400 S Zang Blvd

Dallas, TX 75208

HVAC equipment and electrical upgrades at 400 S Zang Blvd

Permits indicate replacement of HVAC equipment and related electrical components at 400 S Zang Blvd, rather than a new building. The first listed permit was filed December 17, 2025, with additional mechanical and electrical permits filed April 2 and April 17, 2026.

Summarized from City of Dallas records · updated Apr 17, 2026

Projects
4
4 filings
Latest filing
Apr 17, 2026
since Oct 13, 2020
Largest scope
—
Listed value
$45
partial · often understated

Permit & project history

4 projects
  1. • efi will de-energize and make safe circuitry for unit ss1• efi will replace whip from disconnect to new unit ss1• efi will provide and install new 30a disconnect• efi will provide and install new 2p 30a breaker• efi will utilize existing conductors to refeed unit ss1• efi will verify voltage to new unit ss1• efi will de-energize old 30a disconnect for cu-1 and ahu-1• efi will provide and install new 30a disconnect for cu-1• efi will provide and install new 30a disconnect for ahu-1• efi will verify voltage to new ahu-1 and cu-1• efi will de-energize and make safe circuitry for ac-3 and cu-3• efi will provide and install new 30a disconnect for ac-3• efi will provide and install new 30a disconnect for cu-3• efi will verify voltage to new ac-3 and cu-3• efi will utilize existing conductors for all work performed• efi will provide new circuit breakers as needed for the above-mentioned units• labeling and identification of equipment• shutdowns and coordination of shutdowns as specified• lot labor and supervision

    • efi will de-energize and make safe circuitry for unit ss1• efi will replace whip from disconnect to new unit ss1• efi will provide and install new 30a disconnect• efi will provide and install new 2p 30a breaker• efi will utilize existing conductors to refeed unit ss1• efi will verify voltage to new unit ss1• efi will de-energize old 30a disconnect for cu-1 and ahu-1• efi will provide and install new 30a disconnect for cu-1• efi will provide and install new 30a disconnect for ahu-1• efi will verify voltage to new ahu-1 and cu-1• efi will de-energize and make safe circuitry for ac-3 and cu-3• efi will provide and install new 30a disconnect for ac-3• efi will provide and install new 30a disconnect for cu-3• efi will verify voltage to new ac-3 and cu-3• efi will utilize existing conductors for all work performed• efi will provide new circuit breakers as needed for the above-mentioned units• labeling and identification of equipment• shutdowns and coordination of shutdowns as specified• lot labor and supervision

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-26-001539
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. ? disconnect the power, controls, and condensate from the (2) split system and (1) mini split to be demoed.? recover refrigerant of the current unit per epa guidelines.? remove and dispose of the current condenser units.? install new carrier outdoor condenser units (provided by others).? remove ceiling tiles and grid to replace ahu 1 and ahu 3; save ceiling tiles and grid to be reinstalled.? remove and dispose of current (1) ahu-1 goodman, (1) ahu-3 trane, and (1) mitsubishi wall mount mini split.? install (2) new carrier ahu and (1) wall mount mini split. (provided by others)? provide and install drain pans for (2) new carrier ahu’s? flush the existing refrigerant lines to accept the new refrigerant.? pressure test the refrigerant piping.? re-connect to existing condensate line.? deenergize and make safe circuit for new units.? provide and install new 2 pole 30-amp breakers. (provided by 3dmsc)? provide and install condenser slab for 3 outdoor units.? remove and replace whip from disconnect to new units. (provided by 3dmsc)? remove and replace current outdoor disconnects with 30 amp 240- volt 2-pole non fusible outdoor general duty safety switch. (to be provided by 3dmsc)? verify proper voltage to new units.? perform professional start-up of new equipment.? provide a technician for city inspection and punch list.? all work to be performed after bank operating hours.? obtain sign off on work performed

    ? disconnect the power, controls, and condensate from the (2) split system and (1) mini split to be demoed.? recover refrigerant of the current unit per epa guidelines.? remove and dispose of the current condenser units.? install new carrier outdoor condenser units (provided by others).? remove ceiling tiles and grid to replace ahu 1 and ahu 3; save ceiling tiles and grid to be reinstalled.? remove and dispose of current (1) ahu-1 goodman, (1) ahu-3 trane, and (1) mitsubishi wall mount mini split.? install (2) new carrier ahu and (1) wall mount mini split. (provided by others)? provide and install drain pans for (2) new carrier ahu’s? flush the existing refrigerant lines to accept the new refrigerant.? pressure test the refrigerant piping.? re-connect to existing condensate line.? deenergize and make safe circuit for new units.? provide and install new 2 pole 30-amp breakers. (provided by 3dmsc)? provide and install condenser slab for 3 outdoor units.? remove and replace whip from disconnect to new units. (provided by 3dmsc)? remove and replace current outdoor disconnects with 30 amp 240- volt 2-pole non fusible outdoor general duty safety switch. (to be provided by 3dmsc)? verify proper voltage to new units.? perform professional start-up of new equipment.? provide a technician for city inspection and punch list.? all work to be performed after bank operating hours.? obtain sign off on work performed

    City of Dallas permitCommercial Mechanical Permit
    Record
    COM-MEC-25-001402
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. :• efi will de-energize and make safe circuitry for unit ss1• efi will replace whip from disconnect to new unit ss1• efi will provide and install new 30a disconnect• efi will provide and install new 2p 30a breaker• efi will utilize existing conductors to refeed unit ss1• efi will verify voltage to new unit ss1• efi will de-energize old 30a disconnect for cu-1 and ahu-1• efi will provide and install new 30a disconnect for cu-1• efi will provide and install new 30a disconnect for ahu-1• efi will verify voltage to new ahu-1 and cu-1• efi will de-energize and make safe circuitry for ac-3 and cu-3• efi will provide and install new 30a disconnect for ac-3• efi will provide and install new 30a disconnect for cu-3• efi will verify voltage to new ac-3 and cu-3• efi will utilize existing conductors for all work performed• efi will provide new circuit breakers as needed for the above-mentioned units

    :• efi will de-energize and make safe circuitry for unit ss1• efi will replace whip from disconnect to new unit ss1• efi will provide and install new 30a disconnect• efi will provide and install new 2p 30a breaker• efi will utilize existing conductors to refeed unit ss1• efi will verify voltage to new unit ss1• efi will de-energize old 30a disconnect for cu-1 and ahu-1• efi will provide and install new 30a disconnect for cu-1• efi will provide and install new 30a disconnect for ahu-1• efi will verify voltage to new ahu-1 and cu-1• efi will de-energize and make safe circuitry for ac-3 and cu-3• efi will provide and install new 30a disconnect for ac-3• efi will provide and install new 30a disconnect for cu-3• efi will verify voltage to new ac-3 and cu-3• efi will utilize existing conductors for all work performed• efi will provide new circuit breakers as needed for the above-mentioned units

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-25-003712
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Renovation

    Renovation

    City of Dallas permitBuilding (BU) Commercial Renovation$45
    Record
    2010091106
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 400 S Zang Blvd

What is being built at 400 S Zang Blvd?

The permits describe HVAC equipment replacement and related electrical work at the existing commercial property. They do not describe a new building.

What work is planned at 400 S Zang Blvd in Dallas?

The work includes replacing two air-handling units, outdoor condenser units and a wall-mounted mini-split, plus new electrical disconnects and breakers. The mechanical permit is COM-MEC-25-001402, filed April 2, 2026.

When were permits filed for 400 S Zang Blvd?

The records show permits filed December 17, 2025, April 2, 2026, and April 17, 2026. The latest is electrical permit COM-ELC-26-001539.

Is a new building going up at 400 S Zang Blvd?

The listed permits describe mechanical and electrical upgrades, not new construction. They cover HVAC equipment and associated electrical components.

What's being worked on near Cafe Drift at 215 W. 8th Street?

At 400 S Zang Blvd, about 48 meters from Cafe Drift, permits indicate HVAC replacements and related electrical work. The records do not identify the project as part of the cafe.

Also being built nearby

All of 75208
Get alerts for 400 S Zang Blvd