1655 Ranier St
Dallas, TX 75208
Commercial Addition and Renovation at 1655 Ranier St
A commercial addition and renovation is listed for 1655 Ranier St in Dallas. The City of Dallas issued a commercial mechanical permit on May 12, 2025, under permit COM-MEC-25-000014.
Summarized from City of Dallas records · updated Jul 8, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Jul 8, 2025
- since May 12, 2025
- Largest scope
- —
- Listed value
- $26M
- partial · often understated
Permit & project history
2 projectsDsst -disd rosemont upper previously submitted as a paper project. addition and renovation to existing school
Dsst -disd rosemont upper previously submitted as a paper project. addition and renovation to existing school
City of Dallas permitCommercial Alteration Addition Permit$26M
Sources: City of Dallas
Questions about 1655 Ranier St
What is being built at 1655 Ranier St in Dallas?
A City of Dallas permit describes an addition and renovation at the commercial property. It is listed as a commercial mechanical permit.
When was the permit filed for 1655 Ranier St?
The permit was filed on May 12, 2025.
What is the permit number for 1655 Ranier St?
The permit number is COM-MEC-25-000014.
Is the work at 1655 Ranier St a commercial project?
Yes. The City of Dallas record lists it as a commercial mechanical permit for an addition and renovation.
What does the permit say about the work at 1655 Ranier St?
The permit description is “Addition & renovation.” It does not provide further details about the scope.
Also being built nearby
All of 75208- 622 N Rosemont AveSep 26, 2025Nsfaa-remove existing front porch coverconstruct new front porch coverreroof housepaint house · 129 m away
- 619 N Rosemont AveJun 20, 2025This project involves the full removal and replacement of the existing roofing system, roofing components, and gutter system on the primary residence and detached garage.the new roofing system will use atlas pinnacle pristine architectural shingles with a high profile hip and ridge, in the color black shadow. normal osb decking over battens will be used where necessary. bullet boot roof jacks in black will be installed throughout. the drip edge will be replaced with black-colored flashing, and chimney flashing will be replaced as part of the scope.in addition, full wrap seamless gutters and downspouts, finished in black will be installed.no painting or staining of any kind will be performed as part of this project. this includes no stain or paint application on surfaces, trim, or other materials, as all finish work has been marked "do not do." the chimney chase is not to be altered in any way.the work will be completed without modifying the existing height, slope, or footprint of the roof. no additional structural or cosmetic alterations beyond those described · 131 m away
- 719 N. Montclair Ave · Dallas Independent School DistrictFeb 15, 2024Rosemont es phase 2 — additions to existing building — 6 classroom addition and restrooms to an existing 3-8th grade campus. approximately 8,400 sq ft · 133 m away
- 718 N Montclair AveOct 1, 2020Addition to sfd · 145 m away
- 610 N Rosemont AveJul 17, 2026270' 1x6x8 cedar board on board, 3 wood frame walk gates · 146 m away
- 609 N Rosemont AveJul 7, 2025The proposed work includes the removal and replacement of the existing roofing system with atlas impact class 4 shingles in pewter ir. ridge venting will be installed, and existing attic vents will be removed. drip edge will be upgraded to 3" galvanized gravel stop, and all roof jacks will be replaced with black bullet boots. chimney flashing will be replaced. the gutter system will be upgraded to a 5" gutter and downspout system (color tuxedo grey), with full gutter wrap included. a minimum of 10 decking boards will be repaired or replaced using 1" x 6" tongue and groove boards. a 5" bullet boot and a 1.5" split boot will also be installed as needed. no changes will be made to the building’s architectural style or visual appearance beyond the replacement of existing materials with updated equivalents · 146 m away
- 601 N Rosemont AveJul 14, 2026270' 1x6x8 cedar board on board, 3 wood frame walk gates · 157 m away
- 1809 W Davis StOct 28, 202616 x 28 x 3' - up 10-29-2026 - down 11-02-2026 · 162 m away
- 627 N Montclair AveOct 26, 2026Replacing the feeder conductors for the overhead service · 174 m away
- 1631 Taft StMar 25, 2026Complete system · 188 m away
- 1825 Wood Ledge PlJul 31, 2025Reroof at 1825 wood ledge pl, replacing with asphalt shinges · 191 m away
- 1623 Taft StSep 22, 2020Permanent electrical service · 194 m away