2911 Turtle Creek Boulevard 7th
Dallas, TX 75219 · Analysis Group - Restrooms, Analysis Group
7th-floor office space and restroom renovations at Park Place
TDLR registrations show renovations to existing 7th-floor space and restrooms at the multi-tenant Park Place building at 2911 Turtle Creek Boulevard. The 13,200-square-foot office renovation was registered on September 22, 2025; a 360-square-foot restroom renovation was registered on June 30, 2026.
Summarized from Texas Department of Licensing and Regulation records · updated Jun 30, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jun 30, 2026
- since Sep 22, 2025
- Largest scope
- 13,200 sf
- Estimated cost
- $800K
- state registration
Where this project stands
Under constructionAnalysis Group - Restrooms
360 sq ft · $300K est.
- RegisteredJun 30, 2026
- Plan review
- ConstructionJul '26 – Nov '26
- Inspected
- Closed
4 contacts on this project · 3 phone numbers
Permit & project history
2 projectsRenovation of existing restrooms — park place
TDLR project registrationRenovation/AlterationReview Complete360 sq ft$300K est.- Project #
- TABS2026024121
- Tenant / owner
- Analysis Group - Restrooms
- Design firm
- Pro
- Contact
- Pro
Renovation and built out of existing 7th floor space — park place
TDLR project registrationRenovation/AlterationInspection Complete13,200 sq ft$800K est.- Project #
- TABS2026001407
- Tenant / owner
- Analysis Group
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 2911 Turtle Creek Boulevard 7th
What is being renovated at 2911 Turtle Creek Boulevard?
TDLR registrations describe a renovation and build-out of existing 7th-floor space, plus a separate renovation of existing restrooms. The projects were registered on September 22, 2025, and June 30, 2026.
Is Analysis Group renovating the 7th floor at Park Place?
A TDLR registration named Analysis Group describes renovation and build-out of existing 7th-floor space. The 13,200-square-foot project was registered September 22, 2025, under TABS2026001407.
Are restrooms being renovated at 2911 Turtle Creek Boulevard?
Yes. A TDLR registration describes renovation of existing restrooms in a 360-square-foot project, filed June 30, 2026, as TABS2026024121.
What's being renovated near the 4th Floor Whitebox at Park Place?
TDLR records list a 7th-floor space renovation and a separate restroom renovation at 2911 Turtle Creek Boulevard, the same address as the 4th Floor Whitebox listing.
How large are the renovations at 2911 Turtle Creek Boulevard?
The registered 7th-floor office renovation covers 13,200 square feet. The separate restroom renovation covers 360 square feet.
Also being built nearby
All of 75219- 2911 Turtle Creek Boulevard · Piedmont Office Realty TrustJan 23, 2025Pcb turtle creek - 13th floor — new construction — partial renovation of a second generation interior office space (2,327sf). work includes general construction and modifications to existing mep systems
- 2911 Turtle Creek Blvd · Piedmont Realty TrustOct 14, 2026Hvac demolition
- 2911 Turtle Creek Blvd. 4th · Piedmont Realty TrustSep 4, 20264th floor restrooms and corridor — renovation/alteration — capital improvement
- 2999 Turtle Creek BlvdOct 7, 20262999 turtle creek -these are partitions walls that will be removed at end of show create 2 new spaces in existing interior for upcoming annual design show. only framing and electric is needed. space 20 = 100'space 21 = 100 · 19 m away
- 2821 Turtle Creek BlvdNov 17, 2026Temporary stage for band · 98 m away
- 2555 Turtle Creek BlvdApr 13, 2026Backflow 6" new plumbing · 109 m away
- 2801 Turtle Creek BlvdOct 16, 2026Complete demolition and remodel. demolition to the shell of the unit and build back. all new hvac, plumbing, mechanical, framing, drywall, millwork, cabinets, countertops, tile, fire detection, water detection, security, etc. demolition balcony to the structural slab, new waterproofing, new tile flooring, some new electrical outside, etc · 119 m away
- 3000 Turtle Creek BlvdAug 29, 2025Installing :11 track lights with 42 heads11 tree lights22 dedicated duplex outlets13 dmx lighting outlets2 quad outlets5 fan power boxes 480v 3p 30 amp12 poke thru devices2 floor boxes5 outdoor pedestal av boxes35 new 20-amp circuitslighting controls and dmx controls for stage lighting · 150 m away
- 3000 Turtle Creek BlvdSep 17, 2026Replace rpz · 150 m away
- 2525 Turtle Creek BlvdSep 14, 2026Level 14: new construction of 20-story assisted living building with 2 levels of underground parking. 2505 turtle creek · 171 m away
- 3082 Turtle Creek BlvdJun 4, 2026Installation of underground conduit to power wayfinding kiosk · 191 m away
- 2505 Turtle Creek Blvd · Vivante Turtle Creek, LLCSep 28, 2026Install full electrical for the building, including new electrical service · 213 m away