2911 Turtle Creek Boulevard
Dallas, TX 75219 · Pcb Turtle Creek - 13th Floor, Carson Capital
Office renovations registered at 2911 Turtle Creek Boulevard
Two tenant renovation projects were registered at the multi-tenant office building at 2911 Turtle Creek Boulevard. TDLR records dated March 26, 2024, and January 23, 2025, describe work in office spaces of 2,749 and 2,327 square feet, respectively.
Summarized from Texas Department of Licensing and Regulation records · updated Jan 23, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Jan 23, 2025
- since Mar 26, 2024
- Largest scope
- 2,749 sf
- Estimated cost
- $746K
- state registration
Where this project stands
CompletedPCB Turtle Creek - 13th Floor
2,327 sq ft · $75K est.
- RegisteredJan 23, 2025
- Plan review
- ConstructionFeb '25 – Apr '25
- Inspected
- Closed
Ran as a 2-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
2 projectsPartial renovation of a second generation interior office space (2,327sf). work includes general construction and modifications to existing mep systems. — park place on turtle creek
TDLR project registrationNew ConstructionProject Closed2,327 sq ft$75K est.- Project #
- TABS2025010213
- Tenant / owner
- Pcb Turtle Creek - 13th Floor
- Design firm
- Pro
- Contact
- Pro
2,749 sq ft of tenant renovations tospace — park place on turtle creek
TDLR project registrationRenovation/AlterationProject Closed2,749 sq ft$746K est.- Project #
- TABS2024014746
- Tenant / owner
- Carson Capital
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 2911 Turtle Creek Boulevard
What is being built at 2911 Turtle Creek Boulevard?
TDLR registrations indicate tenant renovations inside the multi-tenant office building, including work on existing mechanical, electrical and plumbing systems. The records do not describe a new building.
When were renovations permitted at 2911 Turtle Creek Boulevard?
The TDLR records were filed March 26, 2024, and January 23, 2025. They are listed as project registrations and both projects are marked closed.
What are the project numbers for the 2911 Turtle Creek renovations?
The registrations are TABS2024014746, filed March 26, 2024, and TABS2025010213, filed January 23, 2025.
How large are the office renovation projects at 2911 Turtle Creek?
The filings describe tenant renovation work in spaces of 2,749 square feet and 2,327 square feet.
What is happening near Vivante Turtle Creek?
At 2911 Turtle Creek Boulevard, about 213 meters from Vivante Turtle Creek, TDLR records describe two office tenant renovation projects filed in 2024 and 2025.
Is a new office building going up near Piedmont Park Place?
The records for 2911 Turtle Creek Boulevard describe renovations to existing office space, not construction of a new office building. The filings are associated with Piedmont Park Place at the same address.
Also being built nearby
All of 75219- 2911 Turtle Creek Blvd · Piedmont Realty TrustOct 14, 2026Hvac demolition
- 2911 Turtle Creek Blvd. 4th · Piedmont Realty TrustSep 4, 20264th floor restrooms and corridor — renovation/alteration — capital improvement
- 2911 Turtle Creek Boulevard 7th · Piedmont Park Place, LPJun 30, 2026Analysis group - restrooms — renovation/alteration — renovation of existing restrooms
- 2999 Turtle Creek BlvdOct 7, 20262999 turtle creek -these are partitions walls that will be removed at end of show create 2 new spaces in existing interior for upcoming annual design show. only framing and electric is needed. space 20 = 100'space 21 = 100 · 19 m away
- 2821 Turtle Creek BlvdNov 17, 2026Temporary stage for band · 98 m away
- 2555 Turtle Creek BlvdApr 13, 2026Backflow 6" new plumbing · 109 m away
- 2801 Turtle Creek BlvdOct 16, 2026Complete demolition and remodel. demolition to the shell of the unit and build back. all new hvac, plumbing, mechanical, framing, drywall, millwork, cabinets, countertops, tile, fire detection, water detection, security, etc. demolition balcony to the structural slab, new waterproofing, new tile flooring, some new electrical outside, etc · 119 m away
- 3000 Turtle Creek BlvdAug 29, 2025Installing :11 track lights with 42 heads11 tree lights22 dedicated duplex outlets13 dmx lighting outlets2 quad outlets5 fan power boxes 480v 3p 30 amp12 poke thru devices2 floor boxes5 outdoor pedestal av boxes35 new 20-amp circuitslighting controls and dmx controls for stage lighting · 150 m away
- 3000 Turtle Creek BlvdSep 17, 2026Replace rpz · 150 m away
- 2525 Turtle Creek BlvdSep 14, 2026Level 14: new construction of 20-story assisted living building with 2 levels of underground parking. 2505 turtle creek · 171 m away
- 3082 Turtle Creek BlvdJun 4, 2026Installation of underground conduit to power wayfinding kiosk · 191 m away
- 2505 Turtle Creek Blvd · Vivante Turtle Creek, LLCSep 28, 2026Install full electrical for the building, including new electrical service · 213 m away
More offices in 75219.