3550 Flair Dr
Dallas, TX 75229
3550 Flair Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 3550 Flair Dr, Dallas, TX 75229. The most recent, filed September 8, 2025, covers: “Coil and condenser”.
Compiled from City of Dallas records · updated Sep 8, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 8, 2025
- since Sep 8, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 3550 Flair Dr
What is being built at 3550 Flair Dr?
The latest filing (City of Dallas permit RES-MEC-25-002436, September 8, 2025) covers coil and condenser.
How many permits and filings does 3550 Flair Dr have?
1 filing across 1 project, from September 8, 2025 to September 8, 2025.
Is there other construction near 3550 Flair Dr?
Yes. Nearby filings include 3541 Flair Dr (replace complete system, Nov 17, 2025); 3531 Flair Dr (up to 15, Feb 10, 2026); 3524 Flair Dr (gas yard line replacement, Sep 1, 2026).
How do I get alerts for new permits at 3550 Flair Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75229- 3541 Flair DrNov 17, 2025Replace complete system · 17 m away
- 3531 Flair DrFeb 10, 2026Up to 15 · 35 m away
- 3524 Flair DrSep 1, 2026Gas yard line replacement · 50 m away
- 3516 Flair DrOct 23, 2020Remove existing roof and install new roof · 66 m away
- 3507 Flair DrNov 16, 2026Nsfaa-new construction of a two-story single-family residence at 3507 flair drive, dallas, texas 75229. work includes construction of the complete structural foundation and framing system in accordance with the submitted engineered plans.the foundation consists of approximately 4,660 square feet of post-tensioned slab-on-grade construction with reinforced interior and exterior grade beams, required slab depressions, brick ledges, reinforcing steel, post-tension tendons, vapor/moisture barrier, and associated foundation details. subgrade preparation will include soil treatment and preparation as specified by the structural engineer before foundation placement.above-grade construction includes first- and second-story wood framing; exterior and interior load-bearing walls; engineered shear wall systems with required hold-downs, anchors, straps, blocking, and structural sheathing; wood floor and ceiling framing; engineered lvl and dimensional lumber beams and headers; floor trusses; joists; columns; and all associated structural connectors and hardware.roof construction includes the complete wood-framed roof system with rafters, roof beams, headers, hips, valleys, bracing, purlins, trusses where indicated, roof sheathing, and required structural connections. work also includes structural framing around stair openings, open-to-below areas, garage openings, wall openings, and other structural conditions shown on the approved plans · 85 m away
- 3506 Flair DrNov 2, 2020Install new hvac · 85 m away
- 3524 Northaven RdAug 7, 2025No power, replace 125 amp meter base and riser, add 2 ground rods · 108 m away
- 3535 Orchard Ridge CtAug 25, 2026Replace meterbase, breaker box, add surge protector, add 2 groumd rods · 113 m away
- 3510 Northaven RdNov 13, 2026Replacing hvac system · 123 m away
- 11414 Cherry Ridge CtOct 20, 2026New plumbing sfd · 127 m away
- 11430 Cherry Ridge CtAug 2, 2026Gas test · 132 m away
- 3616 Flair DrAug 19, 2026Repair sewer line under slab foundation · 137 m away