610 N Rosemont Ave
Dallas, TX 75208
Cedar board-on-board fencing permitted at 610 N Rosemont
City of Dallas permits describe 270 feet of cedar board-on-board fencing at 610 N Rosemont Ave. The first permit was filed July 6, 2026; a second, filed July 17, also lists three wood-frame walk gates.
Summarized from City of Dallas records · updated Jul 17, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jul 17, 2026
- since Jul 6, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 610 N Rosemont Ave
What is being built at 610 N Rosemont Ave?
City of Dallas permits describe 270 feet of cedar board-on-board fencing. The July 17, 2026, permit also lists three wood-frame walk gates.
When were the fence permits filed for 610 N Rosemont Ave?
The two City of Dallas permits were filed July 6 and July 17, 2026.
How much fencing is planned at 610 N Rosemont Ave?
The permit descriptions list 270 feet of cedar board-on-board fencing.
Are gates included in the 610 N Rosemont Ave project?
The July 17, 2026, permit lists three wood-frame walk gates. The July 6 permit description lists cedar board-on-board fencing.
What are the permit numbers for work at 610 N Rosemont Ave?
The permits are RES-ACC-26-000845, filed July 6, 2026, and RES-ACC-26-000906, filed July 17, 2026.
Also being built nearby
All of 75208- 609 N Rosemont AveJul 7, 2025The proposed work includes the removal and replacement of the existing roofing system with atlas impact class 4 shingles in pewter ir. ridge venting will be installed, and existing attic vents will be removed. drip edge will be upgraded to 3" galvanized gravel stop, and all roof jacks will be replaced with black bullet boots. chimney flashing will be replaced. the gutter system will be upgraded to a 5" gutter and downspout system (color tuxedo grey), with full gutter wrap included. a minimum of 10 decking boards will be repaired or replaced using 1" x 6" tongue and groove boards. a 5" bullet boot and a 1.5" split boot will also be installed as needed. no changes will be made to the building’s architectural style or visual appearance beyond the replacement of existing materials with updated equivalents · 13 m away
- 619 N Rosemont AveJun 20, 2025This project involves the full removal and replacement of the existing roofing system, roofing components, and gutter system on the primary residence and detached garage.the new roofing system will use atlas pinnacle pristine architectural shingles with a high profile hip and ridge, in the color black shadow. normal osb decking over battens will be used where necessary. bullet boot roof jacks in black will be installed throughout. the drip edge will be replaced with black-colored flashing, and chimney flashing will be replaced as part of the scope.in addition, full wrap seamless gutters and downspouts, finished in black will be installed.no painting or staining of any kind will be performed as part of this project. this includes no stain or paint application on surfaces, trim, or other materials, as all finish work has been marked "do not do." the chimney chase is not to be altered in any way.the work will be completed without modifying the existing height, slope, or footprint of the roof. no additional structural or cosmetic alterations beyond those described · 17 m away
- 622 N Rosemont AveSep 26, 2025Nsfaa-remove existing front porch coverconstruct new front porch coverreroof housepaint house · 17 m away
- 601 N Rosemont AveJul 14, 2026270' 1x6x8 cedar board on board, 3 wood frame walk gates · 19 m away
- 1809 W Davis StOct 28, 202616 x 28 x 3' - up 10-29-2026 - down 11-02-2026 · 87 m away
- 627 N Montclair AveOct 26, 2026Replacing the feeder conductors for the overhead service · 94 m away
- 606 N Montclair AveMar 5, 2026Replace prv · 104 m away
- 500 N Montclair AveJun 30, 2025Replaced all sanitary sewer under pier and beam foundation to two full bathrooms, one kitchen and one laundry room · 125 m away
- 1655 Ranier StJul 8, 2025Dsst -disd rosemont upper previously submitted as a paper project. addition and renovation to existing school · 146 m away
- 425 N Rosemont AveOct 9, 2020Interior remodel of 23 units for a mfd · 149 m away
- 414 N Rosemont AveMay 15, 2025Gas leak and repair · 154 m away
- 414 N Montclair AveNov 18, 2026Replace tankless water heater · 168 m away