3880 W Northwest Hwy
Dallas, TX 75209
3880 W Northwest Hwy: 2 projects on record
City of Dallas lists 2 filings across 2 projects at 3880 W Northwest Hwy, Dallas, TX 75209. The most recent, filed November 23, 2020, covers: “commercial construction”.
Compiled from City of Dallas records · updated Nov 23, 2020
- Projects
- 2
- 2 filings
- Latest filing
- Nov 23, 2020
- since Nov 23, 2020
- Largest scope
- —
- Listed value
- $125
- partial · often understated
Permit & project history
2 projectsSources: City of Dallas
Questions about 3880 W Northwest Hwy
What is being built at 3880 W Northwest Hwy?
The latest filing (City of Dallas permit 2011201034, November 23, 2020) covers commercial construction.
How many permits and filings does 3880 W Northwest Hwy have?
2 filings across 2 projects, from November 23, 2020 to November 23, 2020.
How much is the construction at 3880 W Northwest Hwy worth?
Permits at this address list about $125 in valuations. Permit valuations are often partial and understate total project cost.
What is being built near Pref Bluffview Towers, in Dallas?
3880 W Northwest Hwy is about 25 m from Pref Bluffview Towers, (3890 W Northwest Hwy). Its latest filing is for commercial construction.
Is there other construction near 3880 W Northwest Hwy?
Yes. Nearby filings include 3890 W Northwest Hwy (emergency repair to entire building 2 pulled and replaced damaged wire from switchgear room in basement of building to oncor transformer outside of building. the entire building is on a temporary transformer, Oct 12, 2026); 3860 W Northwest Hwy (4th floor speculative suites — renovation/alteration — tenant improvements, Jan 27, 2025); 3860 W. Northwest Highway (root canal dentists — renovation/alteration — tenant improvement, Sep 16, 2024).
How do I get alerts for new permits at 3880 W Northwest Hwy?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75209- 3890 W Northwest Hwy · Pref Bluffview Towers, LPOct 12, 2026Emergency repair to entire building 2 pulled and replaced damaged wire from switchgear room in basement of building to oncor transformer outside of building. the entire building is on a temporary transformer · 25 m away
- 3860 W Northwest Hwy · Bluffview Tower WestJan 27, 20254th floor speculative suites — renovation/alteration — tenant improvements · 50 m away
- 3860 W. Northwest Highway · Pref Bluffview Towers LPSep 16, 2024Root canal dentists — renovation/alteration — tenant improvement · 50 m away
- 3850 W Northwest Hwy · Elan At BluffviewNov 5, 2026# 1202 changeout existing system & install 1.5 ton split system · 76 m away
- 3857 Lenel DrSep 19, 2026Install 8' fence · 94 m away
- 3842 W Northwest HwyFeb 18, 2025Install in-ground swimming pool · 96 m away
- 3842 W Northwest Highway · City Of DallasJul 29, 2025Bachman lake trail improvement — renovation/alteration — demolish approximately 600 linear feet of existing 8-foot-wide asphalt trail and reconstruct it with a new 10-foot-wide, 5-inch-thick reinforced concrete trail in accordance with current city of dallas and ada standards · 96 m away
- 3833 Lenel DrNov 10, 2025Gas test · 125 m away
- 3830 W Northwest HwyNov 17, 2020Service release no work · 126 m away
- 9305 Lenel PlAug 27, 2025Install backup generator · 130 m away
- 3820 W Northwest Hwy · Chick-Fil-A, Inc.Jul 24, 2026Taking out single order window and installing a double sliding door in its place as well as a air curtain and mini split to serve the drive thru area for this added door · 151 m away
- 3811 Lenel DrNov 16, 2026Contractor shall furnish all necessary labor, materials, tools, and equipment to replace approximately 65 linear feet of existing gas piping throughout the property.the work shall include the following:1. remove and replace approximately 65 feet of existing gas piping using a combination of new black iron steel piping and approved csst (corrugated stainless steel tubing), as required for the installation.2. install new black iron steel gas piping in designated areas underneath the home and along the exterior wall of the residence.3. install new approved csst piping in designated areas, including all required fittings, supports, and connections in accordance with applicable local gas codes and manufacturer specifications.4. remove sections of sheetrock as necessary to gain access to existing gas piping and complete the installation.5. furnish and install three (3) new gas shut-off valves and three (3) new gas flex connectors for the designated gas appliances or connections.6. properly secure, support, and connect all newly installed gas piping.7. perform the required gas pressure test and leak inspection to verify the integrity of the newly installed gas piping system.8. obtain the required plumbing/mechanical permit, as applicable, and coordinate the required inspection with the local authority having jurisdiction.9. restore gas service upon successful completion of the required testing and approval, where applicable · 169 m away