5331 Southern Ave
Dallas, TX 75209
5331 Southern Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 5331 Southern Ave, Dallas, TX 75209. The most recent, filed July 19, 2025, covers: “Removed and replace 1 condenser & 1 coil”.
Compiled from City of Dallas records · updated Jul 19, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 19, 2025
- since Jul 19, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 5331 Southern Ave
What is being built at 5331 Southern Ave?
The latest filing (City of Dallas permit RES-MEC-25-001367, July 19, 2025) covers removed and replace 1 condenser & 1 coil.
How many permits and filings does 5331 Southern Ave have?
1 filing across 1 project, from July 19, 2025 to July 19, 2025.
Is there other construction near 5331 Southern Ave?
Yes. Nearby filings include 5322 Southern Ave (install new rinnai outdoor tankless unit, May 21, 2026); 5314 Southern Ave (replace existing fence (wood only, galvanized steel posts will be re-used), approx. 383 linear ft and 8ft tall with two walk gates, Jul 21, 2025); 5349 Southern Ave (replace hvac system with 2 ton goodman 17 seer 2 stage complete gas system; no duct work, May 13, 2026).
How do I get alerts for new permits at 5331 Southern Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75209- 5322 Southern AveMay 21, 2026Install new rinnai outdoor tankless unit · 26 m away
- 5314 Southern AveJul 21, 2025Replace existing fence (wood only, galvanized steel posts will be re-used), approx. 383 linear ft and 8ft tall with two walk gates · 47 m away
- 5349 Southern AveMay 13, 2026Replace hvac system with 2 ton goodman 17 seer 2 stage complete gas system; no duct work · 53 m away
- 5305 Southern AveDec 3, 2020Remodel existing plumbing · 69 m away
- 5364 Southern AveJan 14, 2026Replace existing 5-ton outdoor condenser and indoor evaporator coil; install new condenser pad, electrical whip, and emergency disconnect · 100 m away
- 5313 Livingston AveApr 21, 2026Replace existing hvac equipment · 107 m away
- 5318 W Mockingbird LnOct 9, 2026Nsfaa-add/rem demolition & site preparationexterior wall alterations: select selective demolition of exterior wall portions to open connections for the new utility addition and screened porch.site prep: prep ground area adjacent to existing structure to accept new slab-on-grade foundations.2. screened porch addition (254 sq ft)foundation & structure: cast concrete slab foundation matching house floor elevation; construct frame structure with post/angle supports.enclosure: install framing for screened openings along exterior perimeter; align centerline with living room.interior connections: align layout with breakfast (bkfst) nook and living room doors.3. utility & laundry addition (83 sq ft)foundation & framing: pour concrete foundation slab (83 sq ft footprint); frame exterior walls adjacent to the existing garage and laundry room.plumbing & mechanical: extend water lines and drainage for relocate/new washer & dryer (with d) units and utility sink.door openings: install pocket/sliding or hinged hidden doors connecting to the expanded pantry and laundry room.4. interior alterations & millworkkitchen & breakfast nook:reconfigure layout with continuous counter run, island prep sink, and double sink location.custom millwork blocking and installation for kitchen cabinets, island, and adjacent pantry.living room & dining:maintain flat ceiling height ($8'\\text{-}0''$ typical) and center focus on fireplace centerline.frame pocket/glass doors between dining and patio areas.bathrooms & bedrooms:reconfigure powder room, bath 2, and primary/secondary bath layouts.install blocking in walls for all fixtures, towel bars, mirrors, and closet shelving.5. mep (mechanical, electrical, plumbing) & general noteshvac: modify and extend ductwork/systems as required for the reconfigured floor plan layout.electrical: update switch/receptacle layout to meet energy codes; install new lighting fixtures throughout additions.plumbing: install new plumbing lines/fixtures at laundry, utility addition, kitchen island sink, and bathrooms.finishes: all trim (base, casing, crown molding, hidden doors) to match existing millwork profile and standard. all window glass to comply with current energy code requirements · 118 m away
- 5330 Livingston AveAug 7, 20255 ton system replacement · 122 m away
- 5372 Southern AveAug 29, 2025Replacing existing roof with gaf timberline hdz complete roofing system · 123 m away
- 5323 W Mockingbird LnSep 15, 2025Driveway and approach · 126 m away
- 5331 W Mockingbird LnOct 28, 2020Remove existing roof and install new roof · 126 m away
- 5346 W Mockingbird LnNov 18, 2025Install new water heater · 189 m away