704 Parkhurst Dr
Dallas, TX 75218
Permits indicate a home addition and attached two-car garage
Permits indicate a home addition with an attached two-car garage at 704 Parkhurst Dr. The City of Dallas filed the residential alteration and addition permit on July 7, 2026. Related electrical, plumbing and mechanical permits were filed from August through October 2026.
Summarized from City of Dallas records · updated Oct 13, 2026
- Projects
- 7
- 7 filings
- Latest filing
- Oct 13, 2026
- since Aug 6, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
7 projectsSources: City of Dallas
Questions about 704 Parkhurst Dr
What is being built at 704 Parkhurst Dr?
A City of Dallas permit describes an addition and an attached two-car garage. The residential alteration and addition permit, RES-ALT-ADD-26-000860, was filed July 7, 2026.
When was the addition at 704 Parkhurst Dr permitted?
The residential alteration and addition permit was filed July 7, 2026. Related permits were filed through October 13, 2026.
Are there plumbing permits for 704 Parkhurst Dr?
Yes. The City filed a permit for new plumbing for the addition on September 13, 2026, under permit RES-PLM-26-009704.
Are there electrical or mechanical permits for the Parkhurst Dr addition?
Yes. An electrical remodel permit was filed August 27, 2026, and a mechanical permit for installing one system on the addition was filed October 13, 2026.
What work was permitted at 704 Parkhurst Dr in 2025?
A residential plumbing permit filed August 6, 2025, describes installing 50 feet of one-inch PEX water-service pipe from the meter to the house.
Also being built nearby
All of 75218- 703 Kirkwood DrOct 22, 2025Install gas to pool heater and gas to bbq · 82 m away
- 741 Parkhurst DrJun 11, 20263 ton base horizontal gas system · 102 m away
- 719 Kirkwood DrMay 21, 2026Make an access on the left side of home by ac unit tunneling 5 ft to make access underneath home. after access has been made we then will proceed with removing all existing and remaining cast iron out from underneath the home. after all lines has been removed we then will proceed with installing new schedule 40 3 inch and 2-in pvc with anchors and clamps every 4 ft to the subfloor connecting to all vent pipes going through the floor. this will also include pulling and resetting both toilets in the restroom and replacing flanges with new wax rings toilet boats and reset of toilet. all work will be permitted and inspected by the city · 106 m away
- 724 Kirkwood DrNov 5, 2020Remodel existing plumbing · 139 m away
- 736 Brookhurst DrJan 12, 2021Addition of detached garage · 139 m away
- 740 Brookhurst DrMar 24, 20264 ton deluxe 80% gas system - upflow · 145 m away
- 10017 Medlock DrApr 14, 2026We are putting in a new main sewer line through the front yard and replacing/relocating the water heater · 158 m away
- 733 Kirkwood DrOct 5, 2026Install approx 193 linear feet of 8ft tall cedar picket fence with two walk gates · 158 m away
- 628 Kirkwood DrOct 14, 2025Remove and replace shingles · 160 m away
- 743 Brookhurst DrSep 30, 2025Replace existing hvac equipment and install new hvac system to addition · 162 m away
- 745 Kirkwood DrAug 26, 2025Replace rusted main panel and relocate sub panel to the outside · 167 m away
- 10016 Medlock DrAug 31, 2026Replace 5 ton complete · 169 m away