3500 S. Terminal Road
Houston, TX 77032 · Iah Terminal C
Terminal C office relocation and interior renovation at IAH
A 1,770-square-foot interior renovation at 3500 S. Terminal Road includes relocating the PPBM office to Terminal C, renovating an existing bathroom and adding a coffee bar, power, data and furniture. The project was registered with TDLR on September 10, 2024, and is listed as closed; the applicant estimated the project cost at $200,000.
Summarized from Texas Department of Licensing and Regulation records · updated Sep 10, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Sep 10, 2024
- since Sep 10, 2024
- Largest scope
- 1,770 sf
- Estimated cost
- $200K
- state registration
Where this project stands
CompletedTerminal C - PPBM Relocation
1,770 sq ft · $200K est.
- RegisteredSep 10, 2024
- Plan review
- ConstructionOct '24 – Feb '25
- Inspected
- Closed
Ran as a 4-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectInterior renovations for terminal c including relocation of ppbm office to terminal c, renovation of existing bathroom, new coffee bar, addition of power, data, and furniture. — iah terminal c
TDLR project registrationRenovation/AlterationProject Closed1,770 sq ft$200K est.- Project #
- TABS2025000641
- Tenant / owner
- Terminal C - Ppbm Relocation
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3500 S. Terminal Road
What is being built at 3500 S. Terminal Road in Houston?
The TDLR registration describes interior renovations in Terminal C, including relocating the PPBM office, renovating an existing bathroom and adding a coffee bar, power, data and furniture.
What is the Terminal C PPBM Relocation project?
It is a 1,770-square-foot renovation registered as TABS2025000641. The project is listed as closed.
When was the Terminal C renovation registered?
The project was registered on September 10, 2024.
How much is the Terminal C renovation expected to cost?
The applicant estimated the project cost at $200,000, according to the TDLR registration.
What's being renovated near IAH Airport?
The project is inside Terminal C at 3500 S. Terminal Road, near IAH Airport. It includes an office relocation, bathroom renovation and new coffee bar.
Is a new coffee bar opening in Terminal C at IAH?
The TDLR description includes a new coffee bar as part of the Terminal C interior renovation. It does not provide an opening date.
Also being built nearby
All of 77032- 3500 South Terminal Rd Terminal E, Level 2 · Iah AirportOct 27, 2025Terminal e pedestrian bridge/storage modifications — renovation/alteration — install new wall to establish larger storage room. replace existing 3 foot door with new 4 foot door in same location
- 3500 South Terminal Rd · City Of Houston - Houston Airport System DivisionDec 19, 2025Terminal c facilities space centralization project — renovation/alteration — buildout new office space and shop space in exterior lower ramp0 level storage area under concourse. this will include new restrooms, new breakroom, locker rooms, office space and shop areas. it will also include enclosing area for interior space w
- 3575 S Terminal RdSep 6, 2023Term c concrete road way restoration - bsg-2023-28-iah · 37 m away
- 3500 S Terminal RdMay 5, 2025Terminal c ppbm relocation - bsg-2024-266-iah · 104 m away
- 3500 S TerminalFeb 27, 2025Ua - en23-b tbt c40-c41 - vdgs relocation - bsg-2024-376-iah · 104 m away
- 3550 N Terminal C Rd GarJul 11, 2025Iah termc garage signage & wayfinding -pn794g - bsg-2024-111-iah · 111 m away
- 3500 N Terminal C Rd Se216Apr 22, 2025Bsg-2024-246-iah - ua - united airlines (iah) terminal c ramp remo · 125 m away
- 3500 N Terminal C 200Jun 13, 2024Popeyes - bsg-2023-314-iah · 125 m away
- 3500 N TerminalJul 31, 2024Ua - iah d1 & c43 tunnels temporary drainage - bsg-2024-42-iah · 125 m away
- 3500 N Terminal C Rd Cs719Apr 17, 2025Garrett popcorn signage - bsg-2023-222-iah · 125 m away
- 3500 N Terminal Rd Cs720Sep 10, 2025Health review only bsg-2025-63-iah · 125 m away
- 3500 N Terminal C 201Sep 8, 2025Velvet taco remodel - bsg-2025-44-iah · 125 m away