Dallas permit lists a 16-by-28-by-3-foot commercial alteration
A City of Dallas permit record lists a commercial alteration/addition at 1809 W Davis St, described as 16 by 28 by 3 feet. The permit was filed October 28, 2026, and its description says the work was to go up October 29 and come down November 2. The record does not specify what the work involves.
Summarized from City of Dallas records · updated Oct 28, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Oct 28, 2026
- since Oct 28, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 1809 W Davis St
What is being built at 1809 W Davis St?
A City of Dallas commercial alteration/addition permit describes work measuring 16 by 28 by 3 feet. The record does not identify what is being built.
When was the permit filed for 1809 W Davis St?
The City of Dallas permit was filed October 28, 2026. Its number is COM-ALT-ADD-26-002636.
How long is the work at 1809 W Davis St scheduled to be up?
The permit description says the work was to go up October 29, 2026, and come down November 2, 2026.
What are the dimensions listed on the 1809 W Davis St permit?
The permit description lists dimensions of 16 by 28 by 3 feet.
Is the 1809 W Davis St permit for a commercial project?
Yes. The City of Dallas record is categorized as a Commercial Alteration Addition Permit.
Also being built nearby
All of 75208- 601 N Rosemont AveJul 14, 2026270' 1x6x8 cedar board on board, 3 wood frame walk gates · 73 m away
- 609 N Rosemont AveJul 7, 2025The proposed work includes the removal and replacement of the existing roofing system with atlas impact class 4 shingles in pewter ir. ridge venting will be installed, and existing attic vents will be removed. drip edge will be upgraded to 3" galvanized gravel stop, and all roof jacks will be replaced with black bullet boots. chimney flashing will be replaced. the gutter system will be upgraded to a 5" gutter and downspout system (color tuxedo grey), with full gutter wrap included. a minimum of 10 decking boards will be repaired or replaced using 1" x 6" tongue and groove boards. a 5" bullet boot and a 1.5" split boot will also be installed as needed. no changes will be made to the building’s architectural style or visual appearance beyond the replacement of existing materials with updated equivalents · 74 m away
- 619 N Rosemont AveJun 20, 2025This project involves the full removal and replacement of the existing roofing system, roofing components, and gutter system on the primary residence and detached garage.the new roofing system will use atlas pinnacle pristine architectural shingles with a high profile hip and ridge, in the color black shadow. normal osb decking over battens will be used where necessary. bullet boot roof jacks in black will be installed throughout. the drip edge will be replaced with black-colored flashing, and chimney flashing will be replaced as part of the scope.in addition, full wrap seamless gutters and downspouts, finished in black will be installed.no painting or staining of any kind will be performed as part of this project. this includes no stain or paint application on surfaces, trim, or other materials, as all finish work has been marked "do not do." the chimney chase is not to be altered in any way.the work will be completed without modifying the existing height, slope, or footprint of the roof. no additional structural or cosmetic alterations beyond those described · 78 m away
- 610 N Rosemont AveJul 17, 2026270' 1x6x8 cedar board on board, 3 wood frame walk gates · 87 m away
- 622 N Rosemont AveSep 26, 2025Nsfaa-remove existing front porch coverconstruct new front porch coverreroof housepaint house · 92 m away
- 425 N Rosemont AveOct 9, 2020Interior remodel of 23 units for a mfd · 143 m away
- 414 N Rosemont AveMay 15, 2025Gas leak and repair · 155 m away
- 1655 Ranier StJul 8, 2025Dsst -disd rosemont upper previously submitted as a paper project. addition and renovation to existing school · 162 m away
- 627 N Montclair AveOct 26, 2026Replacing the feeder conductors for the overhead service · 181 m away
- 606 N Montclair AveMar 5, 2026Replace prv · 190 m away
- 314 N Waverly DrAug 28, 2025Gas water heater replacement · 195 m away
- 500 N Montclair AveJun 30, 2025Replaced all sanitary sewer under pier and beam foundation to two full bathrooms, one kitchen and one laundry room · 198 m away