7818 Kilbride Ln
Dallas, TX 75248
Bathroom addition and sauna planned at 7818 Kilbride Ln
Dallas permits indicate a master bathroom addition at 7818 Kilbride Ln to enlarge the master closet and add a freestanding tub and sauna. An alteration permit was filed October 30, 2026, followed by an electrical permit on November 12, 2026.
Summarized from City of Dallas records · updated Nov 12, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Nov 12, 2026
- since Oct 30, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsWe will be adding 22 sq ft to the master bathroom to enlarge the master closet and add a free-standing bathtub and sauna
We will be adding 22 sq ft to the master bathroom to enlarge the master closet and add a free-standing bathtub and sauna
City of Dallas permitResidential Electrical PermitNsfaa-we will be adding 222 sq ft to the master bathroom to enlarge the master closet and add a free standing tub and sauna
Nsfaa-we will be adding 222 sq ft to the master bathroom to enlarge the master closet and add a free standing tub and sauna
City of Dallas permitResidential Alteration Addition Permit
Sources: City of Dallas
Questions about 7818 Kilbride Ln
What is being built at 7818 Kilbride Ln?
Dallas permit records describe an addition to the master bathroom to enlarge the master closet and add a freestanding tub and sauna. The alteration permit, RES-ALT-ADD-26-001962, was filed October 30, 2026.
Is a sauna being added at 7818 Kilbride Ln?
The October 30, 2026, alteration permit describes adding a sauna as part of a master bathroom addition.
Is a new bathtub planned for 7818 Kilbride Ln?
The alteration permit describes adding a freestanding tub to the master bathroom. It was filed October 30, 2026.
How large is the bathroom addition at 7818 Kilbride Ln?
The alteration permit description says 222 square feet. A later electrical permit description refers to 22 square feet, so the records give different figures.
What electrical work is permitted at 7818 Kilbride Ln?
A residential electrical permit, RES-ELC-26-007015, was filed November 12, 2026. Its description refers to the master bathroom addition, closet enlargement, freestanding tub, and sauna.
When were permits filed for work at 7818 Kilbride Ln?
The alteration permit was filed October 30, 2026, and the electrical permit was filed November 12, 2026.
Also being built nearby
All of 75248- 7819 Kilbride LnApr 22, 2026Installed 1 50 gallon gas water heater in hallway closet · 17 m away
- 7810 Kilbride LnJul 10, 2025Mcrbat for the installation of 39 rooftop solar panels with 2 batteries · 18 m away
- 7808 Kilbride LnJun 1, 20264 ton carrier complete systemhvac replacement · 22 m away
- 7811 Kilbride LnNov 16, 2026Gas repair with test · 33 m away
- 7704 Kilbride CirJul 20, 2026Sewer repipe · 72 m away
- 7702 Kilbride CirApr 13, 2026Foundation repair-install 15 piers · 73 m away
- 7701 Kilbride CirJul 22, 2026Under slab sewer repipe · 81 m away
- 16318 Fallkirk DrJun 22, 202650 electric water heater in outside closet reroute water line overhead · 113 m away
- 16321 Fallkirk DrJul 17, 2026Replacing 3 ton complete system · 120 m away
- 16306 Fallkirk DrJul 14, 2025Mcrbat 16306 fallkirk dr - for the installation of 34 rooftop solar panels and 2 batteries · 122 m away
- 7801 Kilbride LnOct 5, 2026Under-slab waterline repair by tunnelingion plumbing will pull permit with city of dallas before starting job.ion plumbing will excavate an access point on right side of home and tunnel approximately 13ft underneath the home to access the damaged waterline located beneath the concrete slab.once the affected piping is exposed, ion plumbing will cut out and remove the damaged section of waterline and install new piping and necessary fittings to complete the repair.once repairs are complete, technicians will pressure-test the waterline to verify the repair is holding and that no leaks are present. the tunnel will then be backfilled upon completion of the repair.this estimate includes tunneling only 13ft and repair of the identified leaking waterline only. any unforeseen obstacles outside the original scope will be discussed with the customer and approved before proceeding.ion plumbing will have an engineer report done once backfill is complete · 135 m away
- 16311 Fallkirk DrJun 9, 2026Repair/replace gas line in home and place on test · 139 m away