234 W 8th St
Dallas, TX 75208
Gas service work permitted at 234 W 8th St
A residential plumbing permit at 234 W 8th St covers new gas service and replacement of 10 feet of line in the front yard. The City of Dallas filed the permit on April 14, 2026, under permit RES-PLM-26-003926.
Summarized from City of Dallas records · updated Apr 14, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Apr 14, 2026
- since Apr 14, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 234 W 8th St
What is being built at 234 W 8th St?
The City of Dallas permit describes new gas service and replacement of 10 feet of line in the front yard. It does not describe a new building.
What work is planned at 234 W 8th St in Dallas?
A residential plumbing permit covers new gas service and replacement of 10 feet of line in the front yard. The permit was filed April 14, 2026.
When was the gas service permit filed for 234 W 8th St?
The City of Dallas filed permit RES-PLM-26-003926 on April 14, 2026.
Is a new home being built at 234 W 8th St?
The available City of Dallas record is for gas service work, not new home construction.
What is happening near Shaym 01 on W 8th Street?
At 234 W 8th St, about 35 meters from Shaym 01, a permit covers new gas service and replacement of 10 feet of line in the front yard. It was filed April 14, 2026.
Also being built nearby
All of 75208- 240 W 8th StOct 5, 2026240 w 8th - conservation approved - addition of an accessory structure to be used for a cooler, freezer and ice machine · 10 m away
- 223 W 8th StOct 31, 2025Gas test · 24 m away
- 217 W 8th StNov 4, 2025Installation of air conditioning and ventilation system · 32 m away
- 215 W 8th Street · Shaym 01 LLCJan 14, 2026Cafe drift — renovation/alteration — interior finish out of an existing space into a small cafe · 35 m away
- 215 W 8th StJan 8, 2026Bu,el,zo,me he interior finish out · 35 m away
- 217 Melba StJun 25, 20262nd floor building · 59 m away
- 205 Melba StDec 30, 2025Gas test · 81 m away
- 400 N Zang BlvdMay 27, 2025Remove ballast and overlay tpo 60mil · 82 m away
- 400 S Zang BlvdApr 17, 2026• efi will de-energize and make safe circuitry for unit ss1• efi will replace whip from disconnect to new unit ss1• efi will provide and install new 30a disconnect• efi will provide and install new 2p 30a breaker• efi will utilize existing conductors to refeed unit ss1• efi will verify voltage to new unit ss1• efi will de-energize old 30a disconnect for cu-1 and ahu-1• efi will provide and install new 30a disconnect for cu-1• efi will provide and install new 30a disconnect for ahu-1• efi will verify voltage to new ahu-1 and cu-1• efi will de-energize and make safe circuitry for ac-3 and cu-3• efi will provide and install new 30a disconnect for ac-3• efi will provide and install new 30a disconnect for cu-3• efi will verify voltage to new ac-3 and cu-3• efi will utilize existing conductors for all work performed• efi will provide new circuit breakers as needed for the above-mentioned units• labeling and identification of equipment• shutdowns and coordination of shutdowns as specified• lot labor and supervision · 82 m away
- 239 Melba StJan 21, 2026Commercial plumbing · 82 m away
- 234 Melba StDec 10, 2025Gas test with a gas repair done at the stove · 93 m away
- 230 Melba StSep 25, 2026Furnish and install new hvac systems for (4) new townhomes · 93 m away