1825 Wood Ledge Pl
Dallas, TX 75208
1825 Wood Ledge Pl: 1 project on record
City of Dallas lists 1 filing across 1 project at 1825 Wood Ledge Pl, Dallas, TX 75208. The most recent, filed July 31, 2025, covers: “Reroof at 1825 wood ledge pl, replacing with asphalt shinges”.
Compiled from City of Dallas records · updated Jul 31, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 31, 2025
- since Jul 31, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 1825 Wood Ledge Pl
What is being built at 1825 Wood Ledge Pl?
The latest filing (City of Dallas permit RES-ROOF-25-000600, July 31, 2025) covers reroof at 1825 wood ledge pl, replacing with asphalt shinges.
How many permits and filings does 1825 Wood Ledge Pl have?
1 filing across 1 project, from July 31, 2025 to July 31, 2025.
What is being built near Dallas Independent School District in Dallas?
1825 Wood Ledge Pl is about 312 m from Dallas Independent School District (719 N. Montclair Ave). Its latest filing is for reroof at 1825 wood ledge pl, replacing with asphalt shinges.
Is there other construction near 1825 Wood Ledge Pl?
Yes. Nearby filings include 1655 Ranier St (dsst -disd rosemont upper previously submitted as a paper project. addition and renovation to existing school, Jul 8, 2025); 1809 W Davis St (16 x 28 x 3' - up 10-29-2026 - down 11-02-2026, Oct 28, 2026); 630 Stevens Village Dr (repair lugs on meter base, May 27, 2026).
How do I get alerts for new permits at 1825 Wood Ledge Pl?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 1655 Ranier StJul 8, 2025Dsst -disd rosemont upper previously submitted as a paper project. addition and renovation to existing school · 191 m away
- 1809 W Davis StOct 28, 202616 x 28 x 3' - up 10-29-2026 - down 11-02-2026 · 252 m away
- 630 Stevens Village DrMay 27, 2026Repair lugs on meter base · 275 m away
- 619 N Rosemont AveJun 20, 2025This project involves the full removal and replacement of the existing roofing system, roofing components, and gutter system on the primary residence and detached garage.the new roofing system will use atlas pinnacle pristine architectural shingles with a high profile hip and ridge, in the color black shadow. normal osb decking over battens will be used where necessary. bullet boot roof jacks in black will be installed throughout. the drip edge will be replaced with black-colored flashing, and chimney flashing will be replaced as part of the scope.in addition, full wrap seamless gutters and downspouts, finished in black will be installed.no painting or staining of any kind will be performed as part of this project. this includes no stain or paint application on surfaces, trim, or other materials, as all finish work has been marked "do not do." the chimney chase is not to be altered in any way.the work will be completed without modifying the existing height, slope, or footprint of the roof. no additional structural or cosmetic alterations beyond those described · 279 m away
- 622 N Rosemont AveSep 26, 2025Nsfaa-remove existing front porch coverconstruct new front porch coverreroof housepaint house · 285 m away
- 1631 Taft StMar 25, 2026Complete system · 287 m away
- 609 N Rosemont AveJul 7, 2025The proposed work includes the removal and replacement of the existing roofing system with atlas impact class 4 shingles in pewter ir. ridge venting will be installed, and existing attic vents will be removed. drip edge will be upgraded to 3" galvanized gravel stop, and all roof jacks will be replaced with black bullet boots. chimney flashing will be replaced. the gutter system will be upgraded to a 5" gutter and downspout system (color tuxedo grey), with full gutter wrap included. a minimum of 10 decking boards will be repaired or replaced using 1" x 6" tongue and groove boards. a 5" bullet boot and a 1.5" split boot will also be installed as needed. no changes will be made to the building’s architectural style or visual appearance beyond the replacement of existing materials with updated equivalents · 289 m away
- 610 N Rosemont AveJul 17, 2026270' 1x6x8 cedar board on board, 3 wood frame walk gates · 297 m away
- 601 N Rosemont AveJul 14, 2026270' 1x6x8 cedar board on board, 3 wood frame walk gates · 298 m away
- 1623 Taft StSep 22, 2020Permanent electrical service · 299 m away
- 677 Aspen Valley LnJun 5, 2026Mcr with battery installation of a 8.7kw roof mount pvsolar system with 1 tesla powerwall-3 inverter / gateway.utility shutdown needed to install the teg · 299 m away
- 719 N. Montclair Ave · Dallas Independent School DistrictFeb 15, 2024Rosemont es phase 2 — additions to existing building — 6 classroom addition and restrooms to an existing 3-8th grade campus. approximately 8,400 sq ft · 312 m away