10022 Medlock Dr
Dallas, TX 75218
10022 Medlock Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 10022 Medlock Dr, Dallas, TX 75218. The most recent, filed July 29, 2025, covers: “Replace 3ton standard horizontal furnace”.
Compiled from City of Dallas records · updated Jul 29, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 29, 2025
- since Jul 29, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 10022 Medlock Dr
What is being built at 10022 Medlock Dr?
The latest filing (City of Dallas permit RES-MEC-25-001597, July 29, 2025) covers replace 3ton standard horizontal furnace.
How many permits and filings does 10022 Medlock Dr have?
1 filing across 1 project, from July 29, 2025 to July 29, 2025.
Is there other construction near 10022 Medlock Dr?
Yes. Nearby filings include 10016 Medlock Dr (replace 5 ton complete, Aug 31, 2026); 10017 Medlock Dr (we are putting in a new main sewer line through the front yard and replacing/relocating the water heater, Apr 14, 2026); 733 Kirkwood Dr (install approx 193 linear feet of 8ft tall cedar picket fence with two walk gates, Oct 5, 2026).
How do I get alerts for new permits at 10022 Medlock Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75218- 10016 Medlock DrAug 31, 2026Replace 5 ton complete · 6 m away
- 10017 Medlock DrApr 14, 2026We are putting in a new main sewer line through the front yard and replacing/relocating the water heater · 14 m away
- 733 Kirkwood DrOct 5, 2026Install approx 193 linear feet of 8ft tall cedar picket fence with two walk gates · 35 m away
- 724 Kirkwood DrNov 5, 2020Remodel existing plumbing · 36 m away
- 745 Kirkwood DrAug 26, 2025Replace rusted main panel and relocate sub panel to the outside · 46 m away
- 748 Kirkwood DrMay 22, 2026Replace existing fence with new fence. no changes to layout · 46 m away
- 719 Kirkwood DrMay 21, 2026Make an access on the left side of home by ac unit tunneling 5 ft to make access underneath home. after access has been made we then will proceed with removing all existing and remaining cast iron out from underneath the home. after all lines has been removed we then will proceed with installing new schedule 40 3 inch and 2-in pvc with anchors and clamps every 4 ft to the subfloor connecting to all vent pipes going through the floor. this will also include pulling and resetting both toilets in the restroom and replacing flanges with new wax rings toilet boats and reset of toilet. all work will be permitted and inspected by the city · 67 m away
- 821 Creekridge DrNov 5, 2025Electrical for addition · 77 m away
- 827 Creekridge DrApr 20, 2026Hvac replacement · 81 m away
- 833 Creekridge DrOct 16, 2026Remodel to include foyer, living area, sunroom, yoga area, kitchen/breakfast area, office, art studio, and utility area · 88 m away
- 10111 Medlock DrFeb 4, 2026Replace cast iron sewer main line under home and replace cast iron sewer main line from out to city easement · 98 m away
- 845 Creekridge DrJul 1, 2026Rheem classic 5 ton gas upflow, 2 stage furnace and comdenser up to 16 seer2 · 107 m away