6523 Abrams Rd
Dallas, TX 75231
Power release requested for existing commercial space on Abrams Road
A City of Dallas permit filed November 20, 2025, requests a power release for existing commercial space at 6523 Abrams Road. The permit description says no electrical work will be performed and the space will be shown as-is.
Summarized from City of Dallas records · updated Nov 20, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Nov 20, 2025
- since Nov 20, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectRequesting power release for existing commercial space. no electrical work performed. clean & show (as-is)
Requesting power release for existing commercial space. no electrical work performed. clean & show (as-is)
City of Dallas permitCommercial Electrical Permit
Sources: City of Dallas
Questions about 6523 Abrams Rd
What is being built at 6523 Abrams Road?
The permit does not describe new construction. It requests a power release for existing commercial space, with no electrical work planned.
What does the permit for 6523 Abrams Road cover?
City of Dallas permit COM-ELC-25-003281 requests a power release for existing commercial space. Its description says the space will be shown as-is.
When was the permit filed for 6523 Abrams Road?
The City of Dallas permit was filed on November 20, 2025.
Is there electrical work planned at 6523 Abrams Road?
The permit description says no electrical work will be performed; it requests a power release for the existing space.
Is a new business opening at 6523 Abrams Road?
The permit record does not name a business or say that one is opening. It describes a power release request and an as-is showing of the existing commercial space.
Also being built nearby
All of 75231- 6515 Abrams RdJun 30, 2025Tap into lighting circuit to power an ex fan. label panel · 10 m away
- 6510 Abrams RdAug 24, 2026Make safe from demolition, tie in existing lights. new outlet in new office · 27 m away
- 6419 Skillman SreetJun 20, 2025Tesla - dallas, tx - skillman — new construction — electrical infrastructure · 166 m away
- 6419 Skillman StSep 21, 2026Drive approach replacement · 166 m away
- 6300 Skillman StOct 22, 2026Remove and replace two 15ton package units with like for like replacements · 173 m away
- 6409 Larmanda StAug 3, 2026Tear out only marked in yellow install new 8' tall cedar board on board marked in red along side and back of property post set 24" deep in concrete and at 6' centers no gates · 186 m away
- 6953 Kingsbury DrDec 1, 2020Replace or modify existing hvac · 202 m away
- 6941 Kingsbury DrApr 9, 2026Replacing cast iron under the home · 205 m away
- 7009 Kingsbury DrAug 5, 2025Replaced federal pacific panel & disconnect with up to code electrical panel · 208 m away
- 6935 Kingsbury DrAug 24, 2026Re-roof home - no structural changes will be made. the current roofing system will be removed to the deck. if there are any issues in the deck, we'll repair them. like materials and color will be reinstalled · 207 m away
- 6929 Kingsbury DrJul 14, 2026Move water line in wall 6-8" and install new shower valve · 210 m away
- 7023 Kingsbury DrAug 31, 2026Complete electrical service change for both dwelling units of a two-family duplex at 7021 and 7023 kingsbury dr. each unit is currently served by a 150 amp fused service with a federal pacific stab-lok load center located in a clothes closet. the scope below is performed twice, once per dwelling unit.service, 2 required: remove the existing fused service disconnect and obsolete meter socket at each unit. install two new service masts of 2 inch rigid metal conduit with weatherhead, point of attachment hardware, and roof flashing, connected to the existing overhead service drop. install new 2/0 copper service entrance conductors, three conductors per unit. install two new 200 amp ringless meter-main combinations (square d rc200s with 200 amp main breaker), one per unit, on the exterior rear wall, each set within the utility required meter height and each serving as the service disconnecting means for its own unit. each marked per nec 230.85. each meter socket permanently identified with its unit address per utility requirements for multi-metered locations.load centers, 2 required: remove both existing federal pacific stab-lok load centers from clothes closets. install two new 42 space main lug load centers, 225 amp bus, one per unit, at code compliant locations. each supplied by a 200 amp feeder of 4/0 aluminum ser, approximately 60 feet per unit, from that unit's service disconnect. each existing panel enclosure to be retained as an accessible junction box with blank cover. existing branch circuits to be spliced and extended to the new load center, then identified and labeled with a circuit directory per nec 408.4(a). approximately 18 branch circuits per unit.grounding and bonding, 2 required: new grounding electrode system at each unit consisting of two 8 foot driven ground rods, #4 bare copper grounding electrode conductor sized per nec 250.66, water pipe bond, and intersystem bonding termination. each load center neutral isolated from equipment ground per nec 250.24 and 250.142.other: install a whole panel surge protective device at each load center per nec 230.67. install branch circuit overcurrent devices. coordinate meter removal and reset with oncor for both meters.existing branch circuit conductors remain in place. no branch circuit rewiring is included in this scope · 218 m away