8140 C F Hawn Fwy
Dallas, TX 75217
Dallas permits show mini-warehouse buildings and heater work
City of Dallas permits indicate commercial electrical work for mini-warehouse buildings at 8140 C F Hawn Fwy, filed September 10–12, 2025. Additional permits filed January 15 through February 5, 2026, cover installation of heaters in several buildings at the site.
Summarized from City of Dallas records · updated Feb 5, 2026
- Projects
- 24
- 24 filings
- Latest filing
- Feb 5, 2026
- since Jun 21, 2022
- Largest scope
- —
- Listed value
- $2.1M
- partial · often understated
Permit & project history
24 projectsSources: City of Dallas
Questions about 8140 C F Hawn Fwy
What is being built at 8140 C F Hawn Fwy?
Dallas permits describe electrical work for mini-warehouse buildings, including buildings 1 through 4, and electrical work on building 5. Later permits cover installation of new heaters.
When were permits filed for the mini-warehouse buildings?
The City of Dallas filed electrical permits for the buildings September 10–12, 2025. The records include permits COM-ELC-25-002103 and COM-ELC-25-002173.
Are heaters being installed at 8140 C F Hawn Fwy?
Yes. City permits filed January 15 through February 5, 2026, describe installation of new heaters in several buildings at the site.
Is this a self-storage facility?
The permits describe the buildings as mini warehouses. They do not provide further details about the facility or its operation.
What's being built near Kleberg Trail Phase 1?
Permits for 8140 C F Hawn Fwy, about 297 meters from Kleberg Trail Phase 1, describe mini-warehouse buildings and related electrical and heater work.
What is the latest permit for 8140 C F Hawn Fwy?
The latest record in the provided permits is COM-MEC-26-000234, filed February 5, 2026. It describes installation of five new heaters in building 2.
Also being built nearby
All of 75217- 8130 C F Hawn FwyJul 29, 2025Replace meter base, service riser, load center, and branch circuit · 18 m away
- 8120 C F Hawn FwyApr 15, 202685 ft of sewer drain lines on sewer tap outside only · 35 m away
- 8204 C F Hawn FwySep 14, 2026No work performed. oncor needs approval to restore electricity · 113 m away
- 8221 C F Hawn FwyOct 19, 2026No work being done. electricity was disconnected due to an unpaid balance but there was no changes to odometer no changes at all. oncir needs a release of waiver or permit to reconnect · 136 m away
- 8222 C F Hawn FwyMay 29, 2025Ew permit for clean and show · 144 m away
- 120 S Buckner BlvdJan 22, 2026Gas test for activation of servicesviolation removed 1-7-26 ok to remove hold jcruce · 188 m away
- 8123 Elkton CirJun 18, 2026Electrician passed inspection on old permit 2412131099-194462103-002_el_1 passed on 6/5 by jeremy strawn · 191 m away
- 8118 Elkton CirNov 9, 2026Remove existing roofing system and replace. new underlayment, shingles and accessories · 201 m away
- 160 Pleasant DrSep 18, 2026New commercial warehouse with office - need to apply for early release and also q-team review · 227 m away
- 121 Pleasant DrAug 5, 2026Electrical repair bottom meter base jaw and replace damaged wires in disconnect..address 121 pleasant dr unit 206, dallas tx 75126 · 244 m away
- 121 Murdock RdNov 19, 2026Remove and dispose of the existing roofing system on the main building. furnish and install a new malarkey vista ar class 4 impact-resistant asphalt shingle roofing system, including required underlayment, flashing, starter shingles, hip and ridge shingles, and associated roofing accessories in accordance with manufacturer specifications and applicable building codes. no structural modifications or changes to the building's existing use are proposed · 245 m away
- 122 Pleasant Dr · Rivera TruckingMar 27, 2025Luis rivera — new construction — new concrete slab, new metal framing industrial building, grading and fencing · 252 m away