11506 Newberry St
Dallas, TX 75229
Electrical inspection requested at 11506 Newberry St
A City of Dallas commercial electrical permit records an inspection request at 11506 Newberry St due to a manual meter. The permit was filed on March 13, 2026; the record does not describe new construction or a change in use.
Summarized from City of Dallas records · updated Mar 13, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Mar 13, 2026
- since Mar 13, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 11506 Newberry St
What is happening at 11506 Newberry St in Dallas?
A City of Dallas permit records an inspection request related to a manual meter. The filing does not describe a construction project.
Is anything new being built at 11506 Newberry St?
The March 13, 2026 permit describes an inspection request due to a manual meter, not new construction.
What does permit COM-ELC-26-001129 cover?
The City of Dallas commercial electrical permit records an inspection request due to a manual meter. It was filed on March 13, 2026.
When was the electrical permit filed for 11506 Newberry St?
The City of Dallas filing date for permit COM-ELC-26-001129 is March 13, 2026.
Is a business opening at 11506 Newberry St?
The available permit record does not identify a business opening. It describes an inspection request due to a manual meter.
Also being built nearby
All of 75229- 11453 Newkirk StSep 15, 2025Workshop · 253 m away
- 2222 Crown RdOct 7, 2026Demolition 1 story pier and beam house · 260 m away
- 11454 Newkirk StSep 29, 2020Temporary pole or service · 282 m away
- 2141 Cindy LnNov 1, 2026Repaired gas system · 287 m away
- 11641 Newberry St · 635 Exchange Building AOct 13, 2025635 exchange spec suite - building a — renovation/alteration — this project consists of a 3.093 sq ft spec office located in a warehouse building. the project consists of office space, conference room, workspace, janitor closet, it closet, and (4) restrooms · 316 m away
- 11641 Newberry StJun 29, 2026Plumbing in warehouse building · 316 m away
- 11645 Newberry St · Pr III/Cre 635 Exchange Holdings, LPOct 17, 2024635 exchange [newberry (tree farm)] — new construction — three new warehouses / office buildings totalling approximately 595,688 sq ft on 36.29 ac site, at the intersection of i635 (lyndon b johnson fwy) & newberry st · 331 m away
- 11625 Columbia Center DrDec 7, 2020Install high-pile storage rack system · 347 m away
- 11519 Goodnight LnDec 22, 2025Gas test · 372 m away
- 2230 Lyndon B Johnson Fwy · Prologis, Inc.Jul 30, 2025Architectural surfaces - will call and rrs — renovation/alteration — alteration of existing interior warehouse space · 542 m away
- 2230 L B J FwyOct 5, 2026Bu zo adding addition office space within existing building. framing, electrical, drywall and fire suppression · 542 m away
- 2350 Alberta DrOct 29, 2026Replace one existing 25-ton carrier packaged rooftop hvac unit at floor & decor store #104, located at 2350 alberta drive, dallas, tx 75229, with one owner-furnished carrier 25-ton packaged gas/electric rooftop unit, model 48feem28k5m6-3m4c0. new equipment is rated 460 volts, three-phase, 60 hz, with r-454b refrigerant and gas heating input of 310,000 btu/hr.work includes disconnecting existing electrical, gas, controls, condensate, and duct connections; recovering refrigerant from the removed equipment; and providing crane and rigging services to remove the existing unit and set the replacement in the same rooftop location. reconnect existing supply and return ductwork, electrical power, gas piping, condensate drainage, and controls, with connection adjustments and sealing as necessary for the replacement equipment.complete manufacturer-required startup and verify cooling, gas heating, airflow, condensate drainage, economizer operation, smoke-detector shutdown, and factory refrigerant leak detection and mitigation controls. test disturbed gas connections for leaks and secure and weather-seal equipment connections.this is a like-for-like replacement with no increase in cooling capacity or change in heating type, voltage, or phase. existing electrical conductors and overcurrent protection have been verified for reuse; no service upgrades are proposed. work includes mechanical permitting and final inspection · 549 m away