10016 Medlock Dr
Dallas, TX 75218
5-ton HVAC replacement permitted at 10016 Medlock Dr
A residential mechanical permit indicates a complete 5-ton system replacement at 10016 Medlock Dr in Dallas. The permit was filed on August 31, 2026, under permit RES-MEC-26-004785.
Summarized from City of Dallas records · updated Aug 31, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Aug 31, 2026
- since Aug 31, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 10016 Medlock Dr
What work is permitted at 10016 Medlock Dr?
A City of Dallas residential mechanical permit describes a complete 5-ton system replacement. The record does not specify additional work.
When was the permit filed for 10016 Medlock Dr?
The permit was filed on August 31, 2026.
What is the permit number for 10016 Medlock Dr?
The City of Dallas permit number is RES-MEC-26-004785.
Is a new house being built at 10016 Medlock Dr?
The available record is for a residential mechanical permit to replace a 5-ton system, not a new-home construction permit.
Is the work at 10016 Medlock Dr a residential project?
Yes. The record classifies it as a residential mechanical permit.
Also being built nearby
All of 75218- 10022 Medlock DrJul 29, 2025Replace 3ton standard horizontal furnace · 6 m away
- 10017 Medlock DrApr 14, 2026We are putting in a new main sewer line through the front yard and replacing/relocating the water heater · 13 m away
- 733 Kirkwood DrOct 5, 2026Install approx 193 linear feet of 8ft tall cedar picket fence with two walk gates · 29 m away
- 724 Kirkwood DrNov 5, 2020Remodel existing plumbing · 32 m away
- 745 Kirkwood DrAug 26, 2025Replace rusted main panel and relocate sub panel to the outside · 41 m away
- 748 Kirkwood DrMay 22, 2026Replace existing fence with new fence. no changes to layout · 42 m away
- 719 Kirkwood DrMay 21, 2026Make an access on the left side of home by ac unit tunneling 5 ft to make access underneath home. after access has been made we then will proceed with removing all existing and remaining cast iron out from underneath the home. after all lines has been removed we then will proceed with installing new schedule 40 3 inch and 2-in pvc with anchors and clamps every 4 ft to the subfloor connecting to all vent pipes going through the floor. this will also include pulling and resetting both toilets in the restroom and replacing flanges with new wax rings toilet boats and reset of toilet. all work will be permitted and inspected by the city · 63 m away
- 821 Creekridge DrNov 5, 2025Electrical for addition · 80 m away
- 827 Creekridge DrApr 20, 2026Hvac replacement · 83 m away
- 833 Creekridge DrOct 16, 2026Remodel to include foyer, living area, sunroom, yoga area, kitchen/breakfast area, office, art studio, and utility area · 90 m away
- 10111 Medlock DrFeb 4, 2026Replace cast iron sewer main line under home and replace cast iron sewer main line from out to city easement · 103 m away
- 845 Creekridge DrJul 1, 2026Rheem classic 5 ton gas upflow, 2 stage furnace and comdenser up to 16 seer2 · 108 m away