Recent · latest filing Apr 2026Residential
7702 Kilbride Cir
Dallas, TX 75248
Foundation repair with 15 piers at 7702 Kilbride Cir
A residential foundation repair project at 7702 Kilbride Cir calls for installing 15 piers. The City of Dallas permit was filed on April 13, 2026.
Summarized from City of Dallas records · updated Apr 13, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Apr 13, 2026
- since Apr 13, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 7702 Kilbride Cir
What is being built at 7702 Kilbride Cir?
A City of Dallas permit describes residential foundation repair involving the installation of 15 piers.
When was the foundation repair permitted?
The permit was filed on April 13, 2026.
What is the permit number for 7702 Kilbride Cir?
The City of Dallas permit number is RES-FDN-26-000309, filed April 13, 2026.
How many piers are planned at 7702 Kilbride Cir?
The permit description says the foundation repair will install 15 piers.
Is the project at 7702 Kilbride Cir residential or commercial?
The permit categorizes the work as residential foundation repair.
Also being built nearby
All of 75248- 7704 Kilbride CirJul 20, 2026Sewer repipe · 1 m away
- 7701 Kilbride CirJul 22, 2026Under slab sewer repipe · 13 m away
- 7808 Kilbride LnJun 1, 20264 ton carrier complete systemhvac replacement · 62 m away
- 7810 Kilbride LnJul 10, 2025Mcrbat for the installation of 39 rooftop solar panels with 2 batteries · 64 m away
- 7818 Kilbride LnNov 12, 2026We will be adding 22 sq ft to the master bathroom to enlarge the master closet and add a free-standing bathtub and sauna · 73 m away
- 7811 Kilbride LnNov 16, 2026Gas repair with test · 73 m away
- 7819 Kilbride LnApr 22, 2026Installed 1 50 gallon gas water heater in hallway closet · 78 m away
- 7815 Glenneagle DrFeb 6, 2026Sewer repair · 106 m away
- 7811 Glenneagle DrApr 20, 2026Driveway and approach will be both removed and replaced with new concrete we will be braking apart and hauling away concrete to a dump site " big city crushed concrete" we will also be regrading and making sure all grade is how its supposed to be as plans and all rebar is to specs and placed properly before pouring as well as forms making sure all forms are set to proper elevation also we will adding proper base rock for base and making sure its properly compacted · 109 m away
- 7807 Glenneagle DrApr 1, 2026Gas test for meter release · 114 m away
- 7801 Kilbride LnOct 5, 2026Under-slab waterline repair by tunnelingion plumbing will pull permit with city of dallas before starting job.ion plumbing will excavate an access point on right side of home and tunnel approximately 13ft underneath the home to access the damaged waterline located beneath the concrete slab.once the affected piping is exposed, ion plumbing will cut out and remove the damaged section of waterline and install new piping and necessary fittings to complete the repair.once repairs are complete, technicians will pressure-test the waterline to verify the repair is holding and that no leaks are present. the tunnel will then be backfilled upon completion of the repair.this estimate includes tunneling only 13ft and repair of the identified leaking waterline only. any unforeseen obstacles outside the original scope will be discussed with the customer and approved before proceeding.ion plumbing will have an engineer report done once backfill is complete · 118 m away
- 7812 Glenneagle DrSep 17, 2026Installing 8 total piers · 120 m away