3524 Flair Dr
Dallas, TX 75229
Gas yard line replacement permitted at 3524 Flair Dr
A residential permit indicates gas yard line replacement at 3524 Flair Dr in Dallas. The City of Dallas permit was filed September 1, 2026, under permit number RES-PLM-26-009257.
Summarized from City of Dallas records · updated Sep 1, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 1, 2026
- since Sep 1, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 3524 Flair Dr
What is being built at 3524 Flair Dr?
The City of Dallas permit record indicates gas yard line replacement, not a new building project. The residential plumbing permit was filed September 1, 2026.
What work is permitted at 3524 Flair Dr in Dallas?
Permit RES-PLM-26-009257 covers gas yard line replacement. It was filed with the City of Dallas on September 1, 2026.
Is a new home being built at 3524 Flair Dr?
The available permit record describes gas yard line replacement. It does not describe construction of a new home.
When was the gas line work at 3524 Flair Dr permitted?
The City of Dallas filed the residential plumbing permit on September 1, 2026.
What is permit RES-PLM-26-009257 for?
It is a City of Dallas residential plumbing permit for gas yard line replacement at 3524 Flair Dr.
Also being built nearby
All of 75229- 3516 Flair DrOct 23, 2020Remove existing roof and install new roof · 15 m away
- 3531 Flair DrFeb 10, 2026Up to 15 · 22 m away
- 3506 Flair DrNov 2, 2020Install new hvac · 35 m away
- 3507 Flair DrNov 16, 2026Nsfaa-new construction of a two-story single-family residence at 3507 flair drive, dallas, texas 75229. work includes construction of the complete structural foundation and framing system in accordance with the submitted engineered plans.the foundation consists of approximately 4,660 square feet of post-tensioned slab-on-grade construction with reinforced interior and exterior grade beams, required slab depressions, brick ledges, reinforcing steel, post-tension tendons, vapor/moisture barrier, and associated foundation details. subgrade preparation will include soil treatment and preparation as specified by the structural engineer before foundation placement.above-grade construction includes first- and second-story wood framing; exterior and interior load-bearing walls; engineered shear wall systems with required hold-downs, anchors, straps, blocking, and structural sheathing; wood floor and ceiling framing; engineered lvl and dimensional lumber beams and headers; floor trusses; joists; columns; and all associated structural connectors and hardware.roof construction includes the complete wood-framed roof system with rafters, roof beams, headers, hips, valleys, bracing, purlins, trusses where indicated, roof sheathing, and required structural connections. work also includes structural framing around stair openings, open-to-below areas, garage openings, wall openings, and other structural conditions shown on the approved plans · 36 m away
- 3541 Flair DrNov 17, 2025Replace complete system · 41 m away
- 3550 Flair DrSep 8, 2025Coil and condenser · 50 m away
- 3524 Northaven RdAug 7, 2025No power, replace 125 amp meter base and riser, add 2 ground rods · 97 m away
- 3510 Northaven RdNov 13, 2026Replacing hvac system · 100 m away
- 3535 Orchard Ridge CtAug 25, 2026Replace meterbase, breaker box, add surge protector, add 2 groumd rods · 100 m away
- 11414 Cherry Ridge CtOct 20, 2026New plumbing sfd · 177 m away
- 11430 Cherry Ridge CtAug 2, 2026Gas test · 180 m away
- 3616 Flair DrAug 19, 2026Repair sewer line under slab foundation · 187 m away