418 W Suffolk Ave
Dallas, TX 75208
Gas line and water heater permits at 418 W Suffolk Ave
City of Dallas records show residential plumbing work at 418 W Suffolk Ave, not a new building project. A water heater replacement was permitted July 9, 2025, followed by a gas line permit on April 9, 2026.
Summarized from City of Dallas records · updated Apr 9, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Apr 9, 2026
- since Jul 9, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 418 W Suffolk Ave
What is being built at 418 W Suffolk Ave?
The available permits show plumbing work at a residence, not new construction: a 50-gallon gas water heater replacement and gas line work.
What work was permitted at 418 W Suffolk Ave in 2026?
On April 9, 2026, the City of Dallas issued residential plumbing permit RES-PLM-26-003762 for a gas line from the meter to the house, with connections to the heater and stove.
Was a water heater replacement permitted at 418 W Suffolk Ave?
Yes. City of Dallas permit RES-PLM-25-002282, dated July 9, 2025, describes replacing a 50-gallon gas water heater.
Is a new home being built at 418 W Suffolk Ave?
The records provided do not show a new home project. They show two residential plumbing permits, for a water heater replacement and gas line work.
When were permits filed for 418 W Suffolk Ave?
The two listed City of Dallas permits are dated July 9, 2025, and April 9, 2026.
Also being built nearby
All of 75208- 454 W Suffolk AveSep 4, 2026Water heater traditional changeout · 55 m away
- 443 W Clarendon DrOct 27, 2025Need gas test for gas service release permit per atmos energy · 88 m away
- 447 W Clarendon DrMay 13, 2025Install 200 amp service. rewire of entire house · 89 m away
- 418 W Clarendon DrSep 10, 2020Remove existing roof and install new roof · 110 m away
- 452 W Yarmouth StSep 10, 2025Installation of pv solar system · 121 m away
- 449 W Yarmouth StJul 14, 2026Electric service repair/upgrade · 130 m away
- 522 Griffith AveOct 15, 2026Gas test for service · 173 m away
- 331 W Clarendon DrMar 5, 2026Reroof · 204 m away
- 520 Brooks AveFeb 13, 2026We're looking to reconnect natural gas service and we are putting the pipe system under pressure to pass inspection · 218 m away
- 435 Delaware AveDec 18, 2020Demolition sfd · 227 m away
- 427 Delaware AveJul 31, 2025Remove existing roof and replace with owens corning oakridge (estate gray) · 227 m away
- 419 Delaware AveDec 2, 2020Gas test · 228 m away