3541 Flair Dr
Dallas, TX 75229
Mechanical system replacement at 3541 Flair Dr
A residential mechanical system replacement is indicated by a Dallas permit filed November 17, 2025. The permit description says “Replace complete system” and does not provide a project value or square footage.
Summarized from City of Dallas records · updated Nov 17, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Nov 17, 2025
- since Nov 17, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 3541 Flair Dr
What work is permitted at 3541 Flair Dr?
A City of Dallas residential mechanical permit indicates a complete system replacement. It was filed November 17, 2025, under permit RES-MEC-25-003654.
When was the mechanical permit filed for 3541 Flair Dr?
The City of Dallas filed residential mechanical permit RES-MEC-25-003654 on November 17, 2025.
Is a new house being built at 3541 Flair Dr?
The available permit describes a complete system replacement, not new home construction.
How much will the work at 3541 Flair Dr cost?
The available permit record does not list a project cost.
Were there other permits for 3541 Flair Dr?
A plumbing alteration permit filed January 3, 2020, describes gas relay or repair with test. A residential mechanical permit for a complete system replacement was filed November 17, 2025.
Also being built nearby
All of 75229- 3550 Flair DrSep 8, 2025Coil and condenser · 17 m away
- 3531 Flair DrFeb 10, 2026Up to 15 · 21 m away
- 3524 Flair DrSep 1, 2026Gas yard line replacement · 41 m away
- 3516 Flair DrOct 23, 2020Remove existing roof and install new roof · 56 m away
- 3507 Flair DrNov 16, 2026Nsfaa-new construction of a two-story single-family residence at 3507 flair drive, dallas, texas 75229. work includes construction of the complete structural foundation and framing system in accordance with the submitted engineered plans.the foundation consists of approximately 4,660 square feet of post-tensioned slab-on-grade construction with reinforced interior and exterior grade beams, required slab depressions, brick ledges, reinforcing steel, post-tension tendons, vapor/moisture barrier, and associated foundation details. subgrade preparation will include soil treatment and preparation as specified by the structural engineer before foundation placement.above-grade construction includes first- and second-story wood framing; exterior and interior load-bearing walls; engineered shear wall systems with required hold-downs, anchors, straps, blocking, and structural sheathing; wood floor and ceiling framing; engineered lvl and dimensional lumber beams and headers; floor trusses; joists; columns; and all associated structural connectors and hardware.roof construction includes the complete wood-framed roof system with rafters, roof beams, headers, hips, valleys, bracing, purlins, trusses where indicated, roof sheathing, and required structural connections. work also includes structural framing around stair openings, open-to-below areas, garage openings, wall openings, and other structural conditions shown on the approved plans · 72 m away
- 3506 Flair DrNov 2, 2020Install new hvac · 75 m away
- 3535 Orchard Ridge CtAug 25, 2026Replace meterbase, breaker box, add surge protector, add 2 groumd rods · 96 m away
- 3509 Northaven RdNov 17, 2026Demolition house · 98 m away
- 3524 Northaven RdAug 7, 2025No power, replace 125 amp meter base and riser, add 2 ground rods · 115 m away
- 3510 Northaven RdNov 13, 2026Replacing hvac system · 127 m away
- 11414 Cherry Ridge CtOct 20, 2026New plumbing sfd · 137 m away
- 11430 Cherry Ridge CtAug 2, 2026Gas test · 139 m away