6419 Skillman Sreet
Dallas, TX 75231
Tesla-named electrical project registered on Skillman
A 2,000-square-foot new-construction electrical infrastructure project listed as “Tesla - Dallas, TX - Skillman” was registered on June 20, 2025. The TDLR record lists an estimated project cost of $180,000 and a status of Review Complete.
Summarized from Texas Department of Licensing and Regulation records · updated Jun 20, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 20, 2025
- since Jun 20, 2025
- Largest scope
- 2,000 sf
- Estimated cost
- $180K
- state registration
Where this project stands
Finishing up · inspection nextTesla - Dallas, TX - Skillman
2,000 sq ft · $180K est.
- RegisteredJun 20, 2025
- Plan review
- ConstructionJul '25 – Jul '26
- Inspectednow
- Closed
Scheduled to finish Jul 31, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectElectrical infrastructure — tesla
TDLR project registrationNew ConstructionReview Complete2,000 sq ft$180K est.- Project #
- TABS2025021703
- Tenant / owner
- Pro
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 6419 Skillman Sreet
What is being built at 6419 Skillman Street?
A TDLR registration describes a 2,000-square-foot new-construction electrical infrastructure project named “Tesla - Dallas, TX - Skillman.” It does not specify a building use or tenant.
Is Tesla opening at 6419 Skillman Street in Dallas?
The TDLR record names the project “Tesla - Dallas, TX - Skillman” and describes electrical infrastructure. It does not confirm that a Tesla location is opening there.
When was the Skillman project registered?
The TDLR project registration, TABS2025021703, was filed on June 20, 2025.
How large is the project at 6419 Skillman Street?
The TDLR registration lists the project at 2,000 square feet.
How much will the electrical infrastructure project cost?
The applicant’s TDLR estimate is $180,000. This is an estimate for the project, not a confirmed final cost.
What is the status of the Skillman project?
The TDLR record lists the status as Review Complete.
Also being built nearby
All of 75231- 6419 Skillman StSep 21, 2026Drive approach replacement
- 6523 Abrams RdNov 20, 2025Requesting power release for existing commercial space. no electrical work performed. clean & show (as-is) · 166 m away
- 6515 Abrams RdJun 30, 2025Tap into lighting circuit to power an ex fan. label panel · 173 m away
- 6510 Abrams RdAug 24, 2026Make safe from demolition, tie in existing lights. new outlet in new office · 188 m away
- 6300 Skillman StOct 22, 2026Remove and replace two 15ton package units with like for like replacements · 199 m away
- 6506 Skillman StSep 23, 2026Interior renovation for restaraunt includes kitchen & restrooms · 229 m away
- 6500 Skillman StAug 18, 2026Bathroom addition to existing plumbing toilet, floor drain, and lavatory. pull existing fixtures in place and install new in same locations. four toilets, three lavatories · 245 m away
- 6731 Larmanda StJul 28, 2026Replacement of air conditioning and heating units · 251 m away
- 6508 Skillman StJun 27, 2025Repairing of the existing electrical disconnect · 275 m away
- 6409 Larmanda StAug 3, 2026Tear out only marked in yellow install new 8' tall cedar board on board marked in red along side and back of property post set 24" deep in concrete and at 6' centers no gates · 344 m away
- 6401 Abrams RdOct 6, 2025Removing and replacing damaged wireway · 349 m away
- 6750 Abrams RdOct 16, 2020Erect attached sign · 351 m away