745 Kirkwood Dr
Dallas, TX 75218
745 Kirkwood Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 745 Kirkwood Dr, Dallas, TX 75218. The most recent, filed August 26, 2025, covers: “Replace rusted main panel and relocate sub panel to the outside”.
Compiled from City of Dallas records · updated Aug 26, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 26, 2025
- since Aug 26, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 745 Kirkwood Dr
What is being built at 745 Kirkwood Dr?
The latest filing (City of Dallas permit RES-ELC-25-002495, August 26, 2025) covers replace rusted main panel and relocate sub panel to the outside.
How many permits and filings does 745 Kirkwood Dr have?
1 filing across 1 project, from August 26, 2025 to August 26, 2025.
Is there other construction near 745 Kirkwood Dr?
Yes. Nearby filings include 748 Kirkwood Dr (replace existing fence with new fence. no changes to layout, May 22, 2026); 733 Kirkwood Dr (install approx 193 linear feet of 8ft tall cedar picket fence with two walk gates, Oct 5, 2026); 724 Kirkwood Dr (remodel existing plumbing, Nov 5, 2020).
How do I get alerts for new permits at 745 Kirkwood Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75218- 748 Kirkwood DrMay 22, 2026Replace existing fence with new fence. no changes to layout · 14 m away
- 733 Kirkwood DrOct 5, 2026Install approx 193 linear feet of 8ft tall cedar picket fence with two walk gates · 15 m away
- 724 Kirkwood DrNov 5, 2020Remodel existing plumbing · 39 m away
- 10016 Medlock DrAug 31, 2026Replace 5 ton complete · 41 m away
- 10022 Medlock DrJul 29, 2025Replace 3ton standard horizontal furnace · 46 m away
- 10017 Medlock DrApr 14, 2026We are putting in a new main sewer line through the front yard and replacing/relocating the water heater · 47 m away
- 719 Kirkwood DrMay 21, 2026Make an access on the left side of home by ac unit tunneling 5 ft to make access underneath home. after access has been made we then will proceed with removing all existing and remaining cast iron out from underneath the home. after all lines has been removed we then will proceed with installing new schedule 40 3 inch and 2-in pvc with anchors and clamps every 4 ft to the subfloor connecting to all vent pipes going through the floor. this will also include pulling and resetting both toilets in the restroom and replacing flanges with new wax rings toilet boats and reset of toilet. all work will be permitted and inspected by the city · 65 m away
- 827 Creekridge DrApr 20, 2026Hvac replacement · 95 m away
- 833 Creekridge DrOct 16, 2026Remodel to include foyer, living area, sunroom, yoga area, kitchen/breakfast area, office, art studio, and utility area · 96 m away
- 821 Creekridge DrNov 5, 2025Electrical for addition · 98 m away
- 845 Creekridge DrJul 1, 2026Rheem classic 5 ton gas upflow, 2 stage furnace and comdenser up to 16 seer2 · 105 m away
- 846 Creekridge DrDec 14, 2020Sewer relay · 118 m away