New outdoor tankless water heater at 5322 Southern Ave
A City of Dallas residential plumbing permit covers installation of a new Rinnai outdoor tankless water heater at 5322 Southern Ave. The permit record, RES-PLM-26-005256, is dated May 21, 2026.
Summarized from City of Dallas records · updated May 21, 2026
- Projects
- 1
- 1 filings
- Latest filing
- May 21, 2026
- since May 21, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 5322 Southern Ave
What is being installed at 5322 Southern Ave?
A City of Dallas permit covers installation of a new Rinnai outdoor tankless water heater.
When was the permit for 5322 Southern Ave filed?
The permit record is dated May 21, 2026.
What is the permit number for 5322 Southern Ave?
The permit number is RES-PLM-26-005256.
Is 5322 Southern Ave a residential or commercial project?
The record is a residential plumbing permit for installation of an outdoor tankless water heater.
Does the permit at 5322 Southern Ave cover a new building?
No new building is listed. The permit description is for installing a new outdoor tankless unit.
Also being built nearby
All of 75209- 5314 Southern AveJul 21, 2025Replace existing fence (wood only, galvanized steel posts will be re-used), approx. 383 linear ft and 8ft tall with two walk gates · 25 m away
- 5331 Southern AveJul 19, 2025Removed and replace 1 condenser & 1 coil · 26 m away
- 5305 Southern AveDec 3, 2020Remodel existing plumbing · 54 m away
- 5349 Southern AveMay 13, 2026Replace hvac system with 2 ton goodman 17 seer 2 stage complete gas system; no duct work · 78 m away
- 5313 Livingston AveApr 21, 2026Replace existing hvac equipment · 92 m away
- 5364 Southern AveJan 14, 2026Replace existing 5-ton outdoor condenser and indoor evaporator coil; install new condenser pad, electrical whip, and emergency disconnect · 124 m away
- 5330 Livingston AveAug 7, 20255 ton system replacement · 131 m away
- 5318 W Mockingbird LnOct 9, 2026Nsfaa-add/rem demolition & site preparationexterior wall alterations: select selective demolition of exterior wall portions to open connections for the new utility addition and screened porch.site prep: prep ground area adjacent to existing structure to accept new slab-on-grade foundations.2. screened porch addition (254 sq ft)foundation & structure: cast concrete slab foundation matching house floor elevation; construct frame structure with post/angle supports.enclosure: install framing for screened openings along exterior perimeter; align centerline with living room.interior connections: align layout with breakfast (bkfst) nook and living room doors.3. utility & laundry addition (83 sq ft)foundation & framing: pour concrete foundation slab (83 sq ft footprint); frame exterior walls adjacent to the existing garage and laundry room.plumbing & mechanical: extend water lines and drainage for relocate/new washer & dryer (with d) units and utility sink.door openings: install pocket/sliding or hinged hidden doors connecting to the expanded pantry and laundry room.4. interior alterations & millworkkitchen & breakfast nook:reconfigure layout with continuous counter run, island prep sink, and double sink location.custom millwork blocking and installation for kitchen cabinets, island, and adjacent pantry.living room & dining:maintain flat ceiling height ($8'\\text{-}0''$ typical) and center focus on fireplace centerline.frame pocket/glass doors between dining and patio areas.bathrooms & bedrooms:reconfigure powder room, bath 2, and primary/secondary bath layouts.install blocking in walls for all fixtures, towel bars, mirrors, and closet shelving.5. mep (mechanical, electrical, plumbing) & general noteshvac: modify and extend ductwork/systems as required for the reconfigured floor plan layout.electrical: update switch/receptacle layout to meet energy codes; install new lighting fixtures throughout additions.plumbing: install new plumbing lines/fixtures at laundry, utility addition, kitchen island sink, and bathrooms.finishes: all trim (base, casing, crown molding, hidden doors) to match existing millwork profile and standard. all window glass to comply with current energy code requirements · 137 m away
- 5323 W Mockingbird LnSep 15, 2025Driveway and approach · 138 m away
- 5331 W Mockingbird LnOct 28, 2020Remove existing roof and install new roof · 140 m away
- 5372 Southern AveAug 29, 2025Replacing existing roof with gaf timberline hdz complete roofing system · 147 m away
- 4012 Dillard CtSep 24, 2026Replace 2.0 ton system with a 2.0 ton system · 170 m away