5364 Southern Ave
Dallas, TX 75209
HVAC equipment replacement permitted at 5364 Southern Ave
A City of Dallas residential mechanical permit filed January 14, 2026, covers replacing an existing 5-ton outdoor condenser and indoor evaporator coil at 5364 Southern Ave. The work also includes a new condenser pad, electrical whip and emergency disconnect. A separate permit filed in 2019 covered HVAC replacement or modification.
Summarized from City of Dallas records · updated Jan 14, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jan 14, 2026
- since Jan 14, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsReplace existing 5-ton outdoor condenser and indoor evaporator coil; install new condenser pad, electrical whip, and emergency disconnect
Replace existing 5-ton outdoor condenser and indoor evaporator coil; install new condenser pad, electrical whip, and emergency disconnect
City of Dallas permitResidential Mechanical Permit
Sources: City of Dallas
Questions about 5364 Southern Ave
What is being built at 5364 Southern Ave?
The January 14, 2026, permit describes HVAC equipment replacement, not a new building: an existing 5-ton outdoor condenser and indoor evaporator coil are to be replaced.
What work is planned at 5364 Southern Ave in Dallas?
Permit RES-MEC-26-000200 covers a new condenser pad, electrical whip and emergency disconnect, along with the condenser and evaporator coil replacement.
When was the HVAC permit filed for 5364 Southern Ave?
The City of Dallas filed residential mechanical permit RES-MEC-26-000200 on January 14, 2026.
Is a new home being built at 5364 Southern Ave?
The listed permits describe HVAC work at the residential address. They do not identify a new home construction project.
Were there earlier permits for HVAC work at 5364 Southern Ave?
Yes. A City of Dallas mechanical permit dated October 24, 2019, records replacement or modification of existing HVAC under permit 1910243015.
Also being built nearby
All of 75209- 5372 Southern AveAug 29, 2025Replacing existing roof with gaf timberline hdz complete roofing system · 23 m away
- 5349 Southern AveMay 13, 2026Replace hvac system with 2 ton goodman 17 seer 2 stage complete gas system; no duct work · 49 m away
- 5330 Livingston AveAug 7, 20255 ton system replacement · 99 m away
- 5331 Southern AveJul 19, 2025Removed and replace 1 condenser & 1 coil · 100 m away
- 5346 W Mockingbird LnNov 18, 2025Install new water heater · 120 m away
- 5322 Southern AveMay 21, 2026Install new rinnai outdoor tankless unit · 124 m away
- 5318 W Mockingbird LnOct 9, 2026Nsfaa-add/rem demolition & site preparationexterior wall alterations: select selective demolition of exterior wall portions to open connections for the new utility addition and screened porch.site prep: prep ground area adjacent to existing structure to accept new slab-on-grade foundations.2. screened porch addition (254 sq ft)foundation & structure: cast concrete slab foundation matching house floor elevation; construct frame structure with post/angle supports.enclosure: install framing for screened openings along exterior perimeter; align centerline with living room.interior connections: align layout with breakfast (bkfst) nook and living room doors.3. utility & laundry addition (83 sq ft)foundation & framing: pour concrete foundation slab (83 sq ft footprint); frame exterior walls adjacent to the existing garage and laundry room.plumbing & mechanical: extend water lines and drainage for relocate/new washer & dryer (with d) units and utility sink.door openings: install pocket/sliding or hinged hidden doors connecting to the expanded pantry and laundry room.4. interior alterations & millworkkitchen & breakfast nook:reconfigure layout with continuous counter run, island prep sink, and double sink location.custom millwork blocking and installation for kitchen cabinets, island, and adjacent pantry.living room & dining:maintain flat ceiling height ($8'\\text{-}0''$ typical) and center focus on fireplace centerline.frame pocket/glass doors between dining and patio areas.bathrooms & bedrooms:reconfigure powder room, bath 2, and primary/secondary bath layouts.install blocking in walls for all fixtures, towel bars, mirrors, and closet shelving.5. mep (mechanical, electrical, plumbing) & general noteshvac: modify and extend ductwork/systems as required for the reconfigured floor plan layout.electrical: update switch/receptacle layout to meet energy codes; install new lighting fixtures throughout additions.plumbing: install new plumbing lines/fixtures at laundry, utility addition, kitchen island sink, and bathrooms.finishes: all trim (base, casing, crown molding, hidden doors) to match existing millwork profile and standard. all window glass to comply with current energy code requirements · 126 m away
- 5304 Livingston AveJul 24, 20265 ton complete · 132 m away
- 5314 Southern AveJul 21, 2025Replace existing fence (wood only, galvanized steel posts will be re-used), approx. 383 linear ft and 8ft tall with two walk gates · 147 m away
- 5331 W Mockingbird LnOct 28, 2020Remove existing roof and install new roof · 152 m away
- 5323 W Mockingbird LnSep 15, 2025Driveway and approach · 161 m away
- 5305 Southern AveDec 3, 2020Remodel existing plumbing · 167 m away