8221 C F Hawn Fwy
Dallas, TX 75217
Roof and front-door repairs permitted at 8221 C F Hawn Fwy
Permits at 8221 C F Hawn Fwy indicate roof replacement work filed on January 19, 2026, and replacement of an existing front door filed on February 20, 2026. An October 19 electrical permit filing says no work was done and requests approval to reconnect electricity after it was disconnected over an unpaid balance.
Summarized from City of Dallas records · updated Oct 19, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Oct 19, 2026
- since Jan 19, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsNo work being done. electricity was disconnected due to an unpaid balance but there was no changes to odometer no changes at all. oncir needs a release of waiver or permit to reconnect
No work being done. electricity was disconnected due to an unpaid balance but there was no changes to odometer no changes at all. oncir needs a release of waiver or permit to reconnect
City of Dallas permitCommercial Electrical Permit
Sources: City of Dallas
Questions about 8221 C F Hawn Fwy
What is being built at 8221 C F Hawn Fwy?
The records do not describe a new building. They indicate roof and front-door replacement work, plus an electrical filing about reconnecting service.
Is 8221 C F Hawn Fwy getting a new roof?
A commercial roofing permit filed January 19, 2026, describes replacing the roofing on the existing structure. The record does not provide a project cost or square footage.
What work is planned on the front door at 8221 C F Hawn Fwy?
A commercial alteration permit filed February 20, 2026, describes replacing the existing outdated vinyl front door.
Why was an electrical permit filed at 8221 C F Hawn Fwy?
The October 19, 2026, filing, COM-ELC-26-005176, says electricity had been disconnected over an unpaid balance and requests approval or a permit to reconnect it. The description says no work or changes were made.
When were permits filed for 8221 C F Hawn Fwy?
The roofing permit was filed January 19, 2026; the front-door alteration permit was filed February 20, 2026; and the electrical permit was filed October 19, 2026.
Also being built nearby
All of 75217- 8204 C F Hawn FwySep 14, 2026No work performed. oncor needs approval to restore electricity · 87 m away
- 8222 C F Hawn FwyMay 29, 2025Ew permit for clean and show · 95 m away
- 8123 Elkton CirJun 18, 2026Electrician passed inspection on old permit 2412131099-194462103-002_el_1 passed on 6/5 by jeremy strawn · 116 m away
- 8118 Elkton CirNov 9, 2026Remove existing roofing system and replace. new underlayment, shingles and accessories · 118 m away
- 8140 C F Hawn FwyFeb 5, 2026Building 2 install 5 new heaters · 136 m away
- 8130 C F Hawn FwyJul 29, 2025Replace meter base, service riser, load center, and branch circuit · 150 m away
- 8120 C F Hawn FwyApr 15, 202685 ft of sewer drain lines on sewer tap outside only · 164 m away
- 121 Pleasant DrAug 5, 2026Electrical repair bottom meter base jaw and replace damaged wires in disconnect..address 121 pleasant dr unit 206, dallas tx 75126 · 195 m away
- 8132 Bambi StOct 27, 2026Demolition for new build demolition all structures and rebuild single family home · 195 m away
- 122 Pleasant Dr · Rivera TruckingMar 27, 2025Luis rivera — new construction — new concrete slab, new metal framing industrial building, grading and fencing · 208 m away
- 8310 C F Hawn FwyDec 12, 2025Property site: 8310 c f hawn fwy2 foot high stone wall 4 foot high metal fence materials: austin white stone, metal postingsetback: 3 inch setback fence location: front property · 230 m away
- 8310 C F Hawn Serv NJan 17, 2026Cancel urinal and, install lavatory · 230 m away