240 W 8th St
Dallas, TX 75208
Permits show a home being converted into a dine-in restaurant
Dallas permits indicate that a single-family home at 240 W 8th St is being remodeled into a dine-in restaurant for a future tenant. The commercial remodel permit was filed December 23, 2025, followed by permits for restaurant plumbing and gas, a kitchen vent hood, a grease trap, and an accessory cooler, freezer and ice machine structure.
Summarized from City of Dallas records · updated Oct 5, 2026
- Projects
- 12
- 12 filings
- Latest filing
- Oct 5, 2026
- since Jul 25, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
12 projects240 w 8th - conservation approved - addition of an accessory structure to be used for a cooler, freezer and ice machine
240 w 8th - conservation approved - addition of an accessory structure to be used for a cooler, freezer and ice machine
City of Dallas permitCommercial Alteration Addition PermitConservation approved: commercial remodel of a single-family home to convert into a dine in restaurant for a future tenant. no foundation work to be done. demolition of garage/shed applied for res-dem-25-000407. existing land use category is residential and should be for single-family not multi-family but no option for it
Conservation approved: commercial remodel of a single-family home to convert into a dine in restaurant for a future tenant. no foundation work to be done. demolition of garage/shed applied for res-dem-25-000407. existing land use category is residential and should be for single-family not multi-family but no option for it
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 240 W 8th St
What is being built at 240 W 8th St in Dallas?
Permits indicate that an existing single-family home is being remodeled into a dine-in restaurant for a future tenant. The remodel permit was filed December 23, 2025.
Is a new restaurant opening at 240 W 8th St?
City permits show work to convert the home into a dine-in restaurant, but do not identify the future tenant or an opening date.
When was the restaurant remodel at 240 W 8th St permitted?
The commercial remodel permit was filed December 23, 2025. Plumbing and gas work for a new restaurant and bar was permitted January 6, 2026.
What work is planned for the restaurant at 240 W 8th St?
Permits include plumbing and gas for a restaurant and bar, a kitchen vent hood, a grease trap, and an accessory structure for a cooler, freezer and ice machine.
Is the project a new building or a renovation?
The December 23, 2025 permit describes a commercial remodel of an existing single-family home, with no foundation work. Permits also cover demolition of a rear garage or shed.
Who is the tenant at 240 W 8th St?
The remodel permit describes a restaurant for a future tenant, but the permit records do not name that tenant.
Also being built nearby
All of 75208- 234 W 8th StApr 14, 2026New gas service/ replacing 10 foot of line in the front yard · 10 m away
- 223 W 8th StOct 31, 2025Gas test · 32 m away
- 217 W 8th StNov 4, 2025Installation of air conditioning and ventilation system · 42 m away
- 215 W 8th Street · Shaym 01 LLCJan 14, 2026Cafe drift — renovation/alteration — interior finish out of an existing space into a small cafe · 45 m away
- 215 W 8th StJan 8, 2026Bu,el,zo,me he interior finish out · 45 m away
- 217 Melba StJun 25, 20262nd floor building · 58 m away
- 205 Melba StDec 30, 2025Gas test · 83 m away
- 239 Melba StJan 21, 2026Commercial plumbing · 85 m away
- 400 S Zang BlvdApr 17, 2026• efi will de-energize and make safe circuitry for unit ss1• efi will replace whip from disconnect to new unit ss1• efi will provide and install new 30a disconnect• efi will provide and install new 2p 30a breaker• efi will utilize existing conductors to refeed unit ss1• efi will verify voltage to new unit ss1• efi will de-energize old 30a disconnect for cu-1 and ahu-1• efi will provide and install new 30a disconnect for cu-1• efi will provide and install new 30a disconnect for ahu-1• efi will verify voltage to new ahu-1 and cu-1• efi will de-energize and make safe circuitry for ac-3 and cu-3• efi will provide and install new 30a disconnect for ac-3• efi will provide and install new 30a disconnect for cu-3• efi will verify voltage to new ac-3 and cu-3• efi will utilize existing conductors for all work performed• efi will provide new circuit breakers as needed for the above-mentioned units• labeling and identification of equipment• shutdowns and coordination of shutdowns as specified• lot labor and supervision · 92 m away
- 400 N Zang BlvdMay 27, 2025Remove ballast and overlay tpo 60mil · 92 m away
- 234 Melba StDec 10, 2025Gas test with a gas repair done at the stove · 94 m away
- 230 Melba StSep 25, 2026Furnish and install new hvac systems for (4) new townhomes · 95 m away
More apartments & multifamily in 75208, demolitions in 75208, new homes in 75208.