A 1,913-square-foot tenant improvement for Root Canal Dentists was registered at Bluffview Tower West on September 16, 2024. The Texas Department of Licensing and Regulation lists the work as a renovation/alteration and the project status as closed. The applicant estimated the project cost at $200,000.
Summarized from Texas Department of Licensing and Regulation records · updated Sep 16, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Sep 16, 2024
- since Sep 16, 2024
- Largest scope
- 1,913 sf
- Estimated cost
- $200K
- state registration
Where this project stands
CompletedRoot Canal Dentists
1,913 sq ft · $200K est.
- RegisteredSep 16, 2024
- Plan review
- ConstructionSep '24 – Mar '25
- Inspected
- Closed
Ran as a 5-month build.
4 contacts on this project · 4 phone numbers
Permit & project history
2 projectsTenant improvement — bluffview towers west
TDLR project registrationRenovation/AlterationProject Closed1,913 sq ft$200K est.- Project #
- TABS2025001039
- Tenant / owner
- Root Canal Dentists
- Design firm
- Pro
- Contact
- Pro
Renovation of existing space for new tenant — bluffview towers west
TDLR project registrationRenovation/AlterationProject Closed1,010 sq ft$99K est.- Project #
- TABS2023018349
- Tenant / owner
- Ridgeline Capital Group
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3860 W. Northwest Highway
What is being built at 3860 W. Northwest Highway in Dallas?
A TDLR registration describes a 1,913-square-foot tenant improvement for Root Canal Dentists at Bluffview Tower West. It was filed September 16, 2024, and is listed as closed.
Is a dentist moving into 3860 W. Northwest Highway?
The TDLR project is named Root Canal Dentists and describes tenant improvement work. The record does not say when the business will open.
What is the estimated cost of the Root Canal Dentists project?
The applicant estimated the project cost at $200,000 in the TDLR registration filed September 16, 2024.
What's being renovated next to Elan At Bluffview on W. Northwest Highway?
The registered work is a 1,913-square-foot tenant improvement for Root Canal Dentists at Bluffview Tower West, 25 meters from Elan At Bluffview. The project is listed as closed.
What's being built near Chick-Fil-A at 3820 W. Northwest Highway?
At 3860 W. Northwest Highway, a TDLR registration describes tenant improvement work for Root Canal Dentists. The listed project area is 1,913 square feet.
Is the Bluffview Tower West renovation still underway?
The TDLR record lists the Root Canal Dentists tenant improvement as “Project Closed.” It was registered on September 16, 2024.
Also being built nearby
All of 75220- 3860 W Northwest Hwy · Bluffview Tower WestJan 27, 20254th floor speculative suites — renovation/alteration — tenant improvements
- 3850 W Northwest Hwy · Elan At BluffviewNov 5, 2026# 1202 changeout existing system & install 1.5 ton split system · 25 m away
- 3842 W Northwest Highway · City Of DallasJul 29, 2025Bachman lake trail improvement — renovation/alteration — demolish approximately 600 linear feet of existing 8-foot-wide asphalt trail and reconstruct it with a new 10-foot-wide, 5-inch-thick reinforced concrete trail in accordance with current city of dallas and ada standards · 45 m away
- 3842 W Northwest HwyFeb 18, 2025Install in-ground swimming pool · 45 m away
- 3880 W Northwest HwyNov 23, 2020Building (bu) commercial renovation · 50 m away
- 3890 W Northwest Hwy · Pref Bluffview Towers, LPOct 12, 2026Emergency repair to entire building 2 pulled and replaced damaged wire from switchgear room in basement of building to oncor transformer outside of building. the entire building is on a temporary transformer · 76 m away
- 3830 W Northwest HwyNov 17, 2020Service release no work · 76 m away
- 3857 Lenel DrSep 19, 2026Install 8' fence · 93 m away
- 3833 Lenel DrNov 10, 2025Gas test · 98 m away
- 3820 W Northwest Hwy · Chick-Fil-A, Inc.Jul 24, 2026Taking out single order window and installing a double sliding door in its place as well as a air curtain and mini split to serve the drive thru area for this added door · 101 m away
- 3811 Lenel DrNov 16, 2026Contractor shall furnish all necessary labor, materials, tools, and equipment to replace approximately 65 linear feet of existing gas piping throughout the property.the work shall include the following:1. remove and replace approximately 65 feet of existing gas piping using a combination of new black iron steel piping and approved csst (corrugated stainless steel tubing), as required for the installation.2. install new black iron steel gas piping in designated areas underneath the home and along the exterior wall of the residence.3. install new approved csst piping in designated areas, including all required fittings, supports, and connections in accordance with applicable local gas codes and manufacturer specifications.4. remove sections of sheetrock as necessary to gain access to existing gas piping and complete the installation.5. furnish and install three (3) new gas shut-off valves and three (3) new gas flex connectors for the designated gas appliances or connections.6. properly secure, support, and connect all newly installed gas piping.7. perform the required gas pressure test and leak inspection to verify the integrity of the newly installed gas piping system.8. obtain the required plumbing/mechanical permit, as applicable, and coordinate the required inspection with the local authority having jurisdiction.9. restore gas service upon successful completion of the required testing and approval, where applicable · 132 m away
- 9305 Lenel PlAug 27, 2025Install backup generator · 170 m away