3509 Northaven Rd: 2 projects on record
City of Dallas lists 2 filings across 2 projects at 3509 Northaven Rd, Dallas, TX 75229. The most recent, filed November 17, 2026, covers: “Demolition house”.
Compiled from City of Dallas records · updated Nov 17, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Nov 17, 2026
- since Nov 17, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 3509 Northaven Rd
What is being built at 3509 Northaven Rd?
The latest filing (City of Dallas permit RES-DEM-26-001090, November 17, 2026) covers demolition house.
How many permits and filings does 3509 Northaven Rd have?
2 filings across 2 projects, from November 17, 2026 to November 17, 2026.
Is there other construction near 3509 Northaven Rd?
Yes. Nearby filings include 3510 Northaven Rd (replacing hvac system, Nov 13, 2026); 3524 Northaven Rd (no power, replace 125 amp meter base and riser, add 2 ground rods, Aug 7, 2025); 3506 Flair Dr (install new hvac, Nov 2, 2020).
How do I get alerts for new permits at 3509 Northaven Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75229- 3510 Northaven RdNov 13, 2026Replacing hvac system · 37 m away
- 3524 Northaven RdAug 7, 2025No power, replace 125 amp meter base and riser, add 2 ground rods · 47 m away
- 3506 Flair DrNov 2, 2020Install new hvac · 61 m away
- 3516 Flair DrOct 23, 2020Remove existing roof and install new roof · 62 m away
- 3524 Flair DrSep 1, 2026Gas yard line replacement · 66 m away
- 3507 Flair DrNov 16, 2026Nsfaa-new construction of a two-story single-family residence at 3507 flair drive, dallas, texas 75229. work includes construction of the complete structural foundation and framing system in accordance with the submitted engineered plans.the foundation consists of approximately 4,660 square feet of post-tensioned slab-on-grade construction with reinforced interior and exterior grade beams, required slab depressions, brick ledges, reinforcing steel, post-tension tendons, vapor/moisture barrier, and associated foundation details. subgrade preparation will include soil treatment and preparation as specified by the structural engineer before foundation placement.above-grade construction includes first- and second-story wood framing; exterior and interior load-bearing walls; engineered shear wall systems with required hold-downs, anchors, straps, blocking, and structural sheathing; wood floor and ceiling framing; engineered lvl and dimensional lumber beams and headers; floor trusses; joists; columns; and all associated structural connectors and hardware.roof construction includes the complete wood-framed roof system with rafters, roof beams, headers, hips, valleys, bracing, purlins, trusses where indicated, roof sheathing, and required structural connections. work also includes structural framing around stair openings, open-to-below areas, garage openings, wall openings, and other structural conditions shown on the approved plans · 74 m away
- 3531 Flair DrFeb 10, 2026Up to 15 · 85 m away
- 3550 Flair DrSep 8, 2025Coil and condenser · 97 m away
- 3541 Flair DrNov 17, 2025Replace complete system · 98 m away
- 3509 Whitehall DrOct 15, 2025207' 1x6x8 cedar board on board, 2 wood frame walk gates · 130 m away
- 3523 Whitehall DrAug 4, 2025Installation of 2 private residential ev charger tied into existing msp #6 cu, #8cu gnd, 3/4" emt or equivalent feeder conductors sized per: nec 625.21, 310.16 · 132 m away
- 3529 Whitehall DrJul 25, 2025Construct new 8' cedar wood fence · 135 m away