11645 Newberry St
Dallas, TX 75229 · Pr III/Cre 635 Exchange Holdings, LP
Three warehouse-office buildings planned at 11645 Newberry St
Three new warehouse/office buildings totaling about 595,688 square feet are planned at 11645 Newberry St. The 635 Exchange project was registered with the Texas Department of Licensing and Regulation on October 17, 2024; its registration lists a 36.29-acre site and is marked Review Complete.
Summarized from Texas Department of Licensing and Regulation records · updated Oct 17, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Oct 17, 2024
- since Oct 17, 2024
- Largest scope
- 595,688 sf
- Estimated cost
- $24M
- state registration
Where this project stands
Finishing up · inspection next635 Exchange [Newberry (Tree Farm)]
595,688 sq ft · $24M est.
- RegisteredOct 17, 2024
- Plan review
- ConstructionAug '25 – May '26
- Inspectednow
- Closed
Scheduled to finish May 15, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectThree new warehouses / office buildings totalling approximately 595,688 sq ft on 36.29 ac site, at the intersection of i635 (lyndon b johnson fwy) & newberry st. — building a / b / c
TDLR project registrationNew ConstructionReview Complete595,688 sq ft$24M est.- Project #
- TABS2025003439
- Tenant / owner
- 635 Exchange [newberry (tree Farm)]
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 11645 Newberry St
What is being built at 11645 Newberry St in Dallas?
A TDLR project registration describes three new warehouse/office buildings, Buildings A, B and C, totaling about 595,688 square feet. The project is named 635 Exchange [Newberry (Tree Farm)].
When was the 635 Exchange project registered?
The project was registered on October 17, 2024, under TDLR number TABS2025003439. Its registration status is Review Complete.
How large is the 635 Exchange development?
The registration describes about 595,688 square feet of building space on a 36.29-acre site.
Is 635 Exchange near 635 Exchange Building A?
The project at 11645 Newberry St is listed about 15 meters from 635 Exchange Building A at 11641 Newberry St.
What is planned near Prologis on Lyndon B Johnson Freeway?
The 635 Exchange registration describes three warehouse/office buildings at the intersection of I-635 (Lyndon B Johnson Freeway) and Newberry Street. Prologis at 2230 Lyndon B Johnson Freeway is listed about 233 meters away.
Also being built nearby
All of 75229- 11641 Newberry StJun 29, 2026Plumbing in warehouse building · 15 m away
- 11641 Newberry St · 635 Exchange Building AOct 13, 2025635 exchange spec suite - building a — renovation/alteration — this project consists of a 3.093 sq ft spec office located in a warehouse building. the project consists of office space, conference room, workspace, janitor closet, it closet, and (4) restrooms · 15 m away
- 11625 Columbia Center DrDec 7, 2020Install high-pile storage rack system · 187 m away
- 2230 Lyndon B Johnson Fwy · Prologis, Inc.Jul 30, 2025Architectural surfaces - will call and rrs — renovation/alteration — alteration of existing interior warehouse space · 233 m away
- 2230 L B J FwyOct 5, 2026Bu zo adding addition office space within existing building. framing, electrical, drywall and fire suppression · 233 m away
- 11506 Newberry StMar 13, 2026Encore is requesting an inspection due to a manual meter · 331 m away
- 11519 Goodnight LnDec 22, 2025Gas test · 524 m away
- 2350 Alberta DrOct 29, 2026Replace one existing 25-ton carrier packaged rooftop hvac unit at floor & decor store #104, located at 2350 alberta drive, dallas, tx 75229, with one owner-furnished carrier 25-ton packaged gas/electric rooftop unit, model 48feem28k5m6-3m4c0. new equipment is rated 460 volts, three-phase, 60 hz, with r-454b refrigerant and gas heating input of 310,000 btu/hr.work includes disconnecting existing electrical, gas, controls, condensate, and duct connections; recovering refrigerant from the removed equipment; and providing crane and rigging services to remove the existing unit and set the replacement in the same rooftop location. reconnect existing supply and return ductwork, electrical power, gas piping, condensate drainage, and controls, with connection adjustments and sealing as necessary for the replacement equipment.complete manufacturer-required startup and verify cooling, gas heating, airflow, condensate drainage, economizer operation, smoke-detector shutdown, and factory refrigerant leak detection and mitigation controls. test disturbed gas connections for leaks and secure and weather-seal equipment connections.this is a like-for-like replacement with no increase in cooling capacity or change in heating type, voltage, or phase. existing electrical conductors and overcurrent protection have been verified for reuse; no service upgrades are proposed. work includes mechanical permitting and final inspection · 538 m away
- 11453 Newkirk StSep 15, 2025Workshop · 555 m away
- 2222 Crown RdOct 7, 2026Demolition 1 story pier and beam house · 577 m away
- 11454 Newkirk StSep 29, 2020Temporary pole or service · 593 m away
- 11927 Mustang RdOct 28, 2025Gas test to restore gas · 598 m away
More offices in 75229.