3535 Orchard Ridge Ct
Dallas, TX 75229
Electrical work and a gas test at 3535 Orchard Ridge Ct
City of Dallas permits indicate residential electrical work and a gas test at 3535 Orchard Ridge Ct, rather than a new building project. A plumbing permit for a gas test was filed Aug. 21, 2025, and an electrical permit for meter-base and breaker-box replacement was filed Aug. 25, 2026.
Summarized from City of Dallas records · updated Aug 25, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Aug 25, 2026
- since Aug 21, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 3535 Orchard Ridge Ct
What is happening at 3535 Orchard Ridge Ct?
City of Dallas records show a residential gas-test permit filed Aug. 21, 2025, and a residential electrical permit filed Aug. 25, 2026.
Is a new house being built at 3535 Orchard Ridge Ct?
The listed permits cover a gas test and electrical work. They do not describe new home construction.
What electrical work is permitted at 3535 Orchard Ridge Ct?
Permit RES-ELC-26-005144, filed Aug. 25, 2026, describes replacing the meter base and breaker box, adding a surge protector, and adding two ground rods.
Was plumbing work permitted at 3535 Orchard Ridge Ct?
Yes. Residential Plumbing Permit RES-PLM-25-003761, filed Aug. 21, 2025, describes a gas test.
When was the latest permit filed for 3535 Orchard Ridge Ct?
The latest listed permit was filed Aug. 25, 2026. It covers residential electrical work.
Also being built nearby
All of 75229- 3531 Flair DrFeb 10, 2026Up to 15 · 90 m away
- 3507 Flair DrNov 16, 2026Nsfaa-new construction of a two-story single-family residence at 3507 flair drive, dallas, texas 75229. work includes construction of the complete structural foundation and framing system in accordance with the submitted engineered plans.the foundation consists of approximately 4,660 square feet of post-tensioned slab-on-grade construction with reinforced interior and exterior grade beams, required slab depressions, brick ledges, reinforcing steel, post-tension tendons, vapor/moisture barrier, and associated foundation details. subgrade preparation will include soil treatment and preparation as specified by the structural engineer before foundation placement.above-grade construction includes first- and second-story wood framing; exterior and interior load-bearing walls; engineered shear wall systems with required hold-downs, anchors, straps, blocking, and structural sheathing; wood floor and ceiling framing; engineered lvl and dimensional lumber beams and headers; floor trusses; joists; columns; and all associated structural connectors and hardware.roof construction includes the complete wood-framed roof system with rafters, roof beams, headers, hips, valleys, bracing, purlins, trusses where indicated, roof sheathing, and required structural connections. work also includes structural framing around stair openings, open-to-below areas, garage openings, wall openings, and other structural conditions shown on the approved plans · 93 m away
- 3541 Flair DrNov 17, 2025Replace complete system · 96 m away
- 3524 Flair DrSep 1, 2026Gas yard line replacement · 100 m away
- 3516 Flair DrOct 23, 2020Remove existing roof and install new roof · 101 m away
- 3506 Flair DrNov 2, 2020Install new hvac · 106 m away
- 3550 Flair DrSep 8, 2025Coil and condenser · 113 m away
- 3620 Pallos Verdas DrJun 11, 2026Repair break on sewer line via 5' tunnel · 123 m away
- 11504 Sonnet DrNov 18, 2026First tunnel: replaced the 2-inch and 3-inch sewer lines serving the tub, and toiletsecond tunnel: accessed the sewer line from the opposite side of the home near the front of the house. repaired the tub drain and lavatory drain connections · 128 m away
- 11505 Sonnet DrMay 13, 2025Foundation repair-install 11 piers · 148 m away
- 3632 Pallos Verdas DrSep 23, 2026Replace 4" thick driveway and 6"approach · 154 m away
- 3509 Northaven RdNov 17, 2026Demolition house · 163 m away