3500 South Terminal Rd Terminal E, Level 2

Houston, TX 77032 · Iah Airport

IAH Terminal E storage room and door modifications

A TDLR registration describes alterations to a storage room on Level 2 of Terminal E at 3500 South Terminal Road. Filed October 27, 2025, the work includes adding a wall to enlarge the storage room and replacing a 3-foot door with a 4-foot door in the same location. The registration lists an applicant-estimated cost of $50,000 and a status of Inspection Complete.

Summarized from Texas Department of Licensing and Regulation records · updated Oct 27, 2025

Projects
1
1 filings
Latest filing
Oct 27, 2025
since Oct 27, 2025
Largest scope
8,205 sf
Estimated cost
$50K
state registration

Where this project stands

Inspected · closing out

Terminal E Pedestrian Bridge/Storage Modifications

8,205 sq ft · $50K est.

  1. RegisteredOct 27, 2025
  2. Plan review
  3. ConstructionNov '25 – Dec '25
  4. Inspected
  5. Closednow

The building is substantially done. Move-in, fit-out and service work usually follow.

4 contacts on this project · 4 phone numbers

Permit & project history

1 project
  1. Install new wall to establish larger storage room. replace existing 3 foot door with new 4 foot door in same location. — iah airport

    TDLR project registrationRenovation/AlterationInspection Complete8,205 sq ft$50K est.
    Tenant / owner
    Terminal E Pedestrian Bridge/Storage Modifications
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 3500 South Terminal Rd Terminal E, Level 2

What is being modified at 3500 South Terminal Road Terminal E?

The registered work is to enlarge a storage room on Terminal E's Level 2 by adding a wall and replacing a 3-foot door with a 4-foot door in the same location. The TDLR filing is dated October 27, 2025.

When was the Terminal E storage modification filed?

The TDLR registration, TABS2026004278, was filed October 27, 2025.

How much will the Terminal E modifications cost?

The TDLR registration lists an applicant-estimated cost of $50,000. This is an estimate for the registered work, not a confirmed final cost.

Is the Terminal E storage work complete?

The TDLR record lists the project status as Inspection Complete. The filing describes a new wall for a larger storage room and a wider door.

What's being changed near Common Bond at IAH?

A storage room and door are being modified in Terminal E, Level 2, at 3500 South Terminal Road. Common Bond is listed in Terminal D, about 214 meters away.

What work is planned near the Terminal C Facilities Space Centralization Project?

The Terminal E registration describes storage-room and door modifications. The Terminal C Facilities Space Centralization Project is a separate nearby project listed at the same street address.

Also being built nearby

All of 77032

More warehouses & industrial in 77032.

Email me when the project is closed