609 N Rosemont Ave
Dallas, TX 75208
609 N Rosemont Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 609 N Rosemont Ave, Dallas, TX 75208. The most recent, filed July 7, 2025, covers: “The proposed work includes the removal and replacement of the existing roofing system with atlas impact class 4 shingles in pewter ir. ridge venting will be installed, and existing attic vents will be removed. drip edge will be upgraded to 3" galvanized gravel stop, and all roof jacks will be replaced with black bullet boots. chimney flashing will be replaced. the gutter system will be upgraded to a 5" gutter and downspout system (color tuxedo grey), with full gutter wrap included. a minimum of 10 decking boards will be repaired or replaced using 1" x 6" tongue and groove boards. a 5" bullet boot and a 1.5" split boot will also be installed as needed. no changes will be made to the building’s architectural style or visual appearance beyond the replacement of existing materials with updated equivalents”.
Compiled from City of Dallas records · updated Jul 7, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 7, 2025
- since Jul 7, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectThe proposed work includes the removal and replacement of the existing roofing system with atlas impact class 4 shingles in pewter ir. ridge venting will be installed, and existing attic vents will be removed. drip edge will be upgraded to 3" galvanized gravel stop, and all roof jacks will be replaced with black bullet boots. chimney flashing will be replaced. the gutter system will be upgraded to a 5" gutter and downspout system (color tuxedo grey), with full gutter wrap included. a minimum of 10 decking boards will be repaired or replaced using 1" x 6" tongue and groove boards. a 5" bullet boot and a 1.5" split boot will also be installed as needed. no changes will be made to the building’s architectural style or visual appearance beyond the replacement of existing materials with updated equivalents
The proposed work includes the removal and replacement of the existing roofing system with atlas impact class 4 shingles in pewter ir. ridge venting will be installed, and existing attic vents will be removed. drip edge will be upgraded to 3" galvanized gravel stop, and all roof jacks will be replaced with black bullet boots. chimney flashing will be replaced. the gutter system will be upgraded to a 5" gutter and downspout system (color tuxedo grey), with full gutter wrap included. a minimum of 10 decking boards will be repaired or replaced using 1" x 6" tongue and groove boards. a 5" bullet boot and a 1.5" split boot will also be installed as needed. no changes will be made to the building’s architectural style or visual appearance beyond the replacement of existing materials with updated equivalents
City of Dallas permitResidential Roofing Permit
Sources: City of Dallas
Questions about 609 N Rosemont Ave
What is being built at 609 N Rosemont Ave?
The latest filing (City of Dallas permit RES-ROOF-25-000420, July 7, 2025) covers the proposed work includes the removal and replacement of the existing roofing system with atlas impact class 4 shingles in pewter ir. ridge venting will be installed, and existing attic vents will be removed. drip edge will be upgraded to 3" galvanized gravel stop, and all roof jacks will be replaced with black bullet boots. chimney flashing will be replaced. the gutter system will be upgraded to a 5" gutter and downspout system (color tuxedo grey), with full gutter wrap included. a minimum of 10 decking boards will be repaired or replaced using 1" x 6" tongue and groove boards. a 5" bullet boot and a 1.5" split boot will also be installed as needed. no changes will be made to the building’s architectural style or visual appearance beyond the replacement of existing materials with updated equivalents.
How many permits and filings does 609 N Rosemont Ave have?
1 filing across 1 project, from July 7, 2025 to July 7, 2025.
What is being built near Dallas Independent School District in Dallas?
609 N Rosemont Ave is about 201 m from Dallas Independent School District (719 N. Montclair Ave). Its latest filing is for the proposed work includes the removal and replacement of the existing roofing system with atlas impact class 4 shingles in pewter ir. ridge venting will be installed, and existing attic vents will be removed. drip edge will be upgraded to 3" galvanized gravel stop, and all roof jacks will be replaced with black bullet boots. chimney flashing will be replaced. the gutter system will be upgraded to a 5" gutter and downspout system (color tuxedo grey), with full gutter wrap included. a minimum of 10 decking boards will be repaired or replaced using 1" x 6" tongue and groove boards. a 5" bullet boot and a 1.5" split boot will also be installed as needed. no changes will be made to the building’s architectural style or visual appearance beyond the replacement of existing materials with updated equivalents.
Is there other construction near 609 N Rosemont Ave?
Yes. Nearby filings include 601 N Rosemont Ave (270' 1x6x8 cedar board on board, 3 wood frame walk gates, Jul 14, 2026); 610 N Rosemont Ave (270' 1x6x8 cedar board on board, 3 wood frame walk gates, Jul 17, 2026); 619 N Rosemont Ave (this project involves the full removal and replacement of the existing roofing system, roofing components, and gutter system on the primary residence and detached garage.the new roofing system will use atlas pinnacle pristine architectural shingles with a high profile hip and ridge, in the color black shadow. normal osb decking over battens will be used where necessary. bullet boot roof jacks in black will be installed throughout. the drip edge will be replaced with black-colored flashing, and chimney flashing will be replaced as part of the scope.in addition, full wrap seamless gutters and downspouts, finished in black will be installed.no painting or staining of any kind will be performed as part of this project. this includes no stain or paint application on surfaces, trim, or other materials, as all finish work has been marked "do not do." the chimney chase is not to be altered in any way.the work will be completed without modifying the existing height, slope, or footprint of the roof. no additional structural or cosmetic alterations beyond those described, Jun 20, 2025).
How do I get alerts for new permits at 609 N Rosemont Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 601 N Rosemont AveJul 14, 2026270' 1x6x8 cedar board on board, 3 wood frame walk gates · 12 m away
- 610 N Rosemont AveJul 17, 2026270' 1x6x8 cedar board on board, 3 wood frame walk gates · 13 m away
- 619 N Rosemont AveJun 20, 2025This project involves the full removal and replacement of the existing roofing system, roofing components, and gutter system on the primary residence and detached garage.the new roofing system will use atlas pinnacle pristine architectural shingles with a high profile hip and ridge, in the color black shadow. normal osb decking over battens will be used where necessary. bullet boot roof jacks in black will be installed throughout. the drip edge will be replaced with black-colored flashing, and chimney flashing will be replaced as part of the scope.in addition, full wrap seamless gutters and downspouts, finished in black will be installed.no painting or staining of any kind will be performed as part of this project. this includes no stain or paint application on surfaces, trim, or other materials, as all finish work has been marked "do not do." the chimney chase is not to be altered in any way.the work will be completed without modifying the existing height, slope, or footprint of the roof. no additional structural or cosmetic alterations beyond those described · 15 m away
- 622 N Rosemont AveSep 26, 2025Nsfaa-remove existing front porch coverconstruct new front porch coverreroof housepaint house · 24 m away
- 1809 W Davis StOct 28, 202616 x 28 x 3' - up 10-29-2026 - down 11-02-2026 · 74 m away
- 627 N Montclair AveOct 26, 2026Replacing the feeder conductors for the overhead service · 107 m away
- 606 N Montclair AveMar 5, 2026Replace prv · 116 m away
- 500 N Montclair AveJun 30, 2025Replaced all sanitary sewer under pier and beam foundation to two full bathrooms, one kitchen and one laundry room · 135 m away
- 425 N Rosemont AveOct 9, 2020Interior remodel of 23 units for a mfd · 144 m away
- 1655 Ranier StJul 8, 2025Dsst -disd rosemont upper previously submitted as a paper project. addition and renovation to existing school · 146 m away
- 414 N Rosemont AveMay 15, 2025Gas leak and repair · 151 m away
- 414 N Montclair AveNov 18, 2026Replace tankless water heater · 176 m away