733 Kirkwood Dr
Dallas, TX 75218
733 Kirkwood Dr fence permit covers 193 feet of cedar fencing
A City of Dallas permit filed October 5, 2026, covers about 193 linear feet of 8-foot-tall cedar picket fence and two walk gates at 733 Kirkwood Dr. The record classifies the work as a residential accessory structure permit.
Summarized from City of Dallas records · updated Oct 5, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Oct 5, 2026
- since Oct 5, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 733 Kirkwood Dr
What is being built at 733 Kirkwood Dr?
A City of Dallas permit covers about 193 linear feet of 8-foot-tall cedar picket fence with two walk gates. It was filed October 5, 2026.
When was the fence permit filed for 733 Kirkwood Dr?
The City of Dallas permit was filed October 5, 2026.
How tall will the fence at 733 Kirkwood Dr be?
The permit describes an 8-foot-tall cedar picket fence.
How long is the fence planned for 733 Kirkwood Dr?
The permit describes approximately 193 linear feet of fencing.
Will the fence at 733 Kirkwood Dr have gates?
Yes. The permit describes two walk gates.
Is a new house being built at 733 Kirkwood Dr?
The available permit is for a residential accessory structure: an 8-foot-tall cedar picket fence with two walk gates. It does not describe a new house.
Also being built nearby
All of 75218- 745 Kirkwood DrAug 26, 2025Replace rusted main panel and relocate sub panel to the outside · 15 m away
- 724 Kirkwood DrNov 5, 2020Remodel existing plumbing · 25 m away
- 748 Kirkwood DrMay 22, 2026Replace existing fence with new fence. no changes to layout · 25 m away
- 10016 Medlock DrAug 31, 2026Replace 5 ton complete · 29 m away
- 10017 Medlock DrApr 14, 2026We are putting in a new main sewer line through the front yard and replacing/relocating the water heater · 33 m away
- 10022 Medlock DrJul 29, 2025Replace 3ton standard horizontal furnace · 35 m away
- 719 Kirkwood DrMay 21, 2026Make an access on the left side of home by ac unit tunneling 5 ft to make access underneath home. after access has been made we then will proceed with removing all existing and remaining cast iron out from underneath the home. after all lines has been removed we then will proceed with installing new schedule 40 3 inch and 2-in pvc with anchors and clamps every 4 ft to the subfloor connecting to all vent pipes going through the floor. this will also include pulling and resetting both toilets in the restroom and replacing flanges with new wax rings toilet boats and reset of toilet. all work will be permitted and inspected by the city · 54 m away
- 827 Creekridge DrApr 20, 2026Hvac replacement · 98 m away
- 821 Creekridge DrNov 5, 2025Electrical for addition · 98 m away
- 833 Creekridge DrOct 16, 2026Remodel to include foyer, living area, sunroom, yoga area, kitchen/breakfast area, office, art studio, and utility area · 100 m away
- 845 Creekridge DrJul 1, 2026Rheem classic 5 ton gas upflow, 2 stage furnace and comdenser up to 16 seer2 · 113 m away
- 703 Kirkwood DrOct 22, 2025Install gas to pool heater and gas to bbq · 114 m away