A commercial roofing permit filed May 27, 2025, at 400 N Zang Blvd covers removing roof ballast and installing a 60-mil TPO overlay. The permit record does not list a project valuation or square footage.
Summarized from City of Dallas records · updated May 27, 2025
- Projects
- 1
- 1 filings
- Latest filing
- May 27, 2025
- since May 27, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 400 N Zang Blvd
What is being built at 400 N Zang Blvd?
The permit indicates commercial roof work: removing ballast and overlaying the roof with 60-mil TPO. It does not describe a new building.
What work is planned at 400 N Zang Blvd?
The City of Dallas permit describes removing ballast and installing a 60-mil TPO overlay.
When was the roofing permit filed for 400 N Zang Blvd?
The permit was filed May 27, 2025.
What is the permit number for roof work at 400 N Zang Blvd?
The permit number is COM-ROOF-25-000017. It is listed as a Commercial Roofing Permit filed May 27, 2025.
Is roof work planned near Cafe Drift in Dallas?
A commercial roofing permit was filed at 400 N Zang Blvd, about 48 meters from Cafe Drift at 215 W. 8th Street. The permit covers removing ballast and installing a 60-mil TPO overlay.
Also being built nearby
All of 75208- 400 S Zang BlvdApr 17, 2026• efi will de-energize and make safe circuitry for unit ss1• efi will replace whip from disconnect to new unit ss1• efi will provide and install new 30a disconnect• efi will provide and install new 2p 30a breaker• efi will utilize existing conductors to refeed unit ss1• efi will verify voltage to new unit ss1• efi will de-energize old 30a disconnect for cu-1 and ahu-1• efi will provide and install new 30a disconnect for cu-1• efi will provide and install new 30a disconnect for ahu-1• efi will verify voltage to new ahu-1 and cu-1• efi will de-energize and make safe circuitry for ac-3 and cu-3• efi will provide and install new 30a disconnect for ac-3• efi will provide and install new 30a disconnect for cu-3• efi will verify voltage to new ac-3 and cu-3• efi will utilize existing conductors for all work performed• efi will provide new circuit breakers as needed for the above-mentioned units• labeling and identification of equipment• shutdowns and coordination of shutdowns as specified• lot labor and supervision
- 215 W 8th Street · Shaym 01 LLCJan 14, 2026Cafe drift — renovation/alteration — interior finish out of an existing space into a small cafe · 48 m away
- 215 W 8th StJan 8, 2026Bu,el,zo,me he interior finish out · 48 m away
- 456 N Zang BlvdNov 12, 2020Erect detached sign changeable copy · 50 m away
- 217 W 8th StNov 4, 2025Installation of air conditioning and ventilation system · 51 m away
- 223 W 8th StOct 31, 2025Gas test · 61 m away
- 234 W 8th StApr 14, 2026New gas service/ replacing 10 foot of line in the front yard · 82 m away
- 240 W 8th StOct 5, 2026240 w 8th - conservation approved - addition of an accessory structure to be used for a cooler, freezer and ice machine · 92 m away
- 206 Melba StNov 16, 2026Demolish and haul away house and foundation, adjacent shed structure, concrete stairs and associated flat work at adjacent empty lot · 111 m away
- 125 W 8th StJul 28, 2026Re-roof · 112 m away
- 239 Melba StJan 21, 2026Commercial plumbing · 113 m away
- 212 Melba StJan 20, 2021Tree removal requires separate permit · 114 m away