5349 Southern Ave
Dallas, TX 75209
HVAC system replacement permitted at 5349 Southern Ave
A City of Dallas permit filed May 13, 2026, covers replacing the HVAC system at 5349 Southern Ave with a 2-ton Goodman system; no duct work is listed. An earlier permit filed December 17, 2020, covered an upgrade to the existing electrical service.
Summarized from City of Dallas records · updated May 13, 2026
- Projects
- 2
- 2 filings
- Latest filing
- May 13, 2026
- since Dec 17, 2020
- Largest scope
- —
- Listed value
- $1
- partial · often understated
Permit & project history
2 projectsSources: City of Dallas
Questions about 5349 Southern Ave
What is happening at 5349 Southern Ave in Dallas?
City of Dallas records show a permit for an HVAC system replacement, filed May 13, 2026. The permit description says no duct work is included.
Is a new building being built at 5349 Southern Ave?
The available records describe an HVAC replacement and an electrical service upgrade, not construction of a new building.
When was the HVAC replacement at 5349 Southern Ave permitted?
The City of Dallas filed residential mechanical permit RES-MEC-26-002287 on May 13, 2026.
What kind of HVAC system is being installed at 5349 Southern Ave?
The permit description lists a 2-ton Goodman 17 SEER, two-stage complete gas system. It says no duct work is included.
Was electrical work permitted at 5349 Southern Ave?
Yes. City of Dallas permit 2012173020, filed December 17, 2020, lists an upgrade to the existing electrical service.
Also being built nearby
All of 75209- 5364 Southern AveJan 14, 2026Replace existing 5-ton outdoor condenser and indoor evaporator coil; install new condenser pad, electrical whip, and emergency disconnect · 49 m away
- 5331 Southern AveJul 19, 2025Removed and replace 1 condenser & 1 coil · 53 m away
- 5372 Southern AveAug 29, 2025Replacing existing roof with gaf timberline hdz complete roofing system · 71 m away
- 5322 Southern AveMay 21, 2026Install new rinnai outdoor tankless unit · 78 m away
- 5314 Southern AveJul 21, 2025Replace existing fence (wood only, galvanized steel posts will be re-used), approx. 383 linear ft and 8ft tall with two walk gates · 100 m away
- 5318 W Mockingbird LnOct 9, 2026Nsfaa-add/rem demolition & site preparationexterior wall alterations: select selective demolition of exterior wall portions to open connections for the new utility addition and screened porch.site prep: prep ground area adjacent to existing structure to accept new slab-on-grade foundations.2. screened porch addition (254 sq ft)foundation & structure: cast concrete slab foundation matching house floor elevation; construct frame structure with post/angle supports.enclosure: install framing for screened openings along exterior perimeter; align centerline with living room.interior connections: align layout with breakfast (bkfst) nook and living room doors.3. utility & laundry addition (83 sq ft)foundation & framing: pour concrete foundation slab (83 sq ft footprint); frame exterior walls adjacent to the existing garage and laundry room.plumbing & mechanical: extend water lines and drainage for relocate/new washer & dryer (with d) units and utility sink.door openings: install pocket/sliding or hinged hidden doors connecting to the expanded pantry and laundry room.4. interior alterations & millworkkitchen & breakfast nook:reconfigure layout with continuous counter run, island prep sink, and double sink location.custom millwork blocking and installation for kitchen cabinets, island, and adjacent pantry.living room & dining:maintain flat ceiling height ($8'\\text{-}0''$ typical) and center focus on fireplace centerline.frame pocket/glass doors between dining and patio areas.bathrooms & bedrooms:reconfigure powder room, bath 2, and primary/secondary bath layouts.install blocking in walls for all fixtures, towel bars, mirrors, and closet shelving.5. mep (mechanical, electrical, plumbing) & general noteshvac: modify and extend ductwork/systems as required for the reconfigured floor plan layout.electrical: update switch/receptacle layout to meet energy codes; install new lighting fixtures throughout additions.plumbing: install new plumbing lines/fixtures at laundry, utility addition, kitchen island sink, and bathrooms.finishes: all trim (base, casing, crown molding, hidden doors) to match existing millwork profile and standard. all window glass to comply with current energy code requirements · 104 m away
- 5330 Livingston AveAug 7, 20255 ton system replacement · 106 m away
- 5305 Southern AveDec 3, 2020Remodel existing plumbing · 119 m away
- 5331 W Mockingbird LnOct 28, 2020Remove existing roof and install new roof · 124 m away
- 5323 W Mockingbird LnSep 15, 2025Driveway and approach · 130 m away
- 5313 Livingston AveApr 21, 2026Replace existing hvac equipment · 138 m away
- 5346 W Mockingbird LnNov 18, 2025Install new water heater · 144 m away