7810 Kilbride Ln
Dallas, TX 75248
39 rooftop solar panels and two batteries permitted
A City of Dallas permit filed July 10, 2025, indicates installation of 39 rooftop solar panels and two batteries at 7810 Kilbride Ln. A separate electrical service permit for the home was filed December 31, 2019.
Summarized from City of Dallas records · updated Jul 10, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Jul 10, 2025
- since Jul 10, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 7810 Kilbride Ln
What is being installed at 7810 Kilbride Ln?
A City of Dallas permit describes installation of 39 rooftop solar panels and two batteries. The permit is RES-SOLAR-25-000200, filed July 10, 2025.
When was the solar permit filed for 7810 Kilbride Ln?
The City of Dallas filed permit RES-SOLAR-25-000200 on July 10, 2025.
How many solar panels are planned at 7810 Kilbride Ln?
The permit description lists 39 rooftop solar panels.
Are batteries included in the solar installation at 7810 Kilbride Ln?
Yes. The permit description includes two batteries along with the 39 rooftop solar panels.
What other permits are listed for 7810 Kilbride Ln?
A City of Dallas electrical permit for permanent electrical service was filed on December 31, 2019. Its permit number is 1912313003.
Also being built nearby
All of 75248- 7808 Kilbride LnJun 1, 20264 ton carrier complete systemhvac replacement · 4 m away
- 7819 Kilbride LnApr 22, 2026Installed 1 50 gallon gas water heater in hallway closet · 14 m away
- 7818 Kilbride LnNov 12, 2026We will be adding 22 sq ft to the master bathroom to enlarge the master closet and add a free-standing bathtub and sauna · 18 m away
- 7811 Kilbride LnNov 16, 2026Gas repair with test · 18 m away
- 7704 Kilbride CirJul 20, 2026Sewer repipe · 63 m away
- 7702 Kilbride CirApr 13, 2026Foundation repair-install 15 piers · 64 m away
- 7701 Kilbride CirJul 22, 2026Under slab sewer repipe · 71 m away
- 7801 Kilbride LnOct 5, 2026Under-slab waterline repair by tunnelingion plumbing will pull permit with city of dallas before starting job.ion plumbing will excavate an access point on right side of home and tunnel approximately 13ft underneath the home to access the damaged waterline located beneath the concrete slab.once the affected piping is exposed, ion plumbing will cut out and remove the damaged section of waterline and install new piping and necessary fittings to complete the repair.once repairs are complete, technicians will pressure-test the waterline to verify the repair is holding and that no leaks are present. the tunnel will then be backfilled upon completion of the repair.this estimate includes tunneling only 13ft and repair of the identified leaking waterline only. any unforeseen obstacles outside the original scope will be discussed with the customer and approved before proceeding.ion plumbing will have an engineer report done once backfill is complete · 117 m away
- 16318 Fallkirk DrJun 22, 202650 electric water heater in outside closet reroute water line overhead · 119 m away
- 16306 Fallkirk DrJul 14, 2025Mcrbat 16306 fallkirk dr - for the installation of 34 rooftop solar panels and 2 batteries · 131 m away
- 16321 Fallkirk DrJul 17, 2026Replacing 3 ton complete system · 131 m away
- 16311 Fallkirk DrJun 9, 2026Repair/replace gas line in home and place on test · 152 m away
More solar installs in 75248.