2911 Turtle Creek Blvd. 4th
Dallas, TX 75219 · Piedmont Realty Trust
4th-floor restrooms and corridor renovation at 2911 Turtle Creek
A renovation of 4th-floor restrooms and a corridor is planned at 2911 Turtle Creek Blvd. The project was registered with TDLR on September 4, 2026, as a 1,005-square-foot renovation and alteration. The applicant estimated the project cost at $300,000.
Summarized from Texas Department of Licensing and Regulation records · updated Sep 4, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 4, 2026
- since Sep 4, 2026
- Largest scope
- 1,005 sf
- Estimated cost
- $300K
- state registration
Where this project stands
Under construction4th Floor Restrooms and Corridor
1,005 sq ft · $300K est.
- RegisteredSep 4, 2026
- Plan review
- ConstructionSep '26 – Dec '26
- Inspected
- Closed
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectCapital improvement — park place on turtle creek
TDLR project registrationRenovation/AlterationReview Complete1,005 sq ft$300K est.- Project #
- TABS2027000393
- Tenant / owner
- 4th Floor Restrooms And Corridor
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 2911 Turtle Creek Blvd. 4th
What is being built at 2911 Turtle Creek Blvd. in Dallas?
A TDLR registration describes a renovation of the 4th-floor restrooms and corridor at 2911 Turtle Creek Blvd. It lists 1,005 square feet of work.
When was the 4th-floor restroom renovation filed?
The project was registered on September 4, 2026. Its TDLR project number is TABS2027000393.
How much will the 2911 Turtle Creek renovation cost?
The applicant estimated the project cost at $300,000 in the TDLR registration. This is an estimate, not a confirmed final cost.
Is the project at 2911 Turtle Creek new construction?
No. The TDLR record classifies it as a renovation or alteration and describes it as a capital improvement.
What's being renovated near Analysis Group's restrooms on Turtle Creek?
A separate TDLR registration covers 4th-floor restrooms and a corridor at 2911 Turtle Creek Blvd. Analysis Group's restrooms are listed at the same building address on the 7th floor.
What is the status of the 4th-floor renovation at 2911 Turtle Creek?
The TDLR record lists the status as “Review Complete.” It was registered on September 4, 2026, under project number TABS2027000393.
Also being built nearby
All of 75219- 2911 Turtle Creek Boulevard · Piedmont Office Realty TrustJan 23, 2025Pcb turtle creek - 13th floor — new construction — partial renovation of a second generation interior office space (2,327sf). work includes general construction and modifications to existing mep systems
- 2911 Turtle Creek Blvd · Piedmont Realty TrustOct 14, 2026Hvac demolition
- 2911 Turtle Creek Boulevard 7th · Piedmont Park Place, LPJun 30, 2026Analysis group - restrooms — renovation/alteration — renovation of existing restrooms
- 2999 Turtle Creek BlvdOct 7, 20262999 turtle creek -these are partitions walls that will be removed at end of show create 2 new spaces in existing interior for upcoming annual design show. only framing and electric is needed. space 20 = 100'space 21 = 100 · 19 m away
- 2821 Turtle Creek BlvdNov 17, 2026Temporary stage for band · 98 m away
- 2555 Turtle Creek BlvdApr 13, 2026Backflow 6" new plumbing · 109 m away
- 2801 Turtle Creek BlvdOct 16, 2026Complete demolition and remodel. demolition to the shell of the unit and build back. all new hvac, plumbing, mechanical, framing, drywall, millwork, cabinets, countertops, tile, fire detection, water detection, security, etc. demolition balcony to the structural slab, new waterproofing, new tile flooring, some new electrical outside, etc · 119 m away
- 3000 Turtle Creek BlvdAug 29, 2025Installing :11 track lights with 42 heads11 tree lights22 dedicated duplex outlets13 dmx lighting outlets2 quad outlets5 fan power boxes 480v 3p 30 amp12 poke thru devices2 floor boxes5 outdoor pedestal av boxes35 new 20-amp circuitslighting controls and dmx controls for stage lighting · 150 m away
- 3000 Turtle Creek BlvdSep 17, 2026Replace rpz · 150 m away
- 2525 Turtle Creek BlvdSep 14, 2026Level 14: new construction of 20-story assisted living building with 2 levels of underground parking. 2505 turtle creek · 171 m away
- 3082 Turtle Creek BlvdJun 4, 2026Installation of underground conduit to power wayfinding kiosk · 191 m away
- 2505 Turtle Creek Blvd · Vivante Turtle Creek, LLCSep 28, 2026Install full electrical for the building, including new electrical service · 213 m away