Foundation repair planned at 7811 Kilbride Ln
A City of Dallas permit filed June 9, 2026, covers installing 20 concrete pilings to stabilize the foundation at 7811 Kilbride Ln. The record lists the work as residential foundation repair.
Summarized from City of Dallas records · updated Nov 16, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Nov 16, 2026
- since Nov 16, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 7811 Kilbride Ln
What work is permitted at 7811 Kilbride Ln?
A City of Dallas permit covers installing 20 concrete pilings to stabilize the foundation. The work is listed as residential foundation repair.
Is a new house being built at 7811 Kilbride Ln?
The available permit record describes foundation stabilization, not construction of a new house.
When was the foundation repair permit filed?
The City of Dallas permit was filed June 9, 2026.
What is the permit number for 7811 Kilbride Ln?
The permit number is RES-FDN-26-000468. It was filed June 9, 2026.
How many concrete pilings are planned at 7811 Kilbride Ln?
The permit description says 20 concrete pilings will be installed to stabilize the foundation.
Also being built nearby
All of 75248- 7808 Kilbride LnJun 1, 20264 ton carrier complete systemhvac replacement · 15 m away
- 7810 Kilbride LnJul 10, 2025Mcrbat for the installation of 39 rooftop solar panels with 2 batteries · 18 m away
- 7819 Kilbride LnApr 22, 2026Installed 1 50 gallon gas water heater in hallway closet · 19 m away
- 7818 Kilbride LnNov 12, 2026We will be adding 22 sq ft to the master bathroom to enlarge the master closet and add a free-standing bathtub and sauna · 33 m away
- 7704 Kilbride CirJul 20, 2026Sewer repipe · 72 m away
- 7702 Kilbride CirApr 13, 2026Foundation repair-install 15 piers · 73 m away
- 7701 Kilbride CirJul 22, 2026Under slab sewer repipe · 77 m away
- 7801 Kilbride LnOct 5, 2026Under-slab waterline repair by tunnelingion plumbing will pull permit with city of dallas before starting job.ion plumbing will excavate an access point on right side of home and tunnel approximately 13ft underneath the home to access the damaged waterline located beneath the concrete slab.once the affected piping is exposed, ion plumbing will cut out and remove the damaged section of waterline and install new piping and necessary fittings to complete the repair.once repairs are complete, technicians will pressure-test the waterline to verify the repair is holding and that no leaks are present. the tunnel will then be backfilled upon completion of the repair.this estimate includes tunneling only 13ft and repair of the identified leaking waterline only. any unforeseen obstacles outside the original scope will be discussed with the customer and approved before proceeding.ion plumbing will have an engineer report done once backfill is complete · 104 m away
- 16318 Fallkirk DrJun 22, 202650 electric water heater in outside closet reroute water line overhead · 114 m away
- 16306 Fallkirk DrJul 14, 2025Mcrbat 16306 fallkirk dr - for the installation of 34 rooftop solar panels and 2 batteries · 128 m away
- 16321 Fallkirk DrJul 17, 2026Replacing 3 ton complete system · 132 m away
- 16311 Fallkirk DrJun 9, 2026Repair/replace gas line in home and place on test · 154 m away