Office space addition permitted at existing Dallas building
A City of Dallas permit describes an addition of office space within an existing building at 2230 L B J Fwy. Filed October 5, 2026, permit COM-ALT-ADD-26-002434 lists framing, electrical, drywall and fire suppression work.
Summarized from City of Dallas records · updated Oct 5, 2026
- Projects
- 11
- 11 filings
- Latest filing
- Oct 5, 2026
- since Nov 12, 2020
- Largest scope
- —
- Listed value
- $36K
- partial · often understated
Permit & project history
11 projectsBu zo adding addition office space within existing building. framing, electrical, drywall and fire suppression
Bu zo adding addition office space within existing building. framing, electrical, drywall and fire suppression
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 2230 L B J Fwy
What is being built at 2230 L B J Fwy in Dallas?
A City of Dallas permit describes an addition of office space within an existing building. The listed work includes framing, electrical, drywall and fire suppression.
When was the office addition at 2230 L B J Fwy permitted?
The commercial alteration and addition permit was filed October 5, 2026. Its permit number is COM-ALT-ADD-26-002434.
Is this a new office building at 2230 L B J Fwy?
The permit describes office space being added within an existing building, not a new standalone building.
What work is included in the office addition permit?
The October 5, 2026 permit lists framing, electrical, drywall and fire suppression work for the office space addition.
Were there other permits filed at 2230 L B J Fwy?
Yes. City records also show three commercial plumbing permits for gas tests or gas relay and repair work, filed December 5 and 9, 2025, and February 23, 2026.
Also being built nearby
All of 75229- 2230 Lyndon B Johnson Fwy · Prologis, Inc.Jul 30, 2025Architectural surfaces - will call and rrs — renovation/alteration — alteration of existing interior warehouse space
- 11645 Newberry St · Pr III/Cre 635 Exchange Holdings, LPOct 17, 2024635 exchange [newberry (tree farm)] — new construction — three new warehouses / office buildings totalling approximately 595,688 sq ft on 36.29 ac site, at the intersection of i635 (lyndon b johnson fwy) & newberry st · 233 m away
- 11625 Columbia Center DrDec 7, 2020Install high-pile storage rack system · 240 m away
- 11641 Newberry StJun 29, 2026Plumbing in warehouse building · 246 m away
- 11641 Newberry St · 635 Exchange Building AOct 13, 2025635 exchange spec suite - building a — renovation/alteration — this project consists of a 3.093 sq ft spec office located in a warehouse building. the project consists of office space, conference room, workspace, janitor closet, it closet, and (4) restrooms · 246 m away
- 11927 Mustang RdOct 28, 2025Gas test to restore gas · 419 m away
- 11925 N Stemmons FwyOct 16, 2026Need meter released to have power turned on · 433 m away
- 2350 Alberta DrOct 29, 2026Replace one existing 25-ton carrier packaged rooftop hvac unit at floor & decor store #104, located at 2350 alberta drive, dallas, tx 75229, with one owner-furnished carrier 25-ton packaged gas/electric rooftop unit, model 48feem28k5m6-3m4c0. new equipment is rated 460 volts, three-phase, 60 hz, with r-454b refrigerant and gas heating input of 310,000 btu/hr.work includes disconnecting existing electrical, gas, controls, condensate, and duct connections; recovering refrigerant from the removed equipment; and providing crane and rigging services to remove the existing unit and set the replacement in the same rooftop location. reconnect existing supply and return ductwork, electrical power, gas piping, condensate drainage, and controls, with connection adjustments and sealing as necessary for the replacement equipment.complete manufacturer-required startup and verify cooling, gas heating, airflow, condensate drainage, economizer operation, smoke-detector shutdown, and factory refrigerant leak detection and mitigation controls. test disturbed gas connections for leaks and secure and weather-seal equipment connections.this is a like-for-like replacement with no increase in cooling capacity or change in heating type, voltage, or phase. existing electrical conductors and overcurrent protection have been verified for reuse; no service upgrades are proposed. work includes mechanical permitting and final inspection · 521 m away
- 11506 Newberry StMar 13, 2026Encore is requesting an inspection due to a manual meter · 542 m away