2999 Turtle Creek Blvd
Dallas, TX 75219
Interior changes for an annual design show at 2999 Turtle Creek
Permits indicate temporary interior partitions and electrical work for an annual design show at 2999 Turtle Creek Blvd. Dallas permits filed September 22 and October 10, 2025, cover room remodeling and an interior wall and door; 2026 filings describe electrical work and two temporary spaces for the show. The 2026 permits refer to the annual Kips Bay show.
Summarized from City of Dallas records · updated Oct 7, 2026
- Projects
- 7
- 7 filings
- Latest filing
- Oct 7, 2026
- since Sep 22, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
7 projects2999 turtle creek -these are partitions walls that will be removed at end of show create 2 new spaces in existing interior for upcoming annual design show. only framing and electric is needed. space 20 = 100'space 21 = 100
2999 turtle creek -these are partitions walls that will be removed at end of show create 2 new spaces in existing interior for upcoming annual design show. only framing and electric is needed. space 20 = 100'space 21 = 100
City of Dallas permitCommercial Alteration Addition PermitPermit for 2999 turtle creek blvd to replace the shower mixing valve, shower pan liner, toilet and lavatory for bathroom that is on the 2nd floor left side of the rotunda. room #20
Permit for 2999 turtle creek blvd to replace the shower mixing valve, shower pan liner, toilet and lavatory for bathroom that is on the 2nd floor left side of the rotunda. room #20
City of Dallas permitCommercial Plumbing Permit
Sources: City of Dallas
Questions about 2999 Turtle Creek Blvd
What is being built at 2999 Turtle Creek Blvd?
Permits describe interior changes for an annual design show, including temporary partitions, electrical work, and two new spaces within the existing interior. The 2026 filings refer to the annual Kips Bay show.
When were permits filed for work at 2999 Turtle Creek Blvd?
The earliest listed permit was filed September 22, 2025. The latest listed filing was October 7, 2026.
Are the new walls at 2999 Turtle Creek permanent?
A permit filed October 7, 2026, says the partition walls will be removed at the end of the show. It describes framing and electrical work for two spaces in the existing interior.
Is a new business opening at 2999 Turtle Creek?
The available permits describe interior work for an annual design show, not a new business opening. They do not identify a tenant.
What's changing near Analysis Group - Restrooms at 2911 Turtle Creek Boulevard?
At 2999 Turtle Creek Blvd, permits describe interior alterations and electrical work for an annual design show. The Analysis Group restroom listing is at 2911 Turtle Creek Boulevard, a separate address.
Also being built nearby
All of 75219- 2911 Turtle Creek Boulevard 7th · Piedmont Park Place, LPJun 30, 2026Analysis group - restrooms — renovation/alteration — renovation of existing restrooms · 19 m away
- 2911 Turtle Creek Boulevard · Piedmont Office Realty TrustJan 23, 2025Pcb turtle creek - 13th floor — new construction — partial renovation of a second generation interior office space (2,327sf). work includes general construction and modifications to existing mep systems · 19 m away
- 2911 Turtle Creek Blvd. 4th · Piedmont Realty TrustSep 4, 20264th floor restrooms and corridor — renovation/alteration — capital improvement · 19 m away
- 2911 Turtle Creek Blvd · Piedmont Realty TrustOct 14, 2026Hvac demolition · 19 m away
- 2821 Turtle Creek BlvdNov 17, 2026Temporary stage for band · 117 m away
- 2555 Turtle Creek BlvdApr 13, 2026Backflow 6" new plumbing · 128 m away
- 3000 Turtle Creek BlvdAug 29, 2025Installing :11 track lights with 42 heads11 tree lights22 dedicated duplex outlets13 dmx lighting outlets2 quad outlets5 fan power boxes 480v 3p 30 amp12 poke thru devices2 floor boxes5 outdoor pedestal av boxes35 new 20-amp circuitslighting controls and dmx controls for stage lighting · 132 m away
- 3000 Turtle Creek BlvdSep 17, 2026Replace rpz · 132 m away
- 2801 Turtle Creek BlvdOct 16, 2026Complete demolition and remodel. demolition to the shell of the unit and build back. all new hvac, plumbing, mechanical, framing, drywall, millwork, cabinets, countertops, tile, fire detection, water detection, security, etc. demolition balcony to the structural slab, new waterproofing, new tile flooring, some new electrical outside, etc · 137 m away
- 3082 Turtle Creek BlvdJun 4, 2026Installation of underground conduit to power wayfinding kiosk · 174 m away
- 2525 Turtle Creek BlvdSep 14, 2026Level 14: new construction of 20-story assisted living building with 2 levels of underground parking. 2505 turtle creek · 189 m away
- 3399 Bowen StJun 2, 2026Installation of underground conduit to power wayfinding kiosk · 230 m away