8130 C F Hawn Fwy
Dallas, TX 75217
Electrical service equipment replacement permitted on C F Hawn Fwy
A commercial electrical permit at 8130 C F Hawn Fwy covers replacement of the meter base, service riser, load center and branch circuit. The permit was filed with the City of Dallas on July 29, 2025.
Summarized from City of Dallas records · updated Jul 29, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 29, 2025
- since Jul 29, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 8130 C F Hawn Fwy
What work is permitted at 8130 C F Hawn Fwy?
The City of Dallas permit covers replacing the meter base, service riser, load center and branch circuit.
When was the electrical permit filed for 8130 C F Hawn Fwy?
The permit was filed on July 29, 2025.
What is the permit number for work at 8130 C F Hawn Fwy?
The permit number is COM-ELC-25-001105.
Is a new building being constructed at 8130 C F Hawn Fwy?
The available record is for electrical work: replacement of service equipment and a branch circuit. It does not describe new building construction.
What is happening near Kleberg Trail Phase 1 at C F Hawn Fwy?
A City of Dallas permit at 8130 C F Hawn Fwy covers replacement of the meter base, service riser, load center and branch circuit. The listed Kleberg Trail Phase 1 landmark is about 300 meters away.
Also being built nearby
All of 75217- 8120 C F Hawn FwyApr 15, 202685 ft of sewer drain lines on sewer tap outside only · 18 m away
- 8140 C F Hawn FwyFeb 5, 2026Building 2 install 5 new heaters · 18 m away
- 8204 C F Hawn FwySep 14, 2026No work performed. oncor needs approval to restore electricity · 130 m away
- 8221 C F Hawn FwyOct 19, 2026No work being done. electricity was disconnected due to an unpaid balance but there was no changes to odometer no changes at all. oncir needs a release of waiver or permit to reconnect · 150 m away
- 8222 C F Hawn FwyMay 29, 2025Ew permit for clean and show · 162 m away
- 120 S Buckner BlvdJan 22, 2026Gas test for activation of servicesviolation removed 1-7-26 ok to remove hold jcruce · 171 m away
- 8123 Elkton CirJun 18, 2026Electrician passed inspection on old permit 2412131099-194462103-002_el_1 passed on 6/5 by jeremy strawn · 195 m away
- 8118 Elkton CirNov 9, 2026Remove existing roofing system and replace. new underlayment, shingles and accessories · 206 m away
- 160 Pleasant DrSep 18, 2026New commercial warehouse with office - need to apply for early release and also q-team review · 239 m away
- 121 Murdock RdNov 19, 2026Remove and dispose of the existing roofing system on the main building. furnish and install a new malarkey vista ar class 4 impact-resistant asphalt shingle roofing system, including required underlayment, flashing, starter shingles, hip and ridge shingles, and associated roofing accessories in accordance with manufacturer specifications and applicable building codes. no structural modifications or changes to the building's existing use are proposed · 239 m away
- 121 Pleasant DrAug 5, 2026Electrical repair bottom meter base jaw and replace damaged wires in disconnect..address 121 pleasant dr unit 206, dallas tx 75126 · 262 m away
- 122 Pleasant Dr · Rivera TruckingMar 27, 2025Luis rivera — new construction — new concrete slab, new metal framing industrial building, grading and fencing · 269 m away