House demolition and new single-family home permitted
Dallas permits show a house demolition at 3857 Lenel Dr on April 28, 2026, followed by a proposed new single-family home permitted on May 5. Plumbing, electrical and HVAC permits were filed later in 2026.
Summarized from City of Dallas records · updated Sep 19, 2026
- Projects
- 6
- 6 filings
- Latest filing
- Sep 19, 2026
- since Apr 28, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
6 projectsSources: City of Dallas
Questions about 3857 Lenel Dr
What is being built at 3857 Lenel Dr?
City of Dallas records describe a proposed new single-family home. A house demolition permit was filed April 28, 2026, and the new-construction permit followed on May 5.
When was the new home at 3857 Lenel Dr permitted?
The residential new-construction permit, RES-NEW-26-000722, was filed May 5, 2026.
Was a house demolished at 3857 Lenel Dr?
A City of Dallas demolition permit describes demolition of a house. Permit RES-DEM-26-000351 was filed April 28, 2026.
What's being built near HEB Dallas Bluffview on West Northwest Highway?
A proposed new single-family home is permitted at 3857 Lenel Dr, about 104 meters from the HEB Dallas Bluffview renovation listed at 3890 W Northwest Hwy. The new-construction permit was filed May 5, 2026.
Is a new restaurant opening near Chick-fil-A on West Northwest Highway?
The permits for 3857 Lenel Dr describe a new single-family home, not a restaurant. The address is about 153 meters from Chick-Fil-A #3288 NW Highway Fsu.
What work permits were filed for the new home on Lenel Drive?
Dallas records include new construction plumbing filed July 7, 2026; electrical work filed June 29; and residential HVAC filed August 21. An 8-foot fence permit was filed September 19.
Also being built nearby
All of 75220- 3833 Lenel DrNov 10, 2025Gas test · 57 m away
- 3860 W Northwest Hwy · Bluffview Tower WestJan 27, 20254th floor speculative suites — renovation/alteration — tenant improvements · 93 m away
- 3860 W. Northwest Highway · Pref Bluffview Towers LPSep 16, 2024Root canal dentists — renovation/alteration — tenant improvement · 93 m away
- 3852 Hawick LnOct 8, 2026New hvac and ventilation install · 94 m away
- 3880 W Northwest HwyNov 23, 2020Building (bu) commercial renovation · 94 m away
- 3850 W Northwest Hwy · Elan At BluffviewNov 5, 2026# 1202 changeout existing system & install 1.5 ton split system · 102 m away
- 3890 W Northwest Hwy · Pref Bluffview Towers, LPOct 12, 2026Emergency repair to entire building 2 pulled and replaced damaged wire from switchgear room in basement of building to oncor transformer outside of building. the entire building is on a temporary transformer · 104 m away
- 3849 Hawick LnDec 8, 2025Install new fence · 106 m away
- 3811 Lenel DrNov 16, 2026Contractor shall furnish all necessary labor, materials, tools, and equipment to replace approximately 65 linear feet of existing gas piping throughout the property.the work shall include the following:1. remove and replace approximately 65 feet of existing gas piping using a combination of new black iron steel piping and approved csst (corrugated stainless steel tubing), as required for the installation.2. install new black iron steel gas piping in designated areas underneath the home and along the exterior wall of the residence.3. install new approved csst piping in designated areas, including all required fittings, supports, and connections in accordance with applicable local gas codes and manufacturer specifications.4. remove sections of sheetrock as necessary to gain access to existing gas piping and complete the installation.5. furnish and install three (3) new gas shut-off valves and three (3) new gas flex connectors for the designated gas appliances or connections.6. properly secure, support, and connect all newly installed gas piping.7. perform the required gas pressure test and leak inspection to verify the integrity of the newly installed gas piping system.8. obtain the required plumbing/mechanical permit, as applicable, and coordinate the required inspection with the local authority having jurisdiction.9. restore gas service upon successful completion of the required testing and approval, where applicable · 109 m away
- 3842 W Northwest Highway · City Of DallasJul 29, 2025Bachman lake trail improvement — renovation/alteration — demolish approximately 600 linear feet of existing 8-foot-wide asphalt trail and reconstruct it with a new 10-foot-wide, 5-inch-thick reinforced concrete trail in accordance with current city of dallas and ada standards · 113 m away
- 3842 W Northwest HwyFeb 18, 2025Install in-ground swimming pool · 113 m away
- 3829 Hawick LnJul 7, 2025Electrical for swimming pool · 115 m away