 electrical to building, and change rear exit to swinging door · 222 m away
- 120 Turtle Creek BlvdOct 23, 2026Relocate gas main line · 235 m away