122 Pleasant Dr
Dallas, TX 75217 · Rivera Trucking
Rivera Trucking industrial building planned at 122 Pleasant Dr
A 6,000-square-foot industrial building for Rivera Trucking is planned at 122 Pleasant Dr in Dallas. The project was registered with the Texas Department of Licensing and Regulation on March 27, 2025, and includes a concrete slab, metal framing, grading and fencing. The applicant's estimated project cost is $320,000.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 27, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Mar 27, 2025
- since Mar 27, 2025
- Largest scope
- 6,000 sf
- Estimated cost
- $320K
- state registration
Where this project stands
In state plan reviewLuis Rivera
6,000 sq ft · $320K est.
- RegisteredMar 27, 2025
- Plan reviewnow
- ConstructionJun '25 – Oct '25
- Inspected
- Closed
Design is filed with the state. Subcontractors and suppliers are usually picked around now.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectNew concrete slab, new metal framing industrial building, grading and fencing — rivera trucking
TDLR project registrationNew ConstructionProject Registered6,000 sq ft$320K est.- Project #
- TABS2025015278
- Tenant / owner
- Luis Rivera
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 122 Pleasant Dr
What is being built at 122 Pleasant Dr in Dallas?
A 6,000-square-foot industrial building for Rivera Trucking is planned at the address. The project registration describes a new concrete slab, metal framing, grading and fencing.
When was the 122 Pleasant Dr project registered?
The project was registered with the Texas Department of Licensing and Regulation on March 27, 2025. Its registration number is TABS2025015278.
How large is the planned building at 122 Pleasant Dr?
The project registration lists the industrial building at 6,000 square feet.
What is the estimated cost of the 122 Pleasant Dr project?
The applicant's estimate for the project is $320,000, according to its TDLR registration.
Is a new industrial building planned near Kleberg Trail Phase 1?
A 6,000-square-foot industrial building is planned at 122 Pleasant Dr, about 294 meters from Kleberg Trail Phase 1. The project was registered on March 27, 2025.
What work is included in the Rivera Trucking project?
The registration describes a new concrete slab and metal-framed industrial building, along with grading and fencing. It lists the project type as new construction.
Also being built nearby
All of 75217- 121 Pleasant DrAug 5, 2026Electrical repair bottom meter base jaw and replace damaged wires in disconnect..address 121 pleasant dr unit 206, dallas tx 75126 · 15 m away
- 8310 C F Hawn Serv NJan 17, 2026Cancel urinal and, install lavatory · 103 m away
- 8310 C F Hawn FwyDec 12, 2025Property site: 8310 c f hawn fwy2 foot high stone wall 4 foot high metal fence materials: austin white stone, metal postingsetback: 3 inch setback fence location: front property · 103 m away
- 8222 C F Hawn FwyMay 29, 2025Ew permit for clean and show · 120 m away
- 160 Pleasant DrSep 18, 2026New commercial warehouse with office - need to apply for early release and also q-team review · 140 m away
- 8204 C F Hawn FwySep 14, 2026No work performed. oncor needs approval to restore electricity · 147 m away
- 8221 C F Hawn FwyOct 19, 2026No work being done. electricity was disconnected due to an unpaid balance but there was no changes to odometer no changes at all. oncir needs a release of waiver or permit to reconnect · 208 m away
- 205 Glenview StNov 4, 2025Service repair, new weather head and riser wires · 242 m away
- 8140 C F Hawn FwyFeb 5, 2026Building 2 install 5 new heaters · 252 m away
- 8130 C F Hawn FwyJul 29, 2025Replace meter base, service riser, load center, and branch circuit · 269 m away
- 216 Glenview StJul 24, 2025Replace roof · 269 m away
- 222 Glenview StMar 2, 2026Removed old shingles and layer felt install new layer felt and shingles · 280 m away